Consecutive Design VE Process Emphasized on Follow-up Activities (Follow-up 활동을 강조한 연속적 설계VE 프로세스)

  • Yang, Jin Kook;Moon, Sung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.235-244
    • /
    • 2009
  • Design Value Engineering (VE) has become an import part of the daily design process since it has been introduced in the construction industry. Design VE is usually conducted in the general and execution design stages respectively. In order to increase the effectiveness of the VE process, the outcome from the general design VE activities should be integrated into execution design. The outcome from the execution design should be used again for construction. In this study, a consecutive VE process model has been presented as a way to improve the current practice of design VE activities in the construction industry. In the presented model, follow-up activities are emphasized to increase values from the life-cycle perspective of a construction project. The model was tested in a case study of an actual design VE process. The result of the study demonstrates that the model can: 1) effectively incorporate owners requirements; 2) assist decision making in selecting better construction; 3) increase the interface between general and execution design stages; and 4) trace the value flow more efficiently. Overall, the study results indicates that a the consecutive VE process model can be effectively applied when construction project are contracted for the life-cycle management of construction projects.

A study on the effective propulsion method of design VE that used TRIZ (TRIZ를 활용한 설계VE의 효율적 추진방안)

  • Oh, Jae-Won;Kim, Kwang-Soo
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.1
    • /
    • pp.177-187
    • /
    • 2012
  • Design VE is a kind of contradictive administrating that pursue both value improvement and cost reduction, whereas TRIZ is a method used to solve contradiction based on its invention principal. This paper comprehended the problems regarding the object through design VE using function analysis, and presented a number of methods to solve this by using the principal of TRIZ. This study compared the characteristics of Design VE and TRIZ, and suggested a procedure that integrates both Design VE and TRIZ.

  • PDF

Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.

A Study on Competency Evaluation Checklist of Design Phase VE Team (설계VE팀의 역량평가 체크리스트에 관한 연구)

  • Seo, Ha-Na;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.154-162
    • /
    • 2008
  • Ministry of construction and transportation has been enforcing extensionally design phase VE(Value Engineering) to the construction costing more than 10 billion won, an importance of design phase VE accordingly is raising to get rid of a waste of cost and noneffective factors previously in construction projects. Although there are legal supports and technical effects, an effect about an introduction of design phase VE can not be applied properly because of several problems at the process. So, in this study, present competency factors of design phase VE to highly raise the output through organizing an effective team at the beginning stage of design phase VE. Find out 29 competency factors through characteristics of design VE team for the check list, classify by team knowledge, team work skill, and team attitude. Get an efficiency regarding importance and find out Competency Evaluation items of design VE team, present a Competency Evaluation plan for indicating an objective standard to Competency Evaluation by measuring relative importance as to each Competency Evaluation item.

A Study on the Improvement for Design VE Job Plan through the Benchmarking (벤치마킹을 통한 설계VE 추진절차 개선에 관한 연구)

  • Um Ik-Jun;Jung Young-Il;Kim Chul-Woong;Hyun Chang-Teak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.88-95
    • /
    • 2001
  • To convert the construction industry from 'the high cost, the low efficiency' to 'the low cost, the high efficiency and value-added industry' and to enhance the performance and quality of products while reducing the cost, the related law and guideline were established and promulgated, which regulate that value engineering workshop during the preliminary design and the detail design stage should be a mandatory process. But VE practitioners are still confusing in choosing the proper value engineering process, because processes those are described in the various references use the different terms, steps and activities, even though they have their own specific characteristics. To resolve these confusions, the existing steps and activities of three kinds of the literature, four kinds of the organization's policy and other four kinds of study examples relating to the design VE were examined. And then, the differences and expecting problems were extracted through the comparison and analysis of those materials. After that, VE specialists' opinion through the questionnaire survey were grasped. Based on those studies the improved design VE Job Plan and activity statements were suggested.

  • PDF

Project Participants Cooperative Decision Making Model with QFD-based VE Technique (프로젝트 참여자의 협력적 의사결정이 가능한 QFD 기반 VE 모델)

  • Lim, Chulhee;Chun, Jaeyoul;Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.3-12
    • /
    • 2019
  • VE analysis is a method to secure definite functions and performance by defining user's various requirements clearly and propose alternatives to reduce cost. However, the present domestic VE project has difficulty in defining design function analysis clearly due to time constraints as well as difficulty in effective and efficient communication between project stakeholder. Domestic results of VE were largely focused on reducing cost while maintaining the functions of the existing facility. Therefore, this study aims to secure the optimal functions for users according to the original intent of user requirements through QFD-VE model which project VE participants can make collective and cooperative decision making. QFD-VE is a technique that first, it can make collaborative decision making in defining and modifying of design function and setting the importance of requirement function. Second, it allow project VE participants to check design interference and conflict between neighbor systems. This study also provided a mathematical model for implementing the computer system using QFD-VE in the future.

