• Title/Summary/Keyword: Design Development Test

Search Result 4,082, Processing Time 0.036 seconds

The design and the full load test results of 765kV tower foundation (765kV 철탑기초 설계 및 기초재하시험)

  • Kim, J.B.;Cho, S.B.
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.447-449
    • /
    • 1995
  • In terms of a new development on the foundation design of 765kV tower and its applications, a revolutionary turning point comes out through this study in approaching the new concept, what we call "Rock anchor" "Deep foundation" to tower foundation which was officially approved by the full load test. this contents is described of the foundation design and the results of full load test for two types foundation.

  • PDF

The Overview of CEU Development for a Payload

  • Kong, Jong-Pil;Heo, Haeng-Pal;Kim, Young-Sun;Park, Jong-Euk;Chang, Young-Jun
    • Proceedings of the KSRS Conference
    • /
    • v.2
    • /
    • pp.797-799
    • /
    • 2006
  • The Electro-optical camera subsystem as a payload of a satellite system consists of OM (optical module) and CEU(camera electronics unit), and most performances of the camera subsystem depend a lot on the CEU in which TDI CCDs(Time Delayed Integration Charge Coupled Device) take the main role of imaging by converting the light intensity into measurable voltage signal. Therefore it is required to specify and design the CEU very carefully at the early stage of development with overall specifications, design considerations, calibration definition, test methods for key performance parameters. This paper describes the overview of CEU development. It lists key requirement characteristics of CEU hardware and design considerations. It also describes what kinds of calibration are required for the CEU and defines the test and evaluation conditions in verifying requirement specifications of the CEU, which are used during acceptance test, considering the fact that CEU performance results change a lot depending on test and evaluation conditions such as operational line rate, TDI level, and light intensity level, so on.

  • PDF

Design Procedure for System in Package (SIP) Business

  • Kwon, Heung-Kyu
    • Proceedings of the International Microelectronics And Packaging Society Conference
    • /
    • 2003.09a
    • /
    • pp.109-119
    • /
    • 2003
  • o In order to start SIP Project .Marketing (& ASIC team) should present biz planning, schedule, device/SIP specs., in SIP TFT prior to request SIP development for package development project. .In order to prevent (PCB) revision, test, burn-in, & quality strategy should be fixed by SIP TFT (PE/Test, QA) prior to request for PKG development. .Target product price/cost, package/ test cost should be delivered and reviewed. o Minimum Information for PCB Design, Package Size, and Cost .(Required) package form factor: size, height, type (BGA, QFP), Pin count/pitch .(Estimated) each die size including scribe lane .(Estimated) pad inform. : count, pitch, configuration(in-line/staggered), (open) size .(Estimated) each device (I/O & Core) power (especially for DRAM embedded SIP) .SIP Block diagram, and net-list using excel sheet format o Why is the initial evaluation important\ulcorner .The higher logic power resulted in spec. over of DRAM Tjmax. This caused business drop longrightarrow Thermal simulation of some SIP product is essential in the beginning stage of SIP business planning (or design) stage. (i.e., DRAM embedded SIP) .When SIP is developed using discrete packages, the I/O driver Capa. of each device may be so high for SIP. Since I/O driver capa. was optimized to discrete package and set board environment, this resulted in severe noise problem in SIP. longrightarrow In this case, the electrical performance of product (including PKG) should have been considered (simulated) in the beginning stage of business planning (or design).

  • PDF

L-band Pulsed Doppler Radar Development for Main Battle Tank (전차 탑재 L-밴드 펄수 도플러 레이더 설계 및 제작)

  • Park, Gyu-Churl;Ha, Jong-Soo
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.20 no.6
    • /
    • pp.580-588
    • /
    • 2009
  • A Missile Warning Radar is an essential sensor for active protection system to detect antitank missile in all weather environments. This paper presents the design, development, and test results of L-band pulsed Doppler radar system for main battle tank. This radar system consists of 3 LRUs, which include antenna unit, transmitter and receiver unit and radar signal & data processing unit. The developed core technologies include the patch antenna, SSPA transmitter, coherent I/Q detector, DSP based Doppler FFT filter, adaptive CFAR, SIW tracking capability, and threat decision. The design performance of the developed radar system is verified through various ground fixed and moving vehicle test.

A Study on the Development of Testing Models and Its Design System for the Comprehensive Performance Test of the Substation Automation System (변전자동화 종합 성능시험을 위한 시험모델 및 설계시스템 개발에 관한 연구)

  • Lee, Nam-Ho;Jang, Byung-Tae
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.7
    • /
    • pp.63-71
    • /
    • 2011
  • Due to the rapid development of digital technnology and informantion communication, in the IEC 61850 based substation automation system, the innovative paradigm shift is expected and also required in many substation-related jobs, especially in the device function test area Accordingly a common testing model which can simplify the complex contents of the SAS performance test performed by test engineers has been identified, that can overcome limitations of engineers' own testing knowledge and experience. Testing models and its design system for the comprehensive performance test of the Substation Automation System is developed and the result of the study is reported in this paper.

