• Title/Summary/Keyword: Detail design

Search Result 2,151, Processing Time 0.025 seconds

Topology Optimization Using Digital Images (디지털 이미지를 이용한 위상최적설계)

  • Shin, Woon-Joo;Min, Seung-Jae
    • Korean Journal of Computational Design and Engineering
    • /
    • v.11 no.4
    • /
    • pp.265-272
    • /
    • 2006
  • For the design and analysis of 3D object featuring complexity and irregularity in shape, sectional digital images measured by an industrial CT scanner are employed to generate a finite element model with uniform voxels. The voxel model plays a key role in developing an integrated reverse engineering system including geometric modeling, simulation and optimization. Design examples applied to topology optimization show that the proposed approach can provide a remarkable reduction in time cost at the conceptual and detail design stages.

Fatigue Strength Assessment of A Longitudinal Hatch Coaming in a 3800 TEU Containership by ABS Dynamic Approach

  • Cui, Weicheng;Yang, Chunwen;Hu, Jiajun
    • Journal of Ship and Ocean Technology
    • /
    • v.3 no.4
    • /
    • pp.35-51
    • /
    • 1999
  • Fatigue strength assessment procedures have been implemented in the ship design rules by many classification societies. However, a large variation tin the details of the different approaches exists in practically all aspects influding load history assessment, stress evaluation and fatigue strength assessment. In order to assess the influences of thesd variations on the prediction of fatigue lives. a comparative study is organized by the ISSC Committee III.2 Fatigue and Fracture. A pad detail on the top of longitudinal hatch coaming of a panamax container vessel is selected for fatigue calculation. The work described in this paper is one set of results of this comparative study in which the ABS dynamics approach is applied. Through this analysis the following conclusions can be drawn. (1) With the original ABS approach, the fatigue life of this pad detail is very low, only 2.398 years. (2) The treatment of the stillwater bending moment in the ABS approach might be a source of conservatism. If the influence of stillwater bending moment is ignored, then the fatigue life for this pad detail is 7.036 years. (3) The difference between the nominal stress approach and the hot spot stress approach for this pad detail is about 26%.

  • PDF

LOD Representation for the Realtime Simulation of Flocking Objects (군집행동개체의 실시간 애니메이션을 위한 단계별 상세화 표현)

  • Cho S.H.;Chai Y.H.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.10 no.5
    • /
    • pp.339-348
    • /
    • 2005
  • In this paper, LOD (Level Of Detail) for flocking, which is the real-time simulation on the movement or some groups such as fighting soldiers, moving fishes and flying birds, is presented. And a flocking LOD algorithm that uses factors such as the speed of fish, direction, and shape is proposed. Model data is modified for LOD in advance, so as to reduce strange edge collapse and unwanted holes. The errors of model data were identified by transforming polygonal model into octree-based cubes and revised before rendering. Experimental results show that the proposed algorithm considering flocking characteristics shows fast frame rates as compared with the conventional continuous LOD algorithm.

A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects (해외 화공플랜트 건설사업 위험요인 영향도 분석)

  • Cho, Seung-Yeon;Kim, Young-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

KSLV-1 1st stage Rear Fuselage Upper Compartment Detail Design (KSLV-1 1단 후방동체 상부 조합체 상세설계)

  • Yoo, Jae-Seok;Jeong, Ho-Kyeong;Jang, Soon-Young
    • Aerospace Engineering and Technology
    • /
    • v.8 no.1
    • /
    • pp.117-131
    • /
    • 2009
  • In this study, a detail design was conducted for KSLV-1 1st stage Rear Fuselage Upper Compartment assembly. A basic structural sizing was done by the aircraft fuselage sizing in-house program. The frame structural design and the interface check were conducted by the FE and the CAD program. The structural margin of safety was conformed by FE analysis for the normal section model and duct cut-out section models which are the weakest parts of the rear fuselage. The shear stress analysis was performed for a fastener design of the skin-stringer which is most affected by the shear stress induced by the shear load.

