• Title/Summary/Keyword: Cost/Reliability analysis

Search Result 805, Processing Time 0.021 seconds

A Study for Reliability Target Setting Considering Warranty Cost and Reliability Analysis Result of Process Controller in Nuclear Power Plant (원자력 발전소용 공정 제어기의 보증 비용을 고려한 신뢰도 목표치 설정과 신뢰도 분석 결과에 대한 연구)

  • Kim, Gun Myung
    • Journal of Applied Reliability
    • /
    • v.15 no.3
    • /
    • pp.145-148
    • /
    • 2015
  • The products to meet the requirement of are installed in nuclear power plant and the reliability target should be provided in the requirement. However, it is not easy to set a reliability target using quantitative analysis. The objective of this paper is to propose a method of reliability target setting considered warranty cost for process controller and then compare a reliability target with reliability analysis result.

Reliability-Based Optimization using Sensitivity Analysis of Reliability Index (신뢰성 지수의 민감도 해석을 이용한 신뢰성에 기초한 최적설계)

  • 조효남;민대홍;권우성
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2000.10a
    • /
    • pp.101-108
    • /
    • 2000
  • An optimum design algorithm using efficient reanalysis is proposed for reliability-based optimization problems formulated as the minimization of initial cost and expected failure cost with reliability constraints. The reliability-based optimization is high cost to evaluate objective function and constraints needed reliability analysis. Therefore the sensitivity analysis of reliability index for approximated reanalysis is necessary. In this paper, three solution approaches are suggested and tested. The approaches include : (1) sensitivity analysis using finite difference; (2) sensitivity analysis using automatic differentiation (AD); and (3) sensitivity analysis with respect to intermediate variables using AD. Numerical example is optimized to show the reliability and effectiveness of the new algorithm.

  • PDF

A Case Study on Sensitivity Analysis of KHP Total Ownership Cost (KHP 총소유비용의 민감도 분석 사례 연구)

  • Byun, Hyung-Kyun;Lee, Sang-Woo;Kwon, Moon-Won;Kim, Joo-Kyun;Choi, Young-Hwan
    • Journal of Applied Reliability
    • /
    • v.11 no.2
    • /
    • pp.187-212
    • /
    • 2011
  • KHP project sets total ownership cost as the target cost by applying CAIV and administrates total ownership cost through compromise analysis, a periodical estimate and management of design alternatives for each development. Based on expected cost results, sensibility of total ownership cost is analyzed complying with the change of reliability, availability, maintainability and other related factors. By considering potential total ownership cost saving methods, first of all, this paper identifies total ownership cost changing effects for each related factor, secondly, suggests total ownership cost and maintenance and operating cost saving methods via finding components that affect total ownership cost and lastly, suggests total ownership cost saving directions that may be applied to other projects in the future.

A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects (건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구)

  • An, Sung-Hoon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.53-59
    • /
    • 2008
  • Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

A Study on Reliability Analysis & Determination of Replacement Cycle of the Railway Vehicle Contactor (철도차량 접촉기의 신뢰성 분석 및 교환주기 결정에 대한 연구)

  • Park, Minheung;Rhee, Sehun
    • Journal of Applied Reliability
    • /
    • v.17 no.4
    • /
    • pp.316-324
    • /
    • 2017
  • Purpose: The purpose of this study is to determine the replacement cycle applied age replacement policy by reliability analysis based on railway vehicle contactor's failure history data. Method: We performed reliability analysis based on railway vehicle contactor's failure history data. We found a suitable distribution by goodness of fit test and predicted the reliability through estimation of scale & shape parameter. Considering cost information we determined the replacement cycle that minimize the opportunity cost. Result: Suitable distribution was the Weibull and scale parameter & shape parameter are estimated by reliability analysis. The replacement cycle was predicted and MTTF, $B_6$ percentile life were suggested additionally. Conclusion: We confirmed that failure rate type of railway vehicle contactor is degradation model having a time dependent characteristic and examined the replacement cycle in our country's operating environment. We expect that this study result contribute to railway operation agency for maintenance policy decision.

Studies for Reliability-corrected Cost Estimation Methodology of Launch Vehicle Development (신뢰성 보정된 발사체 개발비용 추정방안 연구)

  • Kim, Hong-Rae;Yoo, Dong-Seo;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.40 no.4
    • /
    • pp.364-374
    • /
    • 2012
  • The purpose of this study is to perform the reliability-corrected development cost estimation of the launch vehicle at the conceptual design phase. In order to estimate the launch vehicle development cost, the estimation method based on the independent variable such as the rocket performance and dry mass has been mainly implemented up to now. This approach has made the approximate cost estimation possible, however, the cost variation according to the reliability requirement could not be reflected. In this paper, the cost estimation methodology that introduces the reliability factor in addition to the performance and mass in the TRANSCOST model is presented in order to improve the limitation of current cost estimation method. The development cost of KSLV(Korea Space Launch Vehicle)-II is estimated on the basis of this newly implemented concept with reliability as an added parameter.

