• 제목/요약/키워드: DOCK Management

검색결과 46건 처리시간 0.024초

선박건조공정의 미세 통합 일정 관리 체계 구축에 관한 연구 (A Study on the Construction of Detail Integrated Scheduling System of Ship Building Process)

  • 김용섭;이대형
    • 대한조선학회논문집
    • /
    • 제44권1호
    • /
    • pp.48-54
    • /
    • 2007
  • Higher productivity and less cost during the manufacturing process of ships are required to maintain international competitiveness of modern shipbuilding industries. The integrated hull/ outfitting/ painting scheduling(IHOP) process is a final point, where logistics are finally being integrated and upcoming schedules are made. Therefore, more profits are expected from IHOP by effective management. In this thesis, IHOP is proposed in order to solve how to choose block erection date with IHOP scheduling logic. The result of IHOP scheduling is highly advised to utilize fabrication, outfitting shops. A standardized operation and load of resource will eventually be applied in long-term time span point of view for this will make it easy to enable capacity planning and workforce planning. It is also expected to eliminate inefficiency in overtime work and efficiently utilize manpower in short-term.

수직형 자동화 컨테이너 터미널 운영 효율성 제고를 위한 인터체인지 이송 모델 도입 방안 연구 (A Study on Operational Efficiency Improvement of Perpendicular Layout Container Terminal via introducing Interchange Transport Model)

  • 장재환;이정윤
    • 한국항해항만학회지
    • /
    • 제44권3호
    • /
    • pp.181-186
    • /
    • 2020
  • 지금까지 컨테이너 자동화 터미널의 설계 및 운영 모델 개발은 주로 수출입 화물의 양적·하 기능에 특화된 서구 항만을 대상으로 수행되었기 때문에, 부산항처럼 다양한 On-Dock 서비스가 요구되는 컨테이너 항만에서는 자동화 터미널의 도입과 운영에 많은 제약이 따른다. 이에 본 연구의 목적은 부산항을 사례로 현재 컨테이너 물동량 구조와 터미널 내부 운영 특성을 진단하고, 기존 자동화 터미널 운영 모델의 부분적인 변경을 통해 효과적인 공컨테이너 관리와 함께 터미널 운영비용을 절감하는 방안을 제시하는 것이다. 기존 수직 배열 자동화 컨테이너 터미널에 '인터체인지 이송 모델'을 적용하여 시뮬레이션 한 결과, 수정된 운영 모델은 구내 이송장비를 추가로 투입해야 하는 불리함에도 불구하고 기존 운영 모델 대비 최대 22%의 TAT 단축과 함께 연간 터미널 매출의 9.4%에 달하는 운영비용 절감이 가능한 것으로 나타났다.

조선소의 메가블록 조립작업장을 위한 공간계획알고리즘 개발 (Spatial Scheduling for Mega-block Assembly Yard in Shipbuilding Company)

  • 고시근;장정희;최대원;우상복
    • 산업공학
    • /
    • 제24권1호
    • /
    • pp.78-86
    • /
    • 2011
  • To mitigate space restriction and to raise productivity, some shipbuilding companies use floating-docks on the sea instead of dry-docks on the land. In that case, a floating-crane that can lift very heavy objects (up to 3,600 tons) is used to handle the blocks which are the basic units in shipbuilding processes, and so, very large blocks (these are called the mega-blocks) can be used to build a ship. But, because these mega-blocks can be made only in the area near the floating-dock and beside the sea, the space is very important resource for the process. Therefore, our problem is to make an efficient spatial schedule for the mega-block assembly yard. First of all, we formulate this situation into a mathematical model and find optimal solution for a small problem using a commercial optimization software. But, the software could not give optimal solutions for practical sized problems in a reasonable time, and so we propose a GA-based heuristic algorithm. Through a numerical experiment, finally, we show that the spatial scheduling algorithm can provide a very good performance.

크로스도킹 시스템을 위한 물류센터의 설계에 관한 연구 (Design of Distribution Facility for Cross Docking Systems)

  • 유우연;박윤선;신정현
    • 대한안전경영과학회지
    • /
    • 제10권2호
    • /
    • pp.187-193
    • /
    • 2008
  • Cross docking is a warehouse management concept in which items delivered to a distribution facility by inbound trucks are immediately sorted out and reorganized based on customer demands and are routed and loaded into outbound trucks for delivery to customers without actually being held in inventory in the distribution facility. In this research, the design of distribution facility for cross docking systems was studied. The objective of this research is to find the minimum number of receiving docks and shipping docks, respectively, in order to meet the daily demand of the distribution center. Two solution approaches are employed in modeling and solving the problem The first approach is mathematical modeling and the second approach is a simulation. The logic developed in the simulation model is expected to apply to the real world situation.

물류센터의 에너지 효율 개선 방안에 관한 연구 (A Study on the Improvement of Energy Efficiency in Warehouses)

  • 선종근;류호상
    • 조명전기설비학회논문지
    • /
    • 제26권6호
    • /
    • pp.66-72
    • /
    • 2012
  • The main sources of energy consumption in warehouses are MHE(Material Handling Equipment), HVAC(Heating, Ventilating and Air Conditioning) and Lighting. Warehouses in advanced countries raise energy efficiencies with energy consumption diagnosis, technology development and systematic management and improvements for MHE, HVAC and Illuminating, etc. They have managed illuminating system, air conditioning, motor driven system, air circulation method, dock facility, layout, AS/RS, conveyor system and battery management, etc. Ansong Pyeongtaek area investigation resulted that 43.9[%] of enterprises are managing partly energy consumption source. But the data resulted with not substantial management of energy consumption but passive management for only electric bill curtailment. Therefore through survey research & visiting interviews of some companies in Ansong Pyeongtaek area, we understood the status of energy consumption source management and proposed energy efficiency methods on the basis of that results.

조선 성과 측정을 위한 다차원 생산성의 분석 (An Analysis of Multidimensional Productivity for the Shipbuilding Performance)

  • 김연민
    • 경영과학
    • /
    • 제34권2호
    • /
    • pp.57-66
    • /
    • 2017
  • The purpose of this study is to analyze the multidimensional productivity of the shipbuilding performance and to explain the role of different factors, such as man-hour, dock period, number of building block, launching process rate, automatic welding percent, and drawing fault rate which are important production-related variables in most shipbuilding companies. The shipbuilding productivity is obtained using Data Envelopment Analysis (DEA) approach. Then, a Tobit model is considered to measure the influence of different factors on the measured productivity. The results reveal that this productivity measure can substitute a representative shipbuilding productivity index (CGT/man-hour) in shipbuilding industries. Also, this multidimensional productivity analysis using DEA and Tobit reveals complex relationships between production-related variables and CGT and sale.

인천내항을 위한 시뮬레이션 모델 개발 (A Study on the Development of Simulation Model for Inchon Port)

  • 김동희;김봉선;이창호
    • 대한안전경영과학회지
    • /
    • 제2권2호
    • /
    • pp.127-137
    • /
    • 2000
  • Inchon Port is the second largest import-export port of Korea, and has the point at issue such as the excessive logistics cost because of the limits of handling capacity and the chronic demurrage. The purpose of this paper is to develop the simulation program as a long-term strategic support tool, considering the dual dock system and the TOC(Terminal Operation Company) system executed since March, 1997 in Inchon Port. The basic input parameters such as arrival intervals, cargo tons, service rates are analyzed and the probability density functions for these parameters are estimated. From the simulation model, it is possible to estimate the demurrage status through analyzing various scenarios and to establish the long-term port strategic plan.

