Characteristics Analysis of Seasonal Construction Site Fall Accident using Text Mining (텍스트 마이닝을 활용한 계절별 건설현장 추락사고 특징 분석)

  • Kim, Joon-Soo;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.113-121
    • /
    • 2019
  • The death rate of industrial accidents per 10,000 people in Korea is two to three times higher than that of major countries. Falling accidents at the construction site happened to have caused the most deaths. Analysis of existing research and measures by national institutions showed that the industrial accident management concentrated on falling accidents was insufficient and the seasonal safety management measures were not enough. There is thus the need for research that provides detailed and enough information on falling accidents. This study, therefore, aims to overcome the limitations of existing research and safety management accident response using a methodology that provides the necessary information for the prevention of fall accidents by deriving seasonal crash characteristics of the construction site. In order to provide enough information, 387 cases of seasonal construction site falling were collected, which describes the causal relationship of accidents. Text mining using principal component analysis and cluster analysis was carried out. The analysis showed that: In the spring, snowfall and unreasonable operation of equipment including lifts were the major cause. In summer, most accidents were caused by form, insufficient safety inspection, and installation work. In autumn, weather factors such as wind and typhoon were the cause. In winter, material transportation, exterior wall work, and ignore safety precautions were the cause of the crash.

3D-based Earthwork Planning and CO2 Emission Estimation for Automated Earthworks (자동화 토공을 위한 3D 토량배분과 탄소발생량 추정)

  • Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1191-1202
    • /
    • 2013
  • The former researches on earthwork automation were mainly focused on GPS and sensor application, environment modelling, equipment path planning, work information management, and remote control etc. Recently, reducing $CO_2$ emission becomes one of main focuses for an automation research. In the case of earthwork operations, many kinds of construction machines or robots are involved, which can cause high level of $CO_2$ in a construction site. An effective earthwork plan and construction machine operation can both increase productivity and safety and decrease $CO_2$ emission level. In this research, some automation concepts for green earthworks are suggested such as a 3D construction site model, a 3D earthwork distribution based on two different earthwork methods, and an earthwork package construction method. A excel-based simulator is developed to generate the 3D earthwork distribution and to estimate the level of $CO_2$ emission for the given earthwork.

A Study on the Development of a Public Building Renewal Model and Incorporating Mobility Technologies and Policy Innovations (모빌리티 기술을 접목한 공공건축물 리뉴얼 모델 개발 및 제도적 지원 방안 연구)

  • Nam, Seong-Woo;Bang, Hong-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.483-494
    • /
    • 2024
  • The purpose of this study is to develop a model for renewing old public buildings by incorporating mobility technology into them for the convenience of citizens' transportation and the enhancement of public services, and to propose support measures to improve the direction of implementation. The main contents and results of this study are as follows. First, the renewal target site was selected based on the technical considerations and evaluation criteria required for the renewal of public buildings incorporating mobility technology, and the construction was planned by analyzing the necessary mobility technology based on the size, area, and district unit plan of the selected target site. Second, the expected cost was calculated based on the construction plan and the financial support plan necessary for reflecting mobility technology was proposed. Third, the improvement plan of the building code system required for the development of public building renewal incorporating mobility technology was proposed. This study had limitations in that it could not reflect detailed construction costs due to the lack of design standards and experience, and it was difficult to identify specific problems due to the lack of specific operation methods and implementation cases.

Case History of Vibration-controlled Reckmass Breakage Method by Rock Splitter (할암기를 이용한 무진동 암반 파쇄공법의 현장 적응 사례)

  • 최영천
    • Explosives and Blasting
    • /
    • v.22 no.3
    • /
    • pp.71-78
    • /
    • 2004
  • Explosive blasting, hydaulic power unit and rock splitter are typically utilized for rockmass breakage and cutting in reconstruction of building structures and other construction site. Hydraulic rock cutting method, that can be utilized any weather conditions, has been applied mainly by experience for controling damages caused by vibration, noise and rock cuttings, and reducing damage claim by protecting adjacent structures. However, it is required to understand the characteristics of rockmass to improve operation efficiency. Although every cutting method has its own advantage, but it should be applied by considering site circumstance and rockmass properties in details to maximize the operation efficiency and economic feasibility.

Rock/Soil proportion estimation using image processing technique (광학식 측정방법을 활용한 풍화지반 버럭의 암/토사 구성비율 추정방법)

  • Jin, Kyu-Nam;Jin, Kim-Young;Park, Sung-Wook;Cho, Gye-Choon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1425-1432
    • /
    • 2010
  • In large construction site, although soil conversion factor is so significant to preliminary design, operation design and calculating the cost of construction that it is important to take reasonable estimation and application, the standard of soil conversion factor for weathered ground doesn't clearly suggested yet. So in this study, at first we obtain the image using DSLR - high resolution camera and Laser scanner in the Haeng-Bok city constructin site, then analysis the ratio of soil and rock using various image processing method(Sobel method, Laplace method, Highpass filter, Hue and Saturation analysis). Mutual comparation with the result of image processing analysis and manual segmentation of 5case image in the cad. As a result, best image processing method was different for each case. In case of high propotion of rock, Laplace was best and in case of high propotion of soil, Highpass was best, and mixed case Laplace was best.

  • PDF

Innovation Plan on safety and health education in the Covid-19 era by a survey (설문조사를 통한 코로나19 시대 안전보건교육의 혁신방안에 대한 연구)

  • Ahn, Yongro;Bang, Yunsu;Yoon, Younggeun;Oh, Taekeun
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.3
    • /
    • pp.543-550
    • /
    • 2022
  • Construction sites cannot escape the impact of the COVID-19 situation, and various efforts has been made to prevent this, such as strengthening on-site quarantine and minimizing face-to-face contact between personnel. In particular, there have been many changes in the operation of safety and health education, such as reduction in the number of training, and an increase in accidents due to negligence in safety and health education. Therefore, this study tried to establish an educational direction suitable for the COVID-19 era by survey on the actual conditions of safety and health education in the field and it is hoped that research sutures will contribute to the reduction of accidents.

Research on the Direction of Building an Integrated Smart Platform at Construction Sites (건설현장 통합 스마트플랫폼 구축방향에 대한 연구)

  • Yeon Cheol Shin;Yu Mi Moon
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.3
    • /
    • pp.620-634
    • /
    • 2024
  • Purpose: This study aims to strengthen the linkage between the construction site and the headquarters, suggest the direction of building an integrated smart platform that can actually be operated and utilized in the field, and effectively implement safety management. Method: Agile methodologies were applied to build a flexible and scalable system through cloud-based and three-tier architectures. Functional requirements were set through an on-site survey, and design and construction were carried out by reflecting personal information protection and legal requirements. Result: The integrated smart platform proposed in this study strengthens the connection between the site and the headquarters to maximize the effect of safety accident prevention and safety management. This system has improved the safety awareness of workers and managers, and has realized more efficient safety management through a unified communication system. Conclusion: In the establishment of an integrated smart platform, it is essential to reflect the characteristics of the site when selecting the development method and establishing the function plan. In the basic design and detailed design stages, it is necessary to establish security measures, design mobile functions, and review device expansion, and consider enterprise-wide safety management, user convenience, and scalability. It is also important to maintain and improve the system, reflect legal requirements, and support the elderly and foreign workers. By strengthening personal information and CCTV security and continuously improving it by reflecting user opinions, it can be expected to activate an integrated smart platform.

Quantified Evaluation on the Qualitative Criteria for the Selection of Appropriate Concrete Slab Form-works for Residential Buildings (델파이 기법을 이용한 정성적 공법 선정 요인의 정량적 평가 분석)

  • Lee, Kyung-Suk;Lee, Tae-Hee;Shin, Young-Keun;Kim, Tae-Hyung;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.136-144
    • /
    • 2011
  • The form-work operation of concrete structures is a major element determining the period and cost of construction projects. However, the selection of the appropriate form-work system is dependent on the experience of the site personnel only. In this paper, existing methods (Aluminum form, Sky deck) and new slab form-work methods (AFB: Aluminum panel Form with dropping Beam) were selected. Each method was estimated by means of Delphi techniques based on the qualitative analysis data. This paper suggests an evaluation methodology of slab form-work application in construction sites by calculating qualitative evaluation scores. The methodology finding quantified scores of qualitative criteria can be available to be applied to other construction operation evaluation methods.

A Study on the Plan for Advanced Noise-Policy in the 21st Century (21세기 소음정책 선진화 방안 고찰)

  • Yang, Geun-Ho;Park, Young-Min;Lee, Nae-Hyun;Chang, Yoon-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.1
    • /
    • pp.21-30
    • /
    • 2009
  • The study show that things about the noise control are indicated at The Noise & Vibration Control Act and the other Act. Also, the details program and total government ministries' program for the noise control are indicated what are the advance noise control plan. The study consist of the four part which are "Draw up the environmental noise infrastructure plan; the install shall be done the noisemap & the automatic noise measurement devices", "Resetting of environmental noise standard at the application area and Introduce of indoor noise; the guide for region classification of the noise standard & indoor noise", "Setting of aircraft noise standard and Program of measurement point operation; the noise-assessment-standard shall change from WECPN to new index($L_{den}$, $L_{dn}$, $L_{Aeq\;24h}$) & the operation and control of aircraft noise measurement changes from local environmental office to central control center" and "The method of noise regulation at construction site and the plan on making of standard for vibration regulation; It shall be made that the guideline of construction noise should include a target-construction, noise standard etc & the ministries shall unify control about construction vibration of the blasting vibration". The advance noise-policy will improve efficiency to deal with civil appeal & damage on residents about noise.

원전부지 지진감시

  • 노명현
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.04a
    • /
    • pp.17-24
    • /
    • 1999
  • The porvision against earthquakes and aseismic design of nuclear power plants (NPPs) in Korea are composed of four stages: site-selection, design, construction, and operation stages, Since regulatory criteria are strictly applied in each stage, the NPPs in Korea are believed to have a sufficient safety against maximum potential earthquakes. However, it has been recognized that those regulatory criteria borrowed from U.S. should be replace by Korea-specific ones by using earthquake data obtained from earthquake observation at and around NPP sites. Also, the government made a plan after the Yongwol and th Kyongju earthquakes that the regulatory body operates an independent earthquake network in order to reinforce the earthquake preparedness of NPPs. In compliance with the government's plan, this project is aiming at deployment of an earthquake motoring network composed of four seismic stations at NPP sites to record earthquake ground motions at NPP sites, to derive attenuation formulas of various ground motions and site-specific response spectra, and to develop structural intergrity assesment program.