• Title/Summary/Keyword: Construction site office

Search Result 122, Processing Time 0.027 seconds

A Preliminary Studty on the Efficient Management Manpower Staffing According to the Building Size -Focused on Office Buildings- (건축규모에 따른 관리인력의 효율적 배치에 관한 기초연구 -오피스 건물을 중심으로-)

  • Lee, Won-Suk;Kim, Shin-Eun;Kim, Sun-Kuk;Lee, Dong-Hoon;Won, Il-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.191-194
    • /
    • 2010
  • Construction companies are now trying a variety of cost-cutting strategies in the midst of recent slump of construction market. Notably, contract workers and local hires are accounting for increasing portion of management manpower as a part of their cost-reduction drive. However, construction site manpower researches to date have focused primarily on productivity analysis of site laborers, with little attention to the productivity of site management resources. This study aims to analyze the staffing status of office building construction site management manpower in reference to project size. Conclusions herein will provide basic inputs for subsequent attempts to build a model to enable efficient staffing of construction site management manpower.

  • PDF

Development of Wireless Communication System and Application Program for Realtime Schedule Management at Construction Site (건설현장 실시간 공정관리를 위한 무선통신시스템 구축 및 응용프로그램 개발)

  • 진교홍;이혜원;김지홍
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.1
    • /
    • pp.192-199
    • /
    • 2004
  • As the construction site becomes larger, more complex and more special, the information of construction is expanded in quantity and specialized in quality. Therefore the computing system is necessary to effectively manage the construction schedule management. At present, main office at construction site bring in the computing system to perform the schedule management, so the data input and access for schedule management is performed by engineer on foot between construction site and main office. Therefore in this paper, we arrange wireless communication system between construction site and main of office and develop application program for data input and access of schedule management immediately using PDA at construction site. Through the our system we can improve the schedule management at construction site, and we can look forward to reduction of manpower, equipments, time, and money in whole construction.

A Study on the Reasonable Selection of New Ward Office Building Site Using Analytic Hierarchy Process (AHP기법을 활용한 공공청사 신축 부지의 합리적인 선정에 관한 연구)

  • Lim, Byung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.6
    • /
    • pp.75-82
    • /
    • 2008
  • The purpose of this study is to present the rational decision process for new ward office building site. AHP Technique used in this study considers both quantitative and qualitative factors on the basis of decision maker's intuitive, reasonable or unreasonable judgement by giving weight through mutual comparision of publicity factors. The evaluaion factors were refer to another five ward office there were executed these kinds of new site selection before. These standards are composed of 6 middle groups and classified into 9 detailed standards. Alternative building sites are five places in this district. The final evauation standards are Accessibility, Urban Expansion Possibility. Distrct balance, Environment, Financing. Development easiness. And It became clear that the priority of evaluation is Financing > Urban expansion > Accessibility > Development easiness > District balance > Environment. In conclusion, it was determined that alternative " E " is the most adequate place for new ward office building.

Development of Construction Site Monitoring System Using UAV Data for Civil Engineering Project (UAV를 활용한 토목공사 현장 모니터링 시스템 개발에 관한 연구)

  • Jeong, Juseok;Han, Seonju;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.41-49
    • /
    • 2017
  • The ordering organizations of civil engineering project manage the construction site indirectly because the construction site is mostly located at a remote location and the public official also manages many sites. Since the civil engineering project has a wide working area, it is not easy to know the status of the whole project quickly by the indirect management method by report of the field practitioner. In order to solve these problems, the field management system between the ordering organization and the field office is changing from offline to online. This study suggests an advanced construction site management system that obtains site-related 3D information with the use of UAV and shares the information between the construction site in remote locations and their supervising authorities. To develop an UAV application system, the problems of field management in many actual sites were analyzed and derived necessary functions such as status reporting and online information management. The developed system was applied to actual field to verify its usability and compared the efficiency improvement with existing field management method.

Configuration and Construction for the KASS KRS Site Infrastructure

  • Jang, HyunJin;Jeong, Hwanho;Son, Minhyuk;Lee, ByungSeok
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.10 no.2
    • /
    • pp.139-144
    • /
    • 2021
  • In this paper, we described configuration and construction of infrastructure for the KASS Reference Station (KRS), subsystem of Korea Augmentation Satellite System (KASS). KASS system consists of three subsystems(KRS, Mission Control Center (MCC), KASS Uplink Station (KUS)). One of these subsystems, KRS receives GNSS data for generating range error and integrity verification and sends to MCC. It is needed to antenna facilities for mounting GNSS antenna and shelter for operating KRS and infra equipment(power and network system, lightning and grounding system, fire extinguish) for operating KRS. For this reason, we have established the requirements for KRS infrastructure and constructed infrastructure for KRS to meet the requirements of KRS infrastructure.