A Basic Study on Development of Web-based Visual Perception Test Program Prototype (웹 기반 시 지각 진단 프로그램의 모형 개발을 위한 기초연구)

  • Ahn, Seong-Hye
    • Archives of design research
    • /
    • v.19 no.2 s.64
    • /
    • pp.5-14
    • /
    • 2006
  • Visual perception is ability that analyze visual information about things accepting through eyes in central nervous system. That is, it is ability that recognize and discriminates a visual stimulus, and analyzes by combining such stimulus with previous experience. At today, work which clears visual perception obstacle's cause through visual perception test and grasps all special quality of visual perception obstacle's is used method of treating that improve visual perception obstacle by visual perception training program. Present, visual perception test tools using the paper and pens are used mainly on psychological consultation of welfare facilities and education for the handicapped or occupational therapy, but a lot of problems are discovered in it. Therefore, purpose of this paper is to develop prototype of web-based visual perception test program that can construct to database to solve existing problem, and to design graphic item. As a result, classified measurement pattern that can diagnose visual perception by three, and illustrated development direction of graphic item for examination with this. Also, extracted check list item that should consider for design and construction of visual perception test program and the variable for feasibility study of believability, and presented process for prototype development.

  • PDF

Korea High Speed Train Design - focused on aerodynamic optimal form design development (한국형 고속전철 디자인 -공기역학적 최적형상 디자인개발을 중심으로-)

  • 이병종
    • Archives of design research
    • /
    • v.17 no.3
    • /
    • pp.123-132
    • /
    • 2004
  • This paper shows a study on the "Korean High Speed Train Design" method, its design process and the result in the form of aerodynamic optimal exterior design development of a prototype test train(HSR 350${\times}$). It was developed from 1996 until 2002, six years long in R '||'&'||' D project titled "Development of High Speed Railway Technology" The end result of the project is a prototype test train, which has two power cars, two motorized trailers and three trailers, had been tested successfully in the year 2003 to the highest speed limit 380km/h on high speed line. The improved conceptual design work of a new commercial train and next generation's train is also performed for future needs.uture needs.

  • PDF

The Development of Face Cover Designs to Activate Outdoor Life (아웃도어 라이프 활성화를 위안 페이스 커버 개발 연구)

  • Kim, Chan-Ju;Ro, Mi-Kyung
    • Journal of the Korean Society of Costume
    • /
    • v.59 no.1
    • /
    • pp.47-59
    • /
    • 2009
  • This paper aimed at the development of face covers which is face protection articles for blocking UV rays and yellow sands, with a view to assist the further activation of outdoor life. The four-stage design process of field study, design, design evaluation, final selection of designs was set up for the effective product development. Field study included on-line and off-line market survey on the products for sale in market and observation on those wearing face covers. Depth interviews were done to know consumer understandings and satisfaction levels for current face covers. The results of market survey showed that most of the face covers currently in the market were mask types, which were produced for the blocking of dust and yellow sands rather than UV ray protection. The major clients of the mask were the women in their 30's-50's and the designs for these clients were very limited. Since the number of younger women and men enjoy the outdoor sports has increased, the face covers for these people should be developed. For this purpose, the direction of new face cover design had 2 points: diversification of design in terms of color, material, shape and giving seasonal differences. 12 designs were designed on the first design stage, but after both wearing test by 16 testees and UV ray blocking test to evaluate these designs, 6 face cover designs were finally selected.

Improvements in Design and Evaluation of Built-In-Test System (무기체계 정비성 향상을 위한 BIT 설계 및 검증 방안)

  • Heo, Wan-Ok;Park, Eun-Shim;Yoon, Jung-Hwan
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.2
    • /
    • pp.111-120
    • /
    • 2012
  • Built-In-Test is a design feature in more and more advanced weapon system. During development test and evaluation(DT&E) it is critical that the BIT system be evaluated. The BIT system is an integral part of the weapon system and subsystem. Built-In-Test assists in conducting on system and subsystem failure detection and isolation to the Line Replaceable Unit(LRU). This capability reduces the need for highly skilled personnel and special test equipment at organizational level, and reduces maintenance down-time of system by shortening Total Corrective Maintenance Time. During DT&E of weapon system the objective of BIT system evaluation is to determine BIT capabilities achieved and to identify deficiencies in the BIT system. As a result corrective actions are implemented while the system is still in development. Through the use of the reiterative BIT evaluation the BIT system design was corrected, improved, or updated, as the BIT system matured.

A Curvic-Coupling Development for the Turbopump Application (터보펌프용 커빅커플링의 개발)

  • Jeong, Eun-Hwan;Yoon, Suk-Hwan;Kim, Jin-Han
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2009.05a
    • /
    • pp.22-25
    • /
    • 2009
  • Development of a curvic-coupling was presented in this paper. The research covers design, structural analysis, hot-temperature-torsion-test, curvic-coupling applied proto-type turbine disk manufacturing, and assembly test of a curvic-coupling rotor system for the turbopump application. Curvic-coupling was designed based on the Gleason-standard-tooth shape. The load capability of the designed curvic coupling was validated by the structural analysis and hot-temperature-torsion-test. A proto-type turbine disk which had adopted designed curvic-coupling was manufactured, assembled and tested to reveal that shaft-disk assembly run-outs in axial and radial directions were much smaller than the design requirements. The development will be finalized after spin test of shaft-disk assembly in near future.

  • PDF