• Title/Summary/Keyword: Contract Power

Search Result 198, Processing Time 0.022 seconds

Study on Simulator for computing Demand Rate using Index of Transformer's Demand Rate (변압기 용량 지수를 이용한 수용률 산정 시뮬레이터 개발에 관한 연구)

  • Kim, Young-Il
    • Proceedings of the KIEE Conference
    • /
    • 2007.11c
    • /
    • pp.97-100
    • /
    • 2007
  • There are regulations on each building for its classification and It is corresponding determined contract demand. For transformer's capability calculation algorithm, cumulated power information of each customer is used to analysis the correlation between power usage and Demand Rate. By modeling this using Least Square Method, it can be targeted to recognize the pattern of transformer use in the past and make a prediction on it in the future.

  • PDF

The Effect of Uncertainty in Sea Trial Measurement System on Speed-Power Performance

  • Seo, Dae-Won;Noh, Jackyou
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.26 no.3
    • /
    • pp.269-276
    • /
    • 2020
  • Sea trial tests are necessary to verify speed-power performance, and are an import contract between ship owners and shipyards. The International Organization for Standardization (ISO) published ISO 15016:2015, which specifies the correlation method between model and full-scale ships. The results of sea trials have been questioned because of the uncertainty of speed and power measurements, especially when sea conditions differ from ideal calm water conditions. In this paper, such uncertainties were investigated by utilizing the standard speed-power trial analysis procedure defined in ISO 15016:2015 through Monte Carlo simulations. It was found that the expanded uncertainty of the delivered power (PDid) at 95 % confidence interval (k = 2) was ±1.5 % under 75 % MCR conditions.

A Study on the Building Energy Analysis and Algorithm of Energy Management System (건물 에너지 분석 및 에너지 관리 시스템 알고리즘에 관한 연구)

  • Han, Byung-Jo;Park, Ki-Kwang;Koo, Kyung-Wan;Yang, Hai-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.505-510
    • /
    • 2009
  • In this paper, building energy analysis and energy cost of power stand up and demand control over the power proposed to reduce power demand. Through analysis of the load power demand special day were able to apply the pattern. In addition, the existing rate of change of load forecasting to reduce the large errors were not previously available data. And daily schedules and special day for considering the exponential smoothing methods were used. Previous year's special day and the previous day due to the uncertainty of the load and the model components were considered. The maximum demand power control simulation using the fuzzy control of power does not exceed the contract. Through simulation, the benefits of the proposed energy-saving techniques were demonstrated.

The Solution Of Software Contract (기획특집 - 공공 소프트웨어 발주관행 개선방안(IT 프로젝트관리 실무))

  • Shim, Ki-Bo
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.5
    • /
    • pp.29-31
    • /
    • 2009
  • A general practice in software ordering behavior in public sector has been an enormous obstacle standing in development path of Korea's software industry. Standard on software development cost estimation is supposedly based on Function Point, but in general, it is on headcounting (a number of people involved in a project). Moreover, it is difficult to change a contract in an on-going project, since statement of work is not precisely and carefully described. But it has a simple solution. Design and Implementation should be a separate project, as in construction industry, and both power and responsibility for design should be given to an expert with a national-level qualification. Here, there is a simple way for Korea to reborn as one of the strongest software country.

  • PDF

A Study on the U.S. Cases about the Transaction of Software (소프트웨어 거래의 UCC 제2편의 적용에 관한 연구 - 미국의 판례를 중심으로 -)

  • Kim, Jae-Seong
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.18
    • /
    • pp.7-25
    • /
    • 2002
  • Owing to a tremendous progress of information technology we have faced a great change of a society. This change has happened to almost all of a society. As a result intangible goods are also included as a major concern in international trade. We may say U.S. is one of the countries transaction of software is the most flourishing. I have tried to classified the cases of software transaction in U.S. into five groups. As a result I have known the UCC had been applied to the almost transaction of standard software. However UCC had not been applied to custom software and data processing. In these days UCITA which is very similar to a previous proposal UCC 2B has been presented. This is a contract law that would apply to computer software, multimedia products, and databases. It has been designed to create a uniform commercial contract law for those products. Now therefore we should make observation of a tendency about transaction of software in U.S. The reason is that we pay attention to the symbol and dormant power of U.S. in international trade.

