• Title/Summary/Keyword: Daily Operation

Search Result 623, Processing Time 0.025 seconds

A Daily Optimal Operation Scheduling of Total Cogeneration System Operating by Combined Heat Power Plant and District Heat Devices (복합화력발전설비와 지역난방설비가 연계된 종합열병합발전시스템의 일간 최적운전계획 수립)

  • Jung, Ji-Hoon;Lee, Jong-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.183-186
    • /
    • 2001
  • This paper describes the optimal operation scheduling of total cogeneration system which is interconnected with combined heat power plant of utility and district heat devices. The numerical modeling about the cogeneration system and the auxiliary thermal energy devices are established and simulation is carried out by LINDO program in order to minimize the operation cost under the national viewpoint. The results reveal that the established numerical modeling and the operation strategy can be effectively applied to the total cogeneration systems to reduce the energy cost.

  • PDF

Proposal for the safety assurance of train operation by applying wayside detection system (지상검지장치를 통한 열차운전의 안전성 확보 방안)

  • Min, Jun-Sung;Lee, Jin-Haeng;Cho, Young-Wan
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.618-622
    • /
    • 2007
  • In the past decades, complain about ground vibration and noise induced by pile driving has been quickly increased. Because of that, auger The role of train has expanded as mass transportation according to the increase of train passenger. The train operation personnel are more emphasis on the safety of train operation due to the increase of train's role. The reason is that the train transports many people daily. So, if there is natural disaster, such as earthquake, flood, high temperature, and so on, it will become disaster. Therefore, this paper introduces and proposes wayside detection system, which can be helpful for the safety assurance of train operation.

  • PDF

A Daily Operation Scheduling of Total Cogeneration System Connected with Auxiliary Devices of Different Posession Right (소유권이 서로 다른 각종 보조설비가 연계된 종합 열병합발전 시스템의 일간운전계획 수립)

  • 이종범;류승헌
    • Journal of Energy Engineering
    • /
    • v.7 no.1
    • /
    • pp.81-88
    • /
    • 1998
  • This paper describes the method decide to optimal sizing and operation scheduling of total cogeneration system which is interconnected with cogeneration unit of utility and auxiliary thermal devices of heating company. Optimal sizing and operation scheduling is established in order to minimize the fuel cost under national viewpoint. Simulations are carried out to show the reliability of method suggested by seasons and kinds. The simulated results can be effectively used as the guideline of operation scheduling between the utility and the heating company.

  • PDF

Effect of Yongdam Dam Operation to Level of Reference Flows Downstream (용담댐 운영이 하류 기준유량 설정에 미치는 영향)

  • Noh, Jae-Kyoung;Yoo, Jae-Min;Oh, Jin-Young
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1772-1776
    • /
    • 2006
  • The Ministry of Environment is determining reference flows and goal water qualities in many stations over all around riverbasin to control TMDL. Reference flow is now defined to 10 years averaged 275th minimum flow$(Q_{275})$. Dam operation takes direct effect on flows downstream. The Yongdam mutipurposed dam was constructed in 2002 and TMDL managing stations between the Daecheong dam and the Yongdam dam are the Geumbon B, C, D, E, and F in main stream of the Geum river. Geumbon F is the Daecheong dam site. Observed flows are ideal to be used to set reference flows, but simulated flows are more practical to be used to set reference flows from the cause of the Yongdam dam's operation. A system for simulating daily storages of the Yongdam dam was constructed and the DAWAST model was selected to simulate daily streamflows. Analysis period was selected for 10 years from 1996 to 2005. Scenario was set as follows; Firstly, observed outflows from the Yongdam dam are used from 2002 to 2005 and the Yongdam dam does not exist from 1995 to 2001. Secondly, the Yongdam dam existed also from 1995 to 2001 and simulated outflows from the Yongdam dam are used from 1996 to 2005 with provision of constant outflow of $7.0m^3/s$ and water supply to the Jeonju region outsided watershed of $900,000m^3/day$. In case of scenario 1 reference flows at the Geumbon B, C, D, E, F are 4.52, 6.69, 7.96, 11.17, and $13.21m^3/s$, respectively. And in case of scenario 2 reference flows at the Geumbon B, C, D, E, F are 6.27, 8.48, 9.58, 12.73, and $15.12m^3/s$, respectively.