Implementation Status and Improvement Strategy of the Value Engineering in Domestic Construction Industry (국내 건설VE 운영현황과 발전방향)

  • Seo, Yong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.137-144
    • /
    • 2007
  • In the year of 1980 and 2000, the Korean government institutionalized the Value Engineering methodology in the construction phase and the design phase respectively. While design-phase VE have been applied to construction industry actively, which was institutionalized 7 years ago, construction-phase VE have not been applied to industry frequently, although it was institutionalized 25 years ago. On the other hand, at the time of social demands for VE is increasing, it has been pointed out that VE should be compatible with the delivery system. And the time of VE study, the operational management of VE study, and the maintenance process of the result of the VE study also should be considered. In this study, a scheme to improve VE methodology in the construction industry is proposed based on the literature review and the data analysis of domestic and foreign state of VE.

  • PDF

An Application of Value Engineering to Design-Build Projects at Design Development Phase (설계${\cdot}$시공일괄 사업의 실시설계단계 VE적용 방안에 관한 연구)

  • Jung Jae-Jin;Kim Jae-Hyun;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.294-298
    • /
    • 2003
  • Recently, Design-build project as delivery system public construction sector tends to be increased according to the Masterplan for promotion of construction technologies, and construction projects are increasing their complexity, variety and scale. And owner's requirements become various. Preliminary design for design eligibility judging of design-build has been designed excessively to get a good point and this tendency includes the elements which is capable of wasting the budget. Because of excessive design, owners require to apply VE study into the design development phase but in the Design-build system, VE application has not been of no effect that owners expect, owing to the characters of lum-sum contracts. The purpose of this study is to propose the plan for effective application of VE in the design development phase in order to solve the problems such as excessive design of preliminary design in the design-build project. This study established plans for VE application through investigating and analyzing VE application case and then proposed the applications in the aspect of regulations and contracts, parties participated in project, VE operation through research for verification of usefulness.

  • PDF

Definition of Environmental Cost and Eco-VE Model for Eco-VE of Construction Facility (건설시설물 친환경 VE를 위한 환경비용 및 친환경가치모델 정립)

  • Kim, Myung-Jin;Kim, Joon-Soo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.903-913
    • /
    • 2016
  • Paris Agreement of Climate Change seem affect to Korea eco-policy. Meanwhile the eco-design for reduce carbon emission have been applied in design phase of construction. However eco-design have applied passively except the project of eco-building system. For reflect eco-component in design, design VE that be appling to basic design and executing design phase of all construction project of over 10 billion should be use. But present applying VE Job Plan is reflecting partly eco-component, so the effect is small. Therefor new eco-VE development that reflect eco-elements to exist VE need. As the result of this study, the concept of environmental cost is defined to accounting. The calculation of the cost was using methods that apply $CO_2$ emission trading price, WTP, carbon productivity concept and carbon tax based on $CO_2$ emission. However, in order to apply eco-friendly VE at design phase, the model of new concept included carbon productivity concept is necessary. The eco-friendly VE model of new concept is model using $CO_2$ emission and potential environmental pollution index (PEPI). This study tried define eco-value model and environmental cost definition that become the major axle of eco-VE.

Practices in VE/LCC based Design of Harbor Structures (VE/LCC기법의 항만구조물 설계적용 사례분석연구)

  • Yoon, Gil-Lim;Kang, Oh-Ram;Kim, Dong-Hyawn
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.20 no.4
    • /
    • pp.390-400
    • /
    • 2008
  • Reports on VE/LCC based coastal structural design were analyzed to derive possible improvement. VE/LCC technique may be effectively applied to making decisions in coastal structural design. However, it has not been well utilized in recent projects for some problems. Therefore, recent project reports on VE/LCC have been analyzed and merits and demerits were classified. Then, the reason why VE/LCC cannot be effectively applied to real projects was drived. Finally, some pre-requisites to improve the technique were summarized.