  • PDF

Utilization of Failure Examples in Detail Design for Oil and Petrochemical Plant Project (석유화학 플랜트 프로젝트 상세설계 실패사례활용방안에 대한 연구)

  • Kang, Tae-Young;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.2
    • /
    • pp.62-67
    • /
    • 2009
  • The capability of design and engineering of global EPC companies has long been equalized through past similar construction experiences. Among various key factors in the success of EPC project, the capability of engineering is considered to be the most important factor since the engineering is preceding activities of EPC contract. The failure of engineering may adversely affect the subsequent procurement & construction activities and in turn may cause cost overrun or schedule delay. Therefore, an EPC company needs to continue to improve the engineering capabilities for the success of project. The engineering capabilities can be further improved if the EPC company should prevent recurrence of similar design faults that were previously committed. This study is intended to present how to make the most of the failure examples from previous projects towards a success of project. Failure is but a stepping stone to success. The EPC company can obtain useful lessons from the analysis of past failure examples.

  • PDF

Development of BIM Library for Civil Structures based on Standardized Drawings-Focused on 2D Standard Drawings of The MOLIT (표준도 기반의 토목구조물 BIM 라이브러리 개발 -국토교통부 표준도를 대상으로)

  • Moon, HyounSeok;Ju, KiBum
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.1
    • /
    • pp.80-90
    • /
    • 2014
  • In architecture projects, BIM library has widely been using for prefabrication of products and design process. However, since the shape of structures is different by each project in civil engineering projects and a shape representation system is complicated, it is not easy to develop a standardized BIM library. To solve these issues, this study develops BIM library based on standardized 2D shop drawings for civil structures. The standardized shop drawings, which are the targets of the BIM library model, should be first selected. Besides, in order to define modeling scope with the level of general and shop drawings for each structure, LOD(Level of Detail) and breakdown structure are determined, and development methods of families of 3D object type including 2D profile and rebar through commercial software are established. With these, properties of BIM library are configured, and a utilization model of the BIM libraries is constructed for 3D modeling and a simulation using the BIM library. Therefore, this study can identify properties that are necessary when IFC schema is configured for civil engineering projects. For future, it is expected that easiness of BIM design for the civil engineering projects and generation, management, and analysis system of BIM library for road projects will be secured.

Seismic Performance of Special Shear Wall Structural System with Effectively Reduced Reinforcement Detail (완화된 단부 배근상세를 갖는 특수전단벽 구조시스템의 내진성능평가)

  • Chun, Young-Soo;Lee, Ki-Hak;Lee, Hyo-Won;Park, Young-Eun;Song, Jin-Kyu
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.3
    • /
    • pp.271-281
    • /
    • 2013
  • The current seismic design code prescribes that a structural wall should be designed as a special shear wall when the building height is more than 60 m and its seismic design category is classified as D. However, the use of a special shear wall has a negative effect on constructability and economic efficiency. In the present study, the seismic performance of a special shear wall and a special shear wall with relaxed reinforcement detail was evaluated through a cyclic reversal loading test. The specimens were constructed to measure the results of the experimental variable regarding the reinforcement details of the special boundary element. Next, the seismic performances of a special shear wall structural system and that of a special shear wall structural system with relaxed reinforcement detail was evaluated by methods proposed in the FEMA P695. The cyclic reversal loading test results of this study showed that the performance of the shear wall with relaxed reinforcement detail was almost similar to the performance of a special shear wall and has the performance which requested from standard. The results of the seismic evaluation showed that all special shear walls with relaxed reinforcement detail are satisfied with the design code and seismic performance.

Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule (중일정계획을 고려한 선체 생산설계 작업할당 시뮬레이션)

  • Son, Myeong-Jo;Kim, Tae-Wan
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.50 no.5
    • /
    • pp.334-342
    • /
    • 2013
  • In this paper, we analyze the procedure of the design manager for the enhancement of the hull production design process by use of the simulation method. Normally, design manager assigns design jobs according to various methods and estimates the corresponding results. When the construction drawing which is the output of the detail design where a design is dealt by zones, the design manager identifies blocks and analyzes their work difficulties, and assigns jobs to design engineers who are different in capabilities. These processes including the design engineer who can be modeled with man-hours evaluation model are represented in detail as a simulation model. As the high-level modeling for the discrete-event system, we use Event Graph model. And we implemented the simulation using Simkit which is open simulation engine for the discrete-event system. We made the simulation scenario to be written by a user in the scenario generator which is separated from the simulation model, and made the simulation result to be visualized in the form of Gantt chart in a Web. In the scenario of the irregular issuance for various construction drawings which contain different numbers of blocks, we performed the Monte-Carlo simulation according to various assignment methods to find the assignment result that satisfies the mid-term schedule.