• 제목/요약/키워드: Cost control

Search Result 5,868, Processing Time 0.036 seconds

Development of Cost Management Process during Design Phase based on Design to Cost (DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발)

  • Park, So-Hyun;Moon, Hyun-Seok;Hyun, Chang-Teak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

Iterative learning control of nonlinear systems with consideration on input magnitude (입력의 크기를 고려한 비선형 시스템의 반복학습 제어)

  • Choi, Chong-Ho;Jang, Tae-Jeong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.2 no.3
    • /
    • pp.165-173
    • /
    • 1996
  • It is not desirable to have too large control input in control systems, because there are usually a limitation for the input magnitude and cost for the input energy. Previous papers in the iterative learning control did not considered on these points. In this paper, an iterative learning control method is proposed for a class of nonlinear systems with consideration on input magnitude by adopting a concept of cost function consisting of the output error and the input magnitude in quadratic form. We proposed a new input update law with an input penalty function. If we choose a reasonable input penalty function, the two control objectives, good command following and small input energy, can be achieved. The characteristics of the proposed method are shown in the simulation examples.

  • PDF

Development of a UAV Flight Control System Using a Low Cost GPS/IMU (저가형 GPS/IMU를 이용한 UAV 비행 제어 시스템 개발)

  • Koo, Won-Mo;Chun, Se-Bum;Won, Dae-Hee;Kang, Tae-Sam;Lee, Young-Jae;Sung, Sang-Kyung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.14 no.5
    • /
    • pp.502-510
    • /
    • 2008
  • UAVs(Unmanned Aerial Vehicles) have many applications in military and commercial areas. The flight control system of UAVs is more important than manned aircraft's because the mission of UAVs must be operated without a human pilot. But very heavy and expensive navigation system makes it difficult to develop UAV flight control system. In this research, GPS/IMU integrated navigation filter was developed for light weight/low cost flight control system of small UAVs. With this navigation filter, full flight control system which has real time operating capability has been developed. The performance of the flight control system is basically checked by HILSIM (Hardware In the Loop SIMulation). Finally, the flight control system is verified by showing performance test result under real flight environment.

A determination of economic control limits considering process deterioration (공정의 열화를 고려한 경제적 관리한계 결정)

  • 심윤보;김성집
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.45
    • /
    • pp.237-246
    • /
    • 1998
  • In most statistical process control(SPC), control charts are used in which samples are taken and a suitable statistic is determined and plotted. In these control charts, control limits, ${\mu}{\pm}textsc{k{\sigma}}$, from which a decision is made are mostly ${\mu}{\pm}3{\sigma}$ and current literature in control charts are mainly concerned with detecting a shift in the mean. Therefore, when $\sigma$ is increased considerably after a long time, using control limits set at the first time causes a great deal of economic loss. In this paper the solutions to determine new control limits which maximizes the profit per unit produced and reduce $\sigma$ to economically optimal level for a certain cost when $\sigma$ is increased due to process deterioration are proposed. By applying new control limits, $\alpha$ error decreases considerably compared to apply initial control limits when $\sigma$ is increased due to process deterioration. Therefore, false alarm investigation cost drops down to the level of initial a error. And also this solution provides useful information regarding replacement of a process when the process is reviewed regularly.

  • PDF

A Conceptual Investment Cost Estimation Using by Cost Indices for the Train Control Facility of High-speed Rail Project (원가지수를 이용한 고속철도 설비의 개략적 투자비 추정기법)

  • Lee, Young-Joo;Lee, Yong-Eok;Jang, Seong-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.2
    • /
    • pp.194-202
    • /
    • 2011
  • Most of Orders of Magnitude estimate are based on historical data. This data is converted to the current price using by the cost index method mainly. This method, however, is rarely utilized or only for one-time use due to the lack of data and the complex escalation calculation method. This paper present a typical process on the conceptual investment cost estimation using by Cost Indexes based on the actual case for the Train Control facility of High-speed rail project. The result is expected to serve as both an easy way for Order of Magnitude estimate and a standard guideline for computerized modeling.

Application of cost-sensitive LSTM in water level prediction for nuclear reactor pressurizer

  • Zhang, Jin;Wang, Xiaolong;Zhao, Cheng;Bai, Wei;Shen, Jun;Li, Yang;Pan, Zhisong;Duan, Yexin
    • Nuclear Engineering and Technology
    • /
    • v.52 no.7
    • /
    • pp.1429-1435
    • /
    • 2020
  • Applying an accurate parametric prediction model to identify abnormal or false pressurizer water levels (PWLs) is critical to the safe operation of marine pressurized water reactors (PWRs). Recently, deep-learning-based models have proved to be a powerful feature extractor to perform high-accuracy prediction. However, the effectiveness of models still suffers from two issues in PWL prediction: the correlations shifting over time between PWL and other feature parameters, and the example imbalance between fluctuation examples (minority) and stable examples (majority). To address these problems, we propose a cost-sensitive mechanism to facilitate the model to learn the feature representation of later examples and fluctuation examples. By weighting the standard mean square error loss with a cost-sensitive factor, we develop a Cost-Sensitive Long Short-Term Memory (CSLSTM) model to predict the PWL of PWRs. The overall performance of the CSLSTM is assessed by a variety of evaluation metrics with the experimental data collected from a marine PWR simulator. The comparisons with the Long Short-Term Memory (LSTM) model and the Support Vector Regression (SVR) model demonstrate the effectiveness of the CSLSTM.

Analysis of Operational Issues for ICT-based On-Board Train Control System (ICT 기반 차상제어시스템 개발에 따른 운영 이슈 분석)

  • Kim, Young-Hoon;Choi, Won-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.6
    • /
    • pp.575-583
    • /
    • 2011
  • In order to minimize the maintenance cost at local lines, Information & Communication Technology based onboard train control system is being developed. Unlike the central traffic control based fixed block system, this system use a moving block method and railway driver direct control switch and railway crossing. The purpose of this paper is to analyze the concerned main operational issues are as follows: the preparation of train operation, drivability, the role of driver and controller, block system and cost. We defined the role of driver and driver's input data for train service, and we designed the business process of driver using UML tool. We considered the aspect of drivability, DMI is needed to support the braking moment for the driver and driver training simulator. We designed the driver business process for control of switch and railway crossing. We analyzed the fixed block system and moving block system to confirm the difference with the existing operational method. The cost analysis structure is also needed for the operation cost comparison.

A Quality Control Model for Shared University in Service Era (서비스시대 공유대학 품질관리모델 연구)

  • Kim, Hyunsoo
    • Journal of Service Research and Studies
    • /
    • v.8 no.4
    • /
    • pp.1-12
    • /
    • 2018
  • This study suggests a way to implement shared economic model of educational service in service era. As most shared economic models are innovating high-cost, low-quality structures in existing economies, there is a need for innovation models that improve high-cost low-quality structures to high-quality, low-cost structures in education services. Especially, since higher education and lifelong education are in urgent need of innovation, this study studied shared university model focused on higher education and lifelong education. In order to provide educational services at low cost and high quality, it is necessary to use idle resources, so it is necessary to introduce a shared economic model. Shared universities require a more efficient and effective supplier quality control, as the existing limited supplier group become widespread. Normative quality control is also needed to cultivate students as competent talent. In addition, in order to provide high-quality higher education services at a low cost, it is necessary to base the process quality management using advanced science and technology. Therefore, educational service quality management is a process of quality control that is well-balanced in terms of suppliers, customers, and processes.