A Study on the Correlation between Optimal Safety of Structures and Minimization of Life Cycle Cost(LCC) (구조물의 최적안전지수와 생애주기비용의 상관관계에 관한 연구)

  • Bang, Myung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.6
    • /
    • pp.94-98
    • /
    • 2014
  • This study was intend to develop the optimal design method of suspension bridge by the reliability analysis based on minimization of life cycle cost(LCC). The reliability analysis was performed considering aleatory uncertainties included in the result of numerical analysis. The optimal design was estimated based on life-cycle cost analysis depending on the result of reliability analysis. As the effect of epistemic uncertainty, the safety index (beta), failure probability (pf) and minimum life cycle cost were random variables. The high-level distributions were generated, from which the critical percentile values were obtained for a conservative bridge design through sensitivity assessment.

A Study on Work Development Direction of Cost Analysis through Cost Analysis of Micro Satellite (초소형위성 비용분석 사례연구를 통한 비용분석 업무발전 방향에 대한 고찰)

  • Lee, Tae Hwa
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.3
    • /
    • pp.461-479
    • /
    • 2023
  • Purpose: It emphasizes the importance of cost analysis for weapons systems that require enormous develop- ment costs, analyzes the problems of cost analysis steps from a practical point of view, and presents the direction of business development in terms of cost analysis reliability, timeliness, and efficiency. Methods: It analyzes the R&D cost of Micro satellites with a complex cost structure and large scale according to engineering estimation procedures, derives major analysis step-by-step problems, and presents business development directions. Results: Problems with standards and assumptions, data collection, cost division structure, and cost estimation methods were derived through the micro satellite cost analysis process, and business development directions such as expanding common standards, standardizing basic data, standardizing cost division structures and cost items, and data asset were presented. Conclusion: In order to develop work in terms of cost analysis reliability, timeliness, and efficiency, it is important to prepare and standardize standards and rules for detailed tasks at each analysis stage, and through this, it is expected that high utilization value and systematic cost data will be assetized in the future.

Minimum life-cycle cost design of ice-resistant offshore platforms

  • Li, Gang;Zhang, Da-Yong;Yue, Qian-Jin
    • Structural Engineering and Mechanics
    • /
    • v.31 no.1
    • /
    • pp.11-24
    • /
    • 2009
  • In China, the oil and natural gas resources of Bohai Bay are mainly marginal oil fields. It is necessary to build both ice-resistant and economical offshore platforms. However, risk is involved in the design, construction, utilization, maintenance of offshore platforms as uncertain events may occur within the life-cycle of a platform under the extreme ice load. In this study, the optimum design model of the expected life-cycle cost for ice-resistant platforms based on cost-effectiveness criterion is proposed. Multiple performance demands of the structure, facilities and crew members, associated with the failure assessment criteria and evaluation functions of costs of construction, consequences of structural failure modes including damage, revenue loss, death and injury as well as discounting cost over time are considered. An efficient approximate method of the global reliability analysis for the offshore platforms is provided, which converts the implicit nonlinear performance function in the conventional reliability analysis to linear explicit one. The proposed life-cycle optimum design formula are applied to a typical ice-resistant platform in Bohai Bay, and the results demonstrate that the life-cycle cost-effective optimum design model is more rational compared to the conventional design.

Planned Depot Maintenance Interval Decision for Unmanned Aerial Vehicle through Reliability and Maintainability Based Simulation and Operating & Support Cost Analysis (신뢰도 및 정비도 기반 시뮬레이션과 운영유지 비용분석을 통한 무인항공기의 계획창정비 주기결정)

  • Sang Yeob Lee;Jun Hyun Son
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.5
    • /
    • pp.1-10
    • /
    • 2023
  • This research sought to determine the optimal cycle of Planned Depot Maintenance (PDM) for Unmanned Aerial Vehicle (UAV), and PDM through Reliability and Maintainability-based simulation and Operating and Support (O&S) cost analysis using Reliability and Maintainability analysis results. The effectiveness of the PDM was verified economically, and the optimal PDM interval that balances UAV effective operations and sustaining engineering costs was presented.