  • PDF

A Study of Optimum Operational Methods for Domestic Wastewater Treatment Plants in Korea (국내 하수종말처리장 최적 운전 방안에 관한 연구)

  • Lee, Byong-hi;Lee, Woung-Woon
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.14 no.1
    • /
    • pp.45-53
    • /
    • 2000
  • The optimum operation of domestic wastewater treatment plant can give influence on operational cost and future expansion in Korea where has 93 operational domestic wastewater treatment plants. Also, the study on optimum operation can reduce operation cost and budget of municipalities whom have responsibility of wastewater treatment plant operation. In this study, 9 domestic wastewater treatment plants which can represent 93 plants in Korea have been selected and operational data are gathered. The collected data are inputted to computer simulator based on IAWQ's Activated Sludge Model No.1 and optimum operation methods are developed. Also, the electric power for aeration which has large portion of overall operation cost are calculated based on design and operation conditions and these are compared. In this study, it was found that design wastewater characteristics are 1.6 times higher than those of daily maximum except for E plant and that estimation methods for design wastewater characteristics have to be improved. Based on computer simulation, we found there is no need to operate all aeration tanks due to weak influent overall power for aeration can be reduced to about 43% of design one.

  • PDF

Operation Rule Curve for Reservoir with Low Areal Ratio of Watershed to Downstream Paddy Field (유역배율이 작은 저수지의 이수관리방법)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.18 no.1
    • /
    • pp.68-80
    • /
    • 2011
  • To provide a operation rule curve for reservoir with low ratio of watershed area to paddy field area, Duckyong reservoir with watershed area of $15.8km^2$ and paddy field area of 1,071ha was selected, in which 4 meters are being heightened and full water levels will be increased from EL.26.0m to EL.30.0m, total water storages from 365.6M $m^3$ to 708.0M $m^3$. There was no operation rule curve that satisfied over 90% reliability of water supply in reservoir with watershed area of 1.48 times of paddy field area. The differences between observed and simulated reservoir daily water storages were minimized to determine parameters for simulating reservoir inflow in case of paddy field area of 550ha from 1991 to 2010. A operation rule curve was drawn to have a maximum storage with total water storage, which was in paddy field area of 700ha with ratio of 2.3 between watershed area and paddy field area. This case showed that annual irrigation water supply was 668M $m^3$ and instream flow of 57M $m^3$, water supply reliability of 55.6% in normal operation, and annual irrigation water supply was 605M $m^3$ and instream flow of 38M $m^3$, water supply reliability of 95.6% in withdrawal limited operation. Water supply reliabilities showed 35.6% without flood regulation and 17.8% with flood regulation in existing reservoir before heightening.

  • PDF

An Efficient Methodology for Daily Waste Treatment Using Reverse Logistics Network: Focused on D Metropolitan City (역물류네트워크를 이용한 생활폐기물 처리 효율화 방안 - D광역시를 중심으로)

  • Yun, YoungSu;Chen, Xing
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.20 no.2
    • /
    • pp.97-111
    • /
    • 2015
  • In this paper, a methodology for effectively treating daily waste at D metropolitan city is considered using reverse logistics(RL) network. Currently, eight district offices at D metropolitan city are treating their daily wastes using each RL network. However, unfortunately, current method has a weakness such as inefficiency of RL network operation. Therefore, we propose a revised method for improving the inefficiency. In case study, we compare the performances of the current and revised methods using various real-life data. The analysis result shows that the revised method outperforms the current method.

