• Title/Summary/Keyword: Database Construction

Search Result 1,438, Processing Time 0.03 seconds

A Development of a Web Based Supporting System for Writing Construction Project Specification (Web기반 공사시방서 작성 시스템 개발 방안)

  • Kim Kyoon-Tai;Kim Tae-Song;Koo Jai-Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.501-506
    • /
    • 2001
  • The Korean government established a domestic specification system, and regulated that owner should produced construction project specifications, instead of special provisions, in design phase, January 1998. But in Korea the ability of construction engineers for construction project specification are insufficient. So the government had built up a database of standard specifications and developed a supporting system for writing construction project specification(SPECMAKE) in 1999. However, it is a PC base stand-alone system, so it is not convenient to update the database. In order to overcome these limitations, the purpose of this paper builds up a database of construction criteria and develops a automatic writing system for construction project specification on web base. The database contains standard specifications, design and construction guidelines related with construction business. And this paper describes the frameworks, the components, and the functions of the specifications writing system for the construction projects.

  • PDF

A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique. (데이터베이스 중심의 BIM기반 개산견적을 위한 모델 개발)

  • Bae, Seong-Jae;Suh, Bong-Gyo;Yun, Seok-Heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.92-93
    • /
    • 2013
  • Recently, a technique based on BIM has been rapidly increased on the construction project. Task such as a calculation of supply easily is proceeded by the technique. Also, an quick and precise preliminary estimate is possible because this technique can be applied. To sum up, this study suggests that the preliminary estimate based on a database of the BIM technique is applicable for the early stage of the construction project.

  • PDF

Construction Materials Management System Based on Web Database (웹 데이터베이스 기반의 건축자재 관리 시스템)

  • Mun, Ji-Youn;Hwang, Suk-Seung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.12 no.1
    • /
    • pp.195-200
    • /
    • 2017
  • Due to the rapid development of Internet technology, qualities of Web services are steadily improving and the Web database systems are actively employed to efficiently manage proper informations in various fields. In this paper, we propose a Web database system for the efficient material management for reusing construction materials. The proposed Web-based management system is operated using the spring framework, after constructing a database based on the collected data including tag ID, Location, Material, State, and Cycle, using the RFID(: Radion Frequency IDentification) system equipped with a location estimation module. Recently, the processing problem for a large amount of the residues generated at the demolition stage of various buildings is magnified in the construction site. The proposed Web-based construction material management system is expected for improving the processing problem as increasing the reusability and for reducing the construction cost as efficiently managing the construction materials for the reuse.

A Study of the Actual Construction Data Management System for Apartment Housing (공동주택의 공사실적자료 관리시스템 분석)

  • Park Hyung-Jae;Kim Tae-Hee;Kim Sun-kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.489-494
    • /
    • 2001
  • Actual construction data of completed projects can be utilized for the economic, time benefit of improving the efficiency on planning, designing, estimating and managing tasks in succeeding projects. But the lack of the system which accumulates and manages the actual data with standardized type, it has not performed well and stayed on early stage. It is required not only specific plan for the utilization of actual data but a construction information management system which collects and processes far-reaching data with standardized from based on facility. Therefore, the purpose of this study is to develop a construction information management system for Apartment housing ,which stored data along project feature database, actual cost database and actual database based on the Web. This effort can make an offer the clearness of dull construction market and the base of construction intelligence

  • PDF

Study on Construction Method of Satellite Radio Interferer Search System (위성전파 혼신원 탐색 시스템 구축 방안 연구)

  • Kang, Chul-Gyu;Park, Chul-Sun;Oh, Chang-Heon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.3
    • /
    • pp.343-348
    • /
    • 2011
  • In this paper, we propose the construction and reconstruction method of satellite radio interferer search system to deal with the keen competition among nations to acquire the limited satellite sources. To construct the satellite interferer search system, whole TLS system construction, part of TLS system construction, and domestic system construction methods are proposed. After that characteristics, advantages, and disadvantages of the system are analyzed when these proposed systems are constructed. In addition, database problems are analyzed in case of the reliability of the operating database, the convergence management between database management systems, and public database service then the solution are proposed.

Study on Database Construction of Demilitarized Zone (비무장지대(DMZ) 훼손지 데이터베이스 구축연구)

  • Sung, Hyun-Chan;Seo, Joung-Young;Lee, Sang-Mi
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.20 no.1
    • /
    • pp.143-150
    • /
    • 2017
  • In this study, we intend to integrate the database(DB) method into one logical structure that is related to damage such as cause and type of damages occurring in the DMZ area. We divided the DMZ members into two types, which are classified into qualitative and quantitative aspects based on the current status survey for three years as a study of database construction, So that the actual data can be utilized in future restoration. The database construction through each restoration direction regarding the type of DMZ corruption is as follows. First, we recognized the necessity of restoration of the damaged area of the DMZ, and approached it as a plan to select the damaged mark. Second, DMZ database reconstruction can be used as a restoration of damages, suggesting more information and restoration type through building an ecological database for education and research. Third, in order to maintain and restore restoration of damaged areas continuously at the national level, it is necessary to institutionalize guidelines for reasonable internal restoration in the national level as data that can be credited externally and can be acknowledged as the latest data.

Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase (시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구)

  • Lee, Joo-Sung;Moon, Sung-Kon;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

Construction of a Database for Road Images and Geometric Transformation (도로영상 데이터베이스 구축 및 기하학적 변환)

  • Lee, Joon-Woong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.19 no.6
    • /
    • pp.534-539
    • /
    • 2013
  • Recently, the number of vehicles equipped with cameras that are generally used to recognize surroundings is increasing. For robust recognition, a huge amount of tests under various environments are performed. Furthermore, the installation position or orientation of the camera is also changed depending on the vehicle. This change also accompanies many tests. Correspondingly, a large cost and a great deal of manpower are required to perform these tests. This paper proposes a method to cut these costs while conducting enough tests through the construction of a database of videos and a geometric transformation of images.

Development of BIM-based Construction Document Information Database Structure through the Link to the BIM Model and Construction Document Information (설계모델과 문서정보의 효율적 연계를 위한 BIM기반 데이터베이스 체계 구축방안)

  • Lee, Donggun;Cha, Heesung;Kim, Kyungrai;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.42-53
    • /
    • 2015
  • Construction industry has the form of industry progressed through mutual cooperation among participants in various fields. Accordingly, it may be referred to as an aggregate of information where various pieces of information are generated and managed according to each construction phase. Most of the information on the construction project is issued in the form of a document. And document management of the site is critical to successful execution of the project. Therefore, in the construction site to use IT technology for efficient information management. But, most of the information on the construction site is managed by the non-structured document. and Information management in the construction site is difficult to lack of information management systems. In this study, proposed construction information database structure and breakdown structure to the information management of the construction site through the BIM technology. Therefore, previous studies were reviewed about the document management and information link management. and Space breakdown structure and information breakdown structure was proposed to structure the information of the construction site and Database for information storage is designed. And, BIM-based construction information database was examined through the application scenario.

Database for Construction Materials Management System Based on RFID (RFID 기반의 건축 자재 관리 시스템을 위한 데이터베이스)

  • Mun, Ji-Youb;Hwang, Suk-Seung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.11 no.8
    • /
    • pp.793-800
    • /
    • 2016
  • The efficient materials management in construction field is a very important work required for designing and demolishing building. As the waste amount caused by the building demolition is increased, the concern related to the treatment method, recyclability, and effect on the environment have been gradually increased. In general, the conventional databases for the construction materials management does not consider the reuse of the construction materials on steps for the building demolition and reconstruction, but they only consider managing the type and input amount of them. In this paper, we propose the database system for efficiently managing the various construction materials informations including the location and condition of each construction materials for the efficient reuse of them on the building demolition and reconstruction. The considered informations are obtained the RFID(: Radio Frequency IDentification) system with on-board the location estimation module. Using the reuse management of construction materials, based on the proposed database, we expect the reduction of the construction cost and time.