• Title/Summary/Keyword: Design Project Planning

Search Result 588, Processing Time 0.024 seconds

Cost prediction model of Public Multi-housing Projects in Schematic Design Phase (공공아파트 계획설계단계에서의 공사비 예측모델)

  • Kwon, Ho-Suk;Moon, Hyun-Seok;Lee, Sung-Kyun;Hong, Tae-Hoon;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.65-74
    • /
    • 2008
  • Public institutions recognize the importance of cost management from the planning stage but they do not have an organized construction cost estimation and management system. Thus, at the stage of planning a new public construction project and estimating the cost, those in charge of budgeting estimate construction cost based on existing data and experiences, compare construction cost estimated after the basic design stage and the execution design stage with budgets, and then decide whether to continue the project or change the design according to the budgets. Therefore, we would develop the cost prediction model through regression analysis that can predict construction cost in Schematic Design Phase of the Public Multi-Family housing. Accordingly, if public institutions have a construction cost prediction model and management system that can estimate the optimum construction cost, they can make and execute budgets in a more efficient way than they do at present.

A Study on the Cases of Folly Project in the Contemporary Architecture After Parc de la Villette (라빌레뜨 이후 현대건축에서 나타난 폴리 프로젝트 사례 연구)

  • Kang, Hyo-Jeong
    • Korean Institute of Interior Design Journal
    • /
    • v.23 no.3
    • /
    • pp.144-152
    • /
    • 2014
  • This study evaluated how folly is experimented in the contemporary architecture after 30 years when Bernard Tchumi first introduced it to the public by the modern transformation as a garden ornament. First, folly project has been carried out based on the general concept of energizing dwindling cities. However, it has changed to the direction of adding specific programs. Also, along urban regeneration that does not change deterioration of previous structures, Folly changed in the emphasis on readjust existing structure. Second, by having different designers presenting their own follies during the Osaka Expo, folly now has part on visual exhibition element. This has similarity with public art project, yet it could more actively intervene for urban regeneration compared to conventional environment sculpture. Third, folly is experimented as the event-installation art combined form of architecture and art where people could experience the space and enjoy art. Fourth, folly enabled the landscaping of architecture and expanding city planning. Recently Gwangju Folly invited various arts, social, and cultural professionals to converge city design with architecture, landscaping, and other diverse genres.

Development of Automation Technology for Modeling of Railway Infrastructure using BIM Library (BIM 라이브러리를 활용한 철도 인프라의 모델링 자동화 기술 개발)

  • Kim, Yun-Ok;Moon, So-Yeong;Yoon, Hee-Taek;Park, Young-Kon;Kim, Ji-Young
    • Journal of KIBIM
    • /
    • v.12 no.3
    • /
    • pp.18-29
    • /
    • 2022
  • Recently, research on the application of BIM has continuously been active not only in architecture but also in civil engineering in order to improve work efficiency across the project's planning, design, construction and maintenance phases. However, the empirical applications of BIM targeting to civil engineering scope of construction sites still lags compared to architectural sized projects. This is because BIM tools are mainly based upon vertical structures of architecture, thereby most of them have difficulties and limitations to get utilized on horizontal structures of civil engineering. Therefore, this study intends to propose automation technology of design using BIM library and to indicate its field availability through case application on a railway project representing linear infrastructure. In addition, it put forward the utilization plan of the automation technology upto 4D and 5D by continue making use of the BIM model created in the project's design stage up through the maintenance stage. The novel method of the technology proposed in this paper incorporates the automatic creation of the BIM library based on two-dimensional tunnel cross-sections and sweeping of it over three-dimensional alignment to create a BIM model of linear infrastructure. The proposed technology is anticipated to improve the efficiecny of modeling process of railway projects based on linear structures.

A Study on the Improvement and Application of Environmentally-Friendly Factors at Outdoor Spaces in Apartment Complexes (공동주택단지 외부공간 친환경 요소의 적용현황 및 개선점 연구)

  • Choi, Yun;Song, Byeong-Hwa;Yang, Byoung-E
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.3
    • /
    • pp.37-49
    • /
    • 2007
  • This study investigated how external environmentally-friendly factors adopted to improve the quality of outdoor spaces have been designed and used in the construction of apartment complexes. The goal of this study is to determine what areas should be improved through environmentally-friendly ways to create natural outdoor spaces in apartment complexes and enhance their availability and usefulness. For this study, 21 environmentally-friendly factors were chosen and a checklist by specific item was prepared. This study examine how these items were applied to basic planning, detail design, and construction in 4 target areas. As a result, it was found that the development of environmentally-friendly residential areas was an ultimate goal of the project during basic planning and design. All target areas focused on developing an inner greens network, eco-pond, brook, and pedestrian track as well as the growth of a variety of plants. Some differences have been observed, however, in terms of method. Furthermore, due to economic and technological problems and poor construction site conditions, green walls/green roofs/pedestrian tracks/use of rainwater have not been properly promoted. These kinds of problems must be improved through the development of environmentally-friendly construction methods and materials, the expansion of natural grounds areas, economic support, a satisfactory repair and maintenance system.

A Case study on the Composition and Form of a Local Residential Area -Focused on the Residential Area of Bercy and Reuilly in Paris- (지역주거지의 형태와 구성에 관한 사례연구 -파리 베르시 및 뢰이이 주거지를 중심으로-)

  • Park, Sun-Uk
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.31-38
    • /
    • 2010
  • This study aims to present the basic criterions about the planning of local residential area in the middle or small city with an analysis of several samples in Paris, where is currently realizing many various housing projects and residential area development, especially theirs development methods, form and composition of theses samples and residential areas. At this object, this study was preceded with 3 main contents. Firstly, it has examined the development method, procedure and development samples, which is the precedence step for the organization of dwelling zone. Secondly, after presenting the criterions analysis of residential area's samples as drew the concept related with the presented residential area planning in corresponded cases, it has analyzed about the practical planning factors applied at each samples. Lastly, regarding precedent studies, it has examined the relation between planning factors and theory factors. The residential development in Paris, which was examined by this study, has been achieved through reasonable procedure from the superior concepts to detail planning and concept design for the project and the analysis result like this is expected to use as the basic criterions for the development and planning orientation of local residential area in Korea.

A Case Study on Design Development for Promotional Fashion Product Assigned to the Corporate Image (기업의 이미지를 부여한 홍보용 패션상품 디자인 개발 사례 연구)

  • Nam, Mihwa;Park, Hyewon
    • Journal of Fashion Business
    • /
    • v.17 no.4
    • /
    • pp.58-74
    • /
    • 2013
  • This research is a case study for the planning process and production process of design project done through industry-university collaboration research. Proposed for the design process and result for the development of the corporation's promotional fashion items. In addition, during the 3-month study period, went through the research process of a number of design, planning, meetings, discussions, and colorway, sample production and selection. The study was carried out using mainly necktie and scarf, the ones one can make use of the best among men's and women's fashion items as fashion items for promotion. The design work was done using Adobe Photoshop CS5, Adobe Illustrator CS5, Texpro 11 version programs. This study is a design development case study where design research experts and the persons in charge from the company took part in for the PR the company demands, and wish it to be used as a basis material for improving company image as a fashion product for the PR of a company.

Development of Expert system for Plant Construction Project Management (플랜트 건설 공사를 위한 사업관리 전문가 시스템의 개발)

  • 김우주;최대우;김정수
    • Journal of Information Technology Application
    • /
    • v.2 no.1
    • /
    • pp.1-24
    • /
    • 2000
  • Project management in the Construction field inherently has more uncertainty and more risks relative to ones from other area. This is the very reason for why project management is recognized as the important task to construction companies. For getting better performance in the project management, we need a system that keeps the consistencies in a automatic or semi-automatic manner through the project management stages like as project definition stage, project planning stage, project design and implementation stage. But since the early stages such as definition and planning stages has many unstructured features and also are dependent to unique expertise or experience of a specific company, we have difficulty providing systematic support for the task of these stages. This kind of problem becomes harder to solve especially in the plant construction domain that is our target domain. Therefore, in this paper, we propose and also implement a systematic approach to resolve the problem mentioned for the early project management stages in the plant construction domain. The results of our approach can be used not only for the purpose of the early project management stages but also can be used automatically as an input to commercial project management tools for the middle project management stages. Because of doing in this way, the construction project can be consistently managed from the definition to implementation stage in a seamless manner. For achieving this purpose, we adopt knowledge based inference, CBR, and neural network as major methodologies and we also applied our approach to two real world cases, power plant and drainage treatment plant cases from a leading construction company in Korea. Since these two application cases showed us very successful results, we can say our approach was validated successfully to the plant construction area. Finally, we believe our approach will contribute to many project management problems from more broader construction area.

  • PDF

Characteristics of Planning Process of Residents' Participation in Community Village Construction by the Rural Village Development Policy - Focused on the Jagun Maul of Namwon-city in Jeonbuk-do - (전원마을조성사업에 의한 귀촌형 공동체마을의 주민참여 계획과정 특성 - 남원시 작은마을을 중심으로 -)

  • Park, Kyoung-Ok;Lee, Sang-Un;Ryu, Hyun-Soo
    • Journal of the Korean housing association
    • /
    • v.24 no.3
    • /
    • pp.135-147
    • /
    • 2013
  • The purpose of this study is to make a proposal for the planning of the back-to-farming community village. For this study of a community village designed by residents, the information on the residents' participation and the role of a coordinator in the whole planning process of the community village were investigated, based on the rural village development policy. The community village studied here is located at Sannae-myeon, Namwon-city in Jeonbuk-do. Interviews were answered by 17 households and a process coordinator. The results are as follows. 1) The process coordinator participated in the project on the design of village, permission documentation, and construction from the beginning. The coordinator and residents met every month, and discussed the respective housing and the village environment regulation. 2) Every house has its own plan, but the architectural coordinator's counseling and coordination in the planning process resulted in higher participation. Function of common spaces were determined by residents' participation. Finally, common spaces consist of 2 buildings that one would have as much as open spaces to accommodate as many as residents' activities and the other have business facilities. 3) The political assistance is needed to activate construction of resident-participation typed community villages; development of the conflict coordination program and coordinator education program for operation & planning.

Undergraduate courses for enhancing design ability in naval architecture

  • Lee, Kyu-Yeul;Ku, Namkug;Cha, Ju-Hwan
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.5 no.3
    • /
    • pp.364-375
    • /
    • 2013
  • Contemporary lectures in undergraduate engineering courses typically focus on teaching major technical knowledge-based theories in a limited time. Therefore, most lectures do not allow the students to gain understanding of how the theories are applied, especially in Naval Architecture and Ocean Engineering departments. Shipyards require students to acquire practical ship design skills in undergraduate courses. To meet this requirement, two lectures are organized by the authors; namely, "Planning Procedure of Naval Architecture & Ocean Engineering" (PNAOE) and "Innovative Ship Design" (ISD). The concept of project-based and collaborative learning is applied in these two lectures. In the PNAOE lecture, sophomores receive instruction in the designing and building of model ships, and the students' work is evaluated in a model ship contest. This curriculum enables students to understand the concepts of ship design and production. In the ISD lecture, seniors learn how to develop their creative ideas about ship design and communicate with members of group. They are encouraged to cooperate with others and understand the ship design process. In the capstone design course, students receive guidance to facilitate understanding of how the knowledge from their sophomore or junior classes, such as fluid mechanics, statics, and dynamics, can be applied to practical ship design. Students are also encouraged to compete in the ship design contest organized by the Society of Naval Architects of Korea. Moreover, the effectiveness of project-based and collaborative learning for enhancing interest in the shipbuilding Industry and understanding the ship design process is demonstrated by citing the PNAOE and ISD lectures as examples.

Success Factors of Highway Construction Projects in Egypt: AHP Approach

  • El-Maaty, Ahmed Ebrahim Abu;El-Hamrawy, Saad;Akal, Ahmed Yousry
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.7-14
    • /
    • 2016
  • While the idea of the existence of a set of key factors for success in planning, designing and construction of projects is not new, it remains one of the most important issues in the field of construction management. This is due to project success factors are inputs to project management practice which can lead directly or indirectly to project success. This study identifies the success factors which can be used for improving the highway projects performance in Egypt during the project pre-construction and construction phases. Through a detailed literature review 35 success factors are identified. Furthermore, the AHP is adopted to prioritize the studied factors through the application of questionnaire survey. The study establishes that implementing an effective quality control and assurance systems, allow sufficient time for feasibility studies, design, drawing and tender preparation, effective cost control system and frequency of project budget updates, preparing adequate designs and drawings and determining sufficient time to implement the desired scope of work are the most important success factors for enhancing the highway projects performance in Egypt.