  • PDF

그리드 상호 운용을 위한 Ganga 플러그인 설계 및 구현 (Design and Implementation of Ganga Plugins for Grid Interoperability)

  • 김한기;황순욱;이윤기;김은성;염헌영
    • 한국정보과학회논문지:컴퓨팅의 실제 및 레터
    • /
    • 제15권12호
    • /
    • pp.881-890
    • /
    • 2009
  • 고에너지 물리나 생명공학 분야의 거대 문제를 풀기 위해서는 다수의 계산 자원이 요구되는데 이는 하나의 그리드 환경을 통해서는 확보되기가 어려울 수 있다. 각 그리드 환경에서 각각의 사용자 인터페이스를 통해서 작업을 제출할 수 있지만, 수 백 개 이상의 작업들로 이루어지는 거대 문제를 각기 다른 그리드 환경에서 따로 관리하기에는 많은 비용과 노력이 요구될 수 있다. 본 논문에서는 이와 같은 문제점을 그리드 사용자 인터페이스 시스템인 Ganga의 Gridway 백엔드와 InterGrid 백엔드를 개발하여 이 기종의 그리드 환경에서 동일한 사용자 인터페이스를 제공하여 해결하고자 한다. 우리는 Globus 기반의 그리드 자원을 백엔드로 사용할 수 있도록 Ganga의 Gridway 백엔드 모듈을 개발하였다. 또한 gLite 기반의 그리드 자원과 Globus 기반의 그리드 자원을 함께 사용할 수 있도록 지원하기 위해서 InterGrid 백엔드 모듈도 개발하였다. 이와 함께, 개발된 백엔드 모듈들의 실용성을 보여주기 위해서 WISDOM 프로젝트에서 사용되고 있는 AutoDock 프로그램을 지원하는 Autodock application 플러그인을 개발하여, Globus 기반의 PRGMA 자원과 gLite 기반의 EGEE 자원을 동시에 활용하는 연동실험을 수행하였다.

선체 블록 진수 시 필요한 최소 용접 구조 강도 평가에 관한 연구 (A Study on the Determination of Minimum Welding Condition Based on Structural Strength under Launching for Tandem Blocks)

  • 이명수;박주신
    • 해양환경안전학회지
    • /
    • 제28권7호
    • /
    • pp.1267-1273
    • /
    • 2022
  • 최근 한국 조선업계가 세계 선박 발주 물량의 대부분을 수주하고 있지만, 생산 현장에서는 인력난으로 생산공정 차질을 겪고 있다. 오랜 조선업 불황으로 일감과 임금 모두 줄어든 탓에 근로자들이 조선소를 떠났기 때문이다. 수주가 증가한 주요 요인은 카타르 LNG선 대량 발주였으며, 선박에 요구되는 기술 사양이 복잡해지는 상황도 유리하게 작용하고 있다. 선박은 계약한 인도 시점이 무엇보다도 중요하기 때문에, 조선소의 주요 공정 중 도크 진수 계획이 무엇보다도 중요한 관리 아이템이다. 도크에서 건조되는 구조물은 의장 작업을 남긴 선체 혹은 완성형 선박일 수 있으며, 때에 따라서 선체의 일부 블록 수준일 경우도 많다. 진수 시, 선체는 유체력에 의한 호깅(hogging) 혹은 새깅(sagging) 모멘트 영향을 받게 되고, 블록 연결부의 구조강도에 대한 안전성 확보가 무엇보다도 중요하다. 정상적인 공정이라면 연결 부재는 용접을 끝낸 상태에서 진수하지만, 실제 조선사에서는 도크 일정을 준수하기 위하여 구조 안전성이 확보되는 조건에 대한 빠른 의사결정이 필요하다. 본 연구에서는 앞서 언급한 문제점들을 엔지니어링 관점에서 합리적으로 판단하기 위하여 휨 응력평가법과 유한요소해석 모델링을 사용한 상세 해석법과 적용성을 분석하였다. 논문에서 언급된 주요 내용은 향후 유사 구조 강도 평가의 진행 시 좋은 사례로 활용될 수 있을 것으로 생각한다.