• 제목/요약/키워드: Costs Factor

검색결과 636건 처리시간 0.024초

발전비용의 부하역률 감도와 종합비용을 활용한 효과적인 역률개선 방안 연구 (A Study on the Effective Enhancement of the Load Power Factor Using the Load Power Factor Sensitivity of Generation Cost and Integrated Costs)

  • 이병하;오민혁;김정훈;심건보
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.284-286
    • /
    • 2003
  • The low load power factor causes various problems such as the Increase of the power loss and the voltage instability. The demand of reactive power increases continuously with the growth of active power and the restructuring of electric power companies makes the integrated management of ractive power troublesome, from which the systematic control of load power factor is required. In this paper, the load power factor sensitivity of the generation cost and integrated costs are used for determining the locations and capacities of reactive power compensation devices effectively and for enhancing the load power factor appropriately. It is shown through the application to a small-scale power system that the system power factor can be enhanced effectively and appropriately using the load power factor sensitivity and integrated costs.

  • PDF

건설재해손실 영향요인 및 우선순위 분석 - 비보험비용 항목을 중심으로 - (An Analysis of Influential Factors and their Prioritization in Association with the Loss from Construction Disasters with a Focus on Uninsured Categories)

  • 양용구;김병석
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.23-34
    • /
    • 2014
  • With a view to analyzing the influential factors and their prioritization in association with the loss from construction disasters, this study has presented relative weighted value and importance for each category of loss by making a systematic classification of costs for non-insured categories (indirect costs) and conducting AHP analysis based on results of a survey of specialists. Through the study, first, I have divided the larger classification of loss factors into human loss factor, financial loss factor, special cost factor, and managerial loss factor, and, second, have presented prioritization of loss categories by allotting scores based on weighted values after calculating weighted value through pairwise comparison of loss levels. Based on these results of the study, we should be able to qualitatively calculate the loss costs that construction disasters inflict on business, promote rational decision-making and efficiency in spending related to a disaster, and compare it against safety investment designed to reduce disaster loss from the perspective of business strategy.

추가안전대책비용, 사고위험대응비용의 외부비용을 반영한 원전비용 추정 연구 (Analysis for External Cost of Nuclear Power Focusing on Additional Safety and Accident Risk Costs)

  • 김윤경;조성진
    • 자원ㆍ환경경제연구
    • /
    • 제22권2호
    • /
    • pp.367-391
    • /
    • 2013
  • 후쿠시마원자력발전소의 사고를 계기로 원전의 안전대책비용, 사고위험대응비용과 같은 외부비용들의 존재가 부각되고 있다. 이에 본 연구는 원전의 외부비용들 중에서 추가안전대책비용과 사고위험대응비용을 추정하고, 이를 발전원가 및 전기요금에 반영하여 변화정도를 살폈다. 원전의 추가안전대책비용은 70~90%의 이용률에서 0.53원/kWh~0.80원/kWh으로 원전의 발전원가에 큰 영향을 미치지는 않는다. 사고위험대응비용은 원전사고피해규모별, 사고발생빈도별, 이용률별로 0.0025원/kWh~26.4188원/kWh로 추정되었다. 사고위험대응비용을 포함시키면 원전발전원가는 47.58원/kWh~85.92원/kWh가 된다. 2011년을 기준으로 사고위험대응비용을 내부화한 경우의 전기요금의 증가율은 70~90%의 이용률에서 0.001%~10.0563% 로 추정되었다. 본 연구는 원전의 외부비용을 내부화하는 방법으로서 외부비용을 발전원가에 포함하여 전기요금에 반영하였다. 본 연구는 지금까지 우리나라에 논의되지 않았던 원전 외부비용을 내부화하는 방법의 하나가 될 것이다.

부하역률 감도기법 적용에 의한 전력시스템의 경제운용 측면에서의 역률개선 방안 연구 (A Study on Enhancing the Load Power Factor from the Point of View of Economic Operation Using the Load Power Factor Sensitivity Method)

  • 이병하;김정훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.153-155
    • /
    • 2004
  • Various problems such as the increase of the power loss and the voltage instability may often occur in the case of low load power factor. The demand of reactive power increases continuously with the growth of active power and the restructuring of electric power companies makes the integrated management of ractive power a troublesome problem, so that the systematic control of load power factor is required. In this paper, the load power factor sensitivity of the generation cost is used for determining the locations of reactive power compensation devices effectively and for enhancing the load power factor appropriately. In addition, the integrated costs are used for determining the value of the load power factor from the point of view of the economic operation. It is shown through the application to a large-scale power system that the system power factor can be enhanced effectively and appropriately using the load power factor sensitivity and integrated costs.

  • PDF

의류쇼핑 웹사이트 전환비용과 사이트 유지의 구조모델 (A Structural Modeling for Switching Costs and Site Retention in Apparel Shopping Website)

  • 김은영
    • 한국생활과학회지
    • /
    • 제21권6호
    • /
    • pp.1173-1184
    • /
    • 2012
  • This study estimates a structural model to examine the causal relationships among web browsing, switching cost, and site retention in the context of apparel shopping website. A total of 499 usable questionnaires were obtained from consumers aged from 20 to 49 years. For data analysis, exploratory factor analysis, confirmatory factor analysis and structural model were used. The result showed that consumer's perceived switching costs consisted of three factors: relationship cost, search cost and benefit loss cost. In estimated structural model, the relationship cost was influenced by leisure browsing; the search cost was influenced by informational browsing and leisure browsing; the benefit loss cost was influenced by leisure browsing. Especially, the leisure browsing was the most highly related to the benefit loss cost, and followed by relationship cost and search cost. However, hedonic browsing was not significantly related the factors of switching costs. The search costs significantly affected customer's intentions for site retention. A managerial implication was discussed for e-retailers in order to develop strategic switching costs in building long-term relationships with web browsers on the apparel shopping websites.

보수율을 고려한 조명시스템의 경제성 평가 (The Economics Evaluation of Lighting System Considering Maintenance Factor)

  • 심상만;김기훈;황남극;김훈
    • 조명전기설비학회논문지
    • /
    • 제15권5호
    • /
    • pp.1-7
    • /
    • 2001
  • 조명시스템의 경제성에 크게 영향을 주는 요소들을 보면 초기 설비비, 보수비, 전기요금 등이 있다. 이 중에서 보수비는 램프 교환비, 램프교환 인건비, 청소비로 구성되어 있으므로 부소계획에 따라서 조명시스템의 경제성이 다르게 나타난다. 따라서 설계초기에 어떠한 조명시스템이 경제적으로 유리한가를 예측하는 것은 중요하다. 그러므로 본 연구에서는 평균조도를 계산하는데 사용되는 ZCM에서의 보수율 구성 요소들을 변화시켜 보수율을 산정한 다음 조명시스템의 경제성을 평가하여 보수율의 중요성을 보였다.

  • PDF

대체에너지기술의 환경비용 고찰

  • 김부호
    • 태양에너지
    • /
    • 제13권2_3호
    • /
    • pp.151-156
    • /
    • 1993
  • The comparison of solar energy technologies with conventional technologies involves more than just comparing the costs of supplying energy and provding capacity. Solar technologies supply energy in a sustainable manner while having minimal effects on the environment. When choosing between solar energy technologies and conventional technologies, first cost is a important factor. The environmental and other social benifits of using solar energy technologies contrasts sharply with the environmental degradation and social costs resulting from the use of conventional technologies. These hidden costs, sometimes called "social cost", are not included in conventional economics. This paper is emphasized that the consideration of social costs effects comparisons between renewable and conventional energy technologies is of importance.

  • PDF

부하역률 감도기법 적용에 의한 효율적인 부하역률 개선에 관한 연구 (A Study on the Effective Enhancement of the Load Power Factor Using the Load Power Factor Sensitivity of Generation Cost)

  • 이병하;김정훈
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권1호
    • /
    • pp.18-24
    • /
    • 2005
  • Various problems such as the increase of the power loss and the voltage instability may often occur in the case of low load power factor. The demand of reactive power increases continuously with the growth of active power and the restructuring of electric power companies makes the comprehensive management of reactive power a troublesome problem, so that the systematic control of load power factor is required. In this paper, the load power factor sensitivity of the generation cost is derived and it is used for determining the locations of reactive power compensation devices effectively and for enhancing the load power factor appropriately. In addition, the voltage variation penalty cost is introduced and the integrated costs including the voltage variation penalty cost are used for determining the value of the load power factor from the point of view of the economic investment and voltage regulation. It is shown through the application to a large-scale power system that the load power factor can be enhanced effectively and appropriately using the load power factor sensitivity and integrated costs.

비용구조분석에 의한 건축단계별 공사비용 절감방법 (The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure)

  • 박근준
    • 한국건축시공학회지
    • /
    • 제5권1호
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

고장정지율과 경제적 투입순서를 고려한 민자발전소의 회피발전비용 계산 (Avoided Generation Costs of IPPS Considering Forced Outage Rate and Economic Loading Order)

  • 원종률;박종배;김진호
    • 에너지공학
    • /
    • 제11권1호
    • /
    • pp.47-58
    • /
    • 2002
  • 본 논문은 민자발전소의 회피 발전비용을 계산하는 새로운 방법을 제안하였다. 제안된 방법은 기존의 부하감소법과 달리 민자발전소의 고장정지율과 경제적 투입순서를 정확히 고려할 수가 있다. 그러므로 더욱 정확한 회피 발전비용을 계산할 수가 있다. 또한 확률적 시뮬레이션을 수행하여 계산하므로 민자발전소의 비용에 대한 영향도 정확히 고려할 수가 있다. 부가적으로 한 개 이상의 민자발전소가 참여하였을 때에 회피 발전비용을 할당하는 방법도 제안하였다. 다양한 사례연구를 통해 제안한 방법의 결과를 분석하였다.