A Study on the P.S.M. system for the Construction Safety (건설안전을 위한 P.S.M. 기법에 관한 연구)

  • Lee, Song;Son, Gi-Sang;Choi, Won-Il;Oh, Tae-Sang;Chae, Jum-Sik
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.4
    • /
    • pp.101-111
    • /
    • 2000
  • In order to introduce P.S.M. system adequate to domestic construction first, many cases similar to advanced foreign P.S.M. system have been collected and compared to the domestic situation. Then, the current safety management status of bridges, subways, apartment and office building construction are investigated while visiting interview, using questionnaire at site have being done. The potential hazard and measurement have been investigated for each kind of works, and the domestic introducing method of P.S.M. system is analyzed with expert discussion. In order to represent how to make out P.S.M. plan, the questionnaire is made out using each five place for bridge, subways, apartment and office building. As the weight factor for potential hazard of each work obtained from more than forty site places, is produced and shown. Also, a direction the recommendation is suggested to improve tool in each construction site with work schedule. It is thought that proposed schedule contributed to keeping in safe business administration of each company in decreasing many effort at the construction site.

  • PDF

Analysis and improvement plan for job stress relief activities of technical personnel in architectural design offices -based on staff- (건축 설계사무소 기술인력의 직무스트레스 해소활동 분석 및 개선방안 -사원을 중심으로-)

  • Cho, Sang-Hyeok;Gil, Min-Wook;Ahn, Jong-Hyeok;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.125-126
    • /
    • 2022
  • Office workers at the architectural design office are under job stress for various reasons such as excessive working hours, friction with the site, and unpredictability of work. This can increase not only the negative image of office workers in the construction industry, but also the avoidance of young manpower in the future. This study investigated the specific purpose of each activity as a problem of job stress relief activities in the architectural design office, and the specific purpose and goal setting of each activity as a way to improve job stress relief activities.

  • PDF

Technical Trend of Offshore Geotechnical Site Investigations (해상 지반조사 분야의 기술 동향)

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2007.09a
    • /
    • pp.639-653
    • /
    • 2007
  • Offshore geotechnical site investigation of the seabed ground has been a key factor of the successful construction of various types of offshore structures like as sea-crossing bridges, submerged tunnels, and other marine facilities. Offshore investigations are not easy tasks because of the wave, wind, tidal ebb and flows, and others. Recent developments of offshore equipment including platforms and testing devices like as maine cone penetrator have inspired us to get more reliable characteristics of the seafloor. General information on the offshore site investigations and technical trends concerned are introduced.

  • PDF

A Case Study of PHC Pile Behavior Characteristics on Dynamic Compacted High Rock Embankment (고성토 암버력 동다짐 지반에 시공된 PHC 말뚝의 거동특성 사례연구)

  • Yu, Nam-Jae;Yun, Dong-Kyun;Bae, Kyung-Tae;Kim, Hyung-Suk;Lee, Dal-Ho;Park, Yong-Man
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.519-526
    • /
    • 2010
  • The construction site for $\bigcirc\bigcirc$ transformer substation was located at a mountain valley. In order to prepare the site, the valley was first filled with crushed rock debris up to 63m. Since the main concern of this project is to minimize differential settlement of the foundation of transformer facilities, dynamic compaction was performed every 7m followed by reinforcement with EMP(Ez-Mud Piling). The EMP is one of bored piling methods, in which a hole is bored by means of air percussion and maintain by injecting Ez-Mud. Then a PHC pile (Pretensioned spun High strength Concrete pile) is embedded and finalized with a hammer. In this study, bearing capacities and long term behavior of a pile installed by EMP were investigated. To achieve these objectives, a series of tests such as static and dynamic load tests were conducted. In addition, a construction quality control standard was proposed based on the test results.

  • PDF

A Study on the Efficient Technical Assistance for Small-sized Construction Sites (소규모 건설현장의 효율적인 기술지원 방안 연구)

  • Lee, Gi-Tae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.72-76
    • /
    • 2006
  • This study deals with problems of technical assistance through accidents analysis and questionnaires on small-sized construction sites which are difficult to understand real condition and administrate legally and indicated following efficient methods of technical assistance. (1) Ensuring access to the small-sized construction sites. (2) Delegation technical assistance service to civilian and supporting selