• Title/Summary/Keyword: Cost Change

Search Result 2,419, Processing Time 0.03 seconds

Measurement of Gas Solubility and Mechanical Property for Bumper Polymer (범퍼용 수지의 gas용해도 및 물성 측정)

  • 이정주;차성운;이경수
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1366-1369
    • /
    • 2003
  • Today, the industries use polymer material for many purpose. Specially, it is important in automobile industry because tile costs of polymer hold high proportion of the overall cost. If we reduce the weight of automobile, fuel efficiency of car is raised and cost of bumper is lower. Therefore there are many efforts to reduce of car currently. The purpose of this paper is to reduce polymer used in car bumper.

  • PDF

The Performance Evaluation and The Layout Improvement of the Engine Manufacturing Line Using Simulation (시뮬레이션을 사용한 엔진생산라인의 성능평가 및 설계개선)

  • 오필범
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.224-228
    • /
    • 1999
  • When we construct a manufacturing plant, optimal design is very important. This paper is to simulate an engine manufacturing flow line for commercial vehicle. The parameters we consider in simulation include facility downtime, tool change time, buffer size between consecutive stations, and time to repair the facility. We use AutoMod to compare the alternatives. The objective is to minimize the total cost. Simulation results provide significant cost saving by improving the current design and policy.

  • PDF

A Study on the Methods for make sure of the Product Reliability (제품의 제조신뢰성 확보 방법론 연구)

  • Lee Jong-Beom;Cho Jai-Rip
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.147-155
    • /
    • 2005
  • When a failure or fault is detected, the product is adjusted or design change and is returned to its original condition before the failure or fault. Continuous improvement of the FMEA system is to determine an optimum product reliability that minimizes the total cost per unit time associated with inspection, repair, and the nondetection cost.

  • PDF

Climate Change Policy Analysis Considering Bottom-up Electricity Generation System (발전부문 하이브리드 모형을 사용한 기후변화 정책효과 분석)

  • Oh, Inha;Oh, Sang-Bong
    • Environmental and Resource Economics Review
    • /
    • v.22 no.4
    • /
    • pp.691-726
    • /
    • 2013
  • We develop a hybrid model which allows the change in electricity generation mix by adding the electricity-sector components of bottom-up model to the conventional CGE model. The electricity sector is represented as a sum of separate generation technologies, each of which has the form of DRTS (Decreasing Returns to Scale) production function, unlike the conventional CGE model. We compare the effects of the 30% emission reduction target using the hybrid model with those using the conventional CGE model. The cost of meeting the target is lower with the hybrid model than the conventional CGE. It is consistent with previous studies in that adding the bottom-up components to the top-down model reduces the cost of emission reduction. In an extra analysis we find that an additional regulation like RPS (Renewable Portfolio Standard) increases the cost.

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.

Effect of Expanding Benefit Coverage for Cancer Patients on Equity in Health Care Utilization and Catastrophic Expenditure (암 질환 대상 산정특례제도가 의료이용 및 의료비 부담 형평성에 미친 영향)

  • Kim, Ji Hye;Kim, Su Jin;Kwon, Soon Man
    • Health Policy and Management
    • /
    • v.24 no.3
    • /
    • pp.228-241
    • /
    • 2014
  • Background: The purpose of this study is to evaluate the effect of health insurance coverage expansion for cancer patients on equity in health care utilization and catastrophic expenditure. Methods: To analyze the causal relationship between the policy to expand benefit coverage and the change in health care utilization and out-of-pocket payments of cancer patients, this study employed a difference-in-differences (DID) method. In the DID model, the change in health care utilization, such as health care expenditure, visit days and length of stay, of cancer patients was compared with that of liver disease patients, using Korea Health Panel Data in 2009 and 2010. Results: The policy of reducing cost sharing from 10% to 5% for cancer patients did not have significant effects on equity in health care utilization. The results of this study were different from those of the previous study that showed that the reduction of cost sharing from 20% to 10% significantly improved the equity in health care utilization of cancer patients. In addition, the result of catastrophic expenditures analysis showed the policy did not change the probability of catastrophic expenditures. Conclusion: The results of this study imply that payment for non-covered services account for high out-of-pocket payments, and the reduction in cost sharing for covered services alone may have a limited effect on total financial burden on patients.

Study on the Recognition Analysis of Zero Energy House and Associated Policy Suggestion (에너지제로하우스 인식분석 및 정책 추진방향 제안에 관한 연구)

  • Lee, Chung-Kook;Lee, Jeong-Cheol;Kim, Sang-Su;Suh, Seung-Jik
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.8 no.2
    • /
    • pp.16-26
    • /
    • 2012
  • The consultation with building energy experts working at domestic government-funded research institutes and enterprises on performance set, element technology, and policy for the realization of low-energy and the survey with construction workers on the relevance of climate change in building construction, government support policy, and methodologies for the construction of low-energy house were carried in the study. In addition the public element preference survey on the low-energy house and awareness research on the low-carbonization of building were carried and presented for the development of affordable low-energy house. There was a big difference in the recognition of building energy performance setting and setting for the construction cost to realize it between experts and ordinary citizens in the study. To fill this gap education and promotion of zero energy house and securing economic feasibility through the commercialization of element technology will be needed. The satisfaction in government's zero energy house policy was normally low. To improve this low satisfaction administrative and technical support are considered to be expanded. Common high cost of construction was the top priority to resolve the problem, and enhancing renewable energy grants, tax relief, and substantial cost support could be as detailed solutions.

Effects of District Energy Supply by Combined Heat and Power Plant on Greenhouse Gas Emission Mitigation (열병합발전을 이용한 집단에너지사업의 온실가스 감축효과)

  • Shin, Kyoung-A;Dong, Jong-In;Kang, Jae-Sung;Im, Yong-Hoon;Kim, Da-Hye
    • Journal of Climate Change Research
    • /
    • v.8 no.3
    • /
    • pp.213-220
    • /
    • 2017
  • The purpose of this study is to analyze effects of Greenhouse Gas (GHG) emission reduction in district energy business mainly based on Combined Heat and Power (CHP) plants. Firstly this paper compares the actual carbon intensity of power production between conventional power plants and district energy plants. To allocate the GHG from CHP plants, two of different methods which were Alternative Generation Method and Power Bonus Method, have been investigated. The carbon intensity of power production in district energy plants ($0.43tonCO_2e/MWh$) was relatively lower than conventional gas-fired power plants ($0.52tonCO_2e/MWh$). Secondly we assessed the cost effectiveness of reduction by district energy sector compared to the other means using TIMES model method. We find that GHG marginal abatement cost of 'expand CHP' scenario (-$134/ton$CO_2$) is even below than renewable energy scenario such as photovoltaic power generation ($87/ton$CO_2$). Finally the GHG emission reduction potential was reviewed on the projected GHG emission emitted when the same amount of energy produced in combination of conventional power plants and individual boilers as substitution of district energy. It showed there were 10.1~41.8% of GHG emission reduction potential in district energy compared to the combination of conventional power plants and individual boilers.

Optimizing the Exhaustion of Inventory for Design Changes: Focusing on Concrete Pump Truck Outrigger Process (설계변경 재고 소진 최적화: E사(社) 펌프카 아우트리거 공정 중심으로)

  • Chan-Woong Park
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.174-179
    • /
    • 2022
  • Companies are making design changes by improving product quality and function to succeed while meeting customer requirements continuously. Design changes are changing the product BOM's amount, item, specification, and shape while causing a change in the product's structure. At this time, the problem of inventory exhaustion of parts before design change is a big topic. If the inventory exhaustion fails, the pieces before the design change become unused and are discarded, resulting in a decrease in asset value, and the quality cost of the design change affects the company's profits. Therefore, it is necessary to decide to minimize quality costs while minimizing waste inventory costs at the time of application of design changes. According to the analysis, priorities should be prioritized according to urgency because the quantity of items before the design change affects the applied lead time.

USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF