A Case Study on Reason Analysis for Schedule Delay of Apartment House (공동주택의 공기지연 원인분석 사레 연구)

  • Park, Chang-Wook;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.89-94
    • /
    • 2009
  • A study was performed the analysis for the schedule delay of the public housing. To perform this study, the first study existing research literature on the cause of the schedule delay was considered. The based on existing study, this study selected the cause of schedule delay. For check of the schedule delay, this study was compared the monthly schedule and the work diary. Survey was conducted for using the selected cause of schedule delay. And the importance was calculated for using the AHP method. In a case site, the cause of the schedule delay was analyzed. The last, the delay cause was presented the map of cause of effect the based on the delay cause of a case site.

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Methodology for Developing Standard Schedule Activities for Nuclear Power Plant Construction through Probabilistic Coherence Analysis

  • kim, Woojoong
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.8-13
    • /
    • 2017
  • Nuclear power plant (NPP) constructions are large scale projects that are executed for several years, and schedule control utilizing various schedules is a critically important factor. Recently Korea independently developed the Advanced Power Reactor (APR) 1400 and is building nuclear facilities applying this new reactor type. The construction of Shin-Kori NPP (SKN) Unit 3, which adopted the APR1400, was completed and commercial operation has begun, while, SKN 4, Shin-Hanul NPP (SHN) Units 1&2, and SKN 5&6 are currently under construction. Prior to the development of the APR1400, Korea built 24 reactors and accumulated the schedule data of various reactor types which provided the foundation for schedule reduction to be possible. However, as there is no schedule development and review system established based on the standard schedule data (standard activities, durations, etc.) by reactor type, the process for developing the schedule for new builds is low in efficiency consuming much time and manpower. Also all construction data has been accumulated based on schedule activities. But because the connectivity of activities between projects is low, it is difficult to utilize such accumulated data (causes for schedule delay, causes for design changes, etc.) in new build projects. Due to such reasons, issues continue to arise in the process of developing standard schedule activities and a standard schedule for nuclear power plant construction. In order to develop a standard schedule for NPP construction, i) the development of an NPP standard schedule activity list, ii) development of the connection logic of NPP standard schedule activities, iii) development of NPP standard schedule activity resources and duration, and iv) integration of schedule data need to be performed. In this paper, an analysis was made on the coherence of schedule activity descriptions of existing NPPs by applying the probabilistic methodology on activities with low connectivity due to the utilization of the numbering system of four APR1400 reactors (SHN 1&2 and SKN 3&4).This study also describes the method for developing a standard schedule activity list and connectivity measures by extracting same and/or similar schedule activities.

  • PDF

Agent-based control systemfordistributed control of AGVs (AGV의 분산제어를 위한 에이전트 기반의 제어시스템)

  • O, Seung-Jin;Jeong, Mu-Yeong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.1117-1123
    • /
    • 2005
  • This paper deals with a new automated guided vehicle (AGV) control system for distributed control. Proposed AGV control system adapts the multi-agent technology. The system is composed of two types of controller: routing and order. The order controller is in charge of assignment of orders to AGVs. Through the bidding-based negotiation with routing controllers, the order controller assigns a new order to the proper AGV. The order controller announces order information to the routing controllers. Then the routing controllers generate a routing schedule for the order and make a bid according to the routing schedule. If the routing schedule conflicts with other AGV's one, the routing controller makes an alternative through negotiation with other routing controllers. The order controller finally evaluates bids and selects one. Each controller consists of a set of agents: negotiation agent, decision making agent and communication agent. We focus on the agent architecture and negotiation-based AGV scheduling algorithm. Proposed system is validated through an exemplary scenario.

  • PDF

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment (건설기계 유압밸브 생산을 위한 일정계획 시스템 개발)

  • Kim, Ki-Dong;Lee, Bo-Hurn
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.61-67
    • /
    • 2007
  • The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

  • PDF

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

A system's approach for an aggregate control of order entry-production schedule-shippment cycle (수주-생산-출하관리의 효율성제고 종합방안)

  • Jeong, Byeong-Hui;Yeo, Sang-Hwan;Lee, Myeon-U;Yun, Jo-Deok
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.7 no.2
    • /
    • pp.43-54
    • /
    • 1981
  • In a complex production system, the efficient control of order entry-production schedule-shippment cycle is one of the most important managerial aspects. In this paper, an aggregate control mechanism has been developed. The result showed steps for improving and for optimizing the total systems efficiency. A simplified guidelines for a con ceptual data base has been suggested.

  • PDF

Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS. (WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구)

  • Ahn, Jae-Hong;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling (대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구)

  • Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.153-161
    • /
    • 2004
  • The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.