Operating performance of desalination system with solar energy (태양에너지 해수담수화 시스템 운전 성능)

  • Kwak, Hee-Youl;Yoon, Eung-Sang;Joo, Moon-Chang;Joo, Hong-Jin
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.04a
    • /
    • pp.250-255
    • /
    • 2009
  • This study was analyzed the long term performance of the demonstration system for solar energy desalination in Jeju. we used a solar thermal system as heat source of the single-stage fresh water generator with plate-type heat exchangers and a photovoltaic power system as electric source for hydraulic pumps. The demonstration system was designed and installed at Jeju-island in 2006. The system was comprised of the desalination unit with daily fresh water capacity designed as $2m^3$ a $120m^2$ evacuated tubular solar collector to supply the heat, a $6m^3$ heat storage tank, and a 5kW photovoltaic power generation to supply the electricity of hydraulic pumps for the heat medium fluids. Through the operation during about 3 years, In a clear day more than $400W/m^2$, the daily fresh water showed to produce more than about 500liter, and from January, 2007 to March, 2009 for 3 years, solar irradiance daily averaged was measured $370W/m^2$, the daily fresh water yield showed that can be produced about 330liter.

  • PDF

Locally-Weighted Polynomial Neural Network for Daily Short-Term Peak Load Forecasting

  • Yu, Jungwon;Kim, Sungshin
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.16 no.3
    • /
    • pp.163-172
    • /
    • 2016
  • Electric load forecasting is essential for effective power system planning and operation. Complex and nonlinear relationships exist between the electric loads and their exogenous factors. In addition, time-series load data has non-stationary characteristics, such as trend, seasonality and anomalous day effects, making it difficult to predict the future loads. This paper proposes a locally-weighted polynomial neural network (LWPNN), which is a combination of a polynomial neural network (PNN) and locally-weighted regression (LWR) for daily shortterm peak load forecasting. Model over-fitting problems can be prevented effectively because PNN has an automatic structure identification mechanism for nonlinear system modeling. LWR applied to optimize the regression coefficients of LWPNN only uses the locally-weighted learning data points located in the neighborhood of the current query point instead of using all data points. LWPNN is very effective and suitable for predicting an electric load series with nonlinear and non-stationary characteristics. To confirm the effectiveness, the proposed LWPNN, standard PNN, support vector regression and artificial neural network are applied to a real world daily peak load dataset in Korea. The proposed LWPNN shows significantly good prediction accuracy compared to the other methods.

Behaviour Analysis of Irrigation Reservoir Using Open Water Management Program (개방형 물관리 프로그램을 이용한 관개용 저수지의 거동 분석)

  • Kim, Sun-Joo;Kim, Phil-Shik;Lim, Chang-Young
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.1
    • /
    • pp.3-13
    • /
    • 2004
  • For optimal irrigation reservoir operation during flood and normal period, a general and systematic policy is suggested to make balance of the conflicting purposes between water conservation and flood control. We developed Open Water Management Program (OWMP) with an open architecture to deal with newly arising upgrade problems for optimal management of irrigation reservoir. And we evaluated the applicability of OWMP to estimate daily runoff from an agricultural watershed including irrigation reservoirs, and analyzed behaviour of irrigation reservoirs as irrigation water requirements considering frequency analysis of reservoir storage and frequency analysis water requirements for effective management of reservoir. When we executed OWMP with data produced from an experimental field, IHP basins, the mean relative errors of application of daily runoff and irrigation water requirement were less than 5%. We also applied OWMP to a Seongju irrigation reservoir to simulate daily runoff, storage and water requirement from 1998 to 2002, and the mean model efficiency between measured and simulated value was 0.76. Our results based on the magnitude of relative errors and model efficiency of the model simulation indicate that the OWMP can be a tool nicely adapted to the effective water management of irrigation reservoir for beneficial water use and flood disaster management.