  • PDF

The Installation of Prefabricated Joint for 161kV XLPE Cable Underground Transmission Line (161kV XLPE CABLE용 Prefabricated joint의 실선로 적용)

  • Bong, W.K.;Chang, K.W.;Lee, H.S.;Oh, J.O.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1611-1613
    • /
    • 1998
  • The new type of prefabricated joint for 161kV XLPE cable have been developed. we, LG Cable & Machinery Ltd., made an huge contract with an foreign country's Power company for the supply of cable and accessories, the training of jointing and termination work to local personnel, technical assistance by joint venture and the supervision of installation and commissioning. By the end of 1997, one of several routes under the contract successfully finished being constructed and specially tested on site. In operation, now this underground transmission line proves well the reliability and efficiency of prefabricated joint and termination applied first time in foreign country.

  • PDF

A Study on Determining an Appropriate Power Trading Contracts to Promote Renewable Energy Systems

  • Choi, Yeon-Ju;Kim, Sung-Yul
    • International Journal of Precision Engineering and Manufacturing-Green Technology
    • /
    • v.5 no.5
    • /
    • pp.623-630
    • /
    • 2018
  • The renewable energy systems have been in the spotlight as an alternative for environmental issues. Therefore, the governmental policies are being implemented to spread of promote power generation system using renewable energy in various countries around the world. In addition, Korea has also developed a policy called the power trading contract which can profit from electricity produced from renewable power generation system through Korea Electric Power Corporation (KEPCO) and Korea Power Exchange (KPX). As a result, the power trading contracts can trade power after self-consuming in-house by using small-scale renewable power system for residential customers as well as electricity retailers. The power trading contracts applicable as a small-scale power system have a 'Net metering (NM)' and a 'Power Purchase Agreement (PPA)', and these two types of power trading contracts trade surplus power, but payment method of each power trading is different. The microgrid proposed in this paper is based on grid connected microgrid using Photovoltaic (PV) system and Energy Storage System (ESS), that supplied power to residential demand, we evaluate the operation cost of microgrid by power demand in each power trading contracts and propose the appropriate power trading contracts according to electricity demand.

Research for Installation and Operation of High Temperature Superconducting Cable System (고온 초전도 케이블 시스템 설치 밀 운전을 위한 연구)

  • Choi, Hyung-Sik;Sohn, Song-Ho;Hwang, Si-Dole
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.653-657
    • /
    • 2005
  • The commercial contract was made firstly in the world for one set of high temperature superconducting(HTS) cable system between buyer, Korea Electric Power Research Institute and seller, Sumitomo Electric Industries, Ltd. in August 2004. After fabrication, test and examination, the HTS cable system will be installed at the KEPRI's test field in Gochang, Jeonbuk province from the time of July 2005. KEPRI is preparing measurement and test facilities for field test of the HTS cable system and carrying out researches into the design and construction of superconducting cable test building, evaluation of cooling performance, measurement of AC loss, analysis of the quench phenomena due to excess current and means of linking the HTS cable system to the existing electric power supplying system. The constitution of, the method to install and the plan of test operation of the HTS cable system will be presented in this paper.

  • PDF

A Case of the Distribution Power System PQMS Construction & Harmonic Voltage Analysis (배전계통 PQM 시스템 구축 및 고조파전압 분석사례)

  • Park, Yong-Up;Lee, Keon-Hang
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.9
    • /
    • pp.108-117
    • /
    • 2010
  • The main contents of this paper are the PQM system construction case and distribution system harmonic voltage analysis. The PQM system has constructed by KEPCO in order to investigate power quality of distribution power system for new power quality standard of KEPCO. In result, we have confirmed that voltage harmonic measurement value of the high voltage contract customer 8 households is suitable the KEPCO harmonic standard tentative plan. And the voltage harmonic value of distribution line end side is not always more high than source side by harmonic current offset effect. In the future, acquired data by season, region, load from the PQMS will be used on the resonable harmonic standard enactment in KEPCO.

A Study on Comparative Analysis of Power Consumption Characteristics and the revulsion of investment on the application of a BESS in Subway Substation (도시철도 변전소 단위구간의 전력사용 실태 및 피크제어용 BESS 도입에 따른 경제성 분석)

  • Jung, Hyun-Ki;Kim, Se-Dong;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.85-90
    • /
    • 2014
  • This paper shows a reasonable demand power, that was made by the systematic and statistical way considering actual conditions, such as investigated transformer capacity and peak power for the last 6 years of subway substation customer as to AMR. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data. It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimum and thus it was carried by the linear and nonlinear regression analysis. And we studied on the application of a BESS. Analysis showed that the revulsion of capital is about 3 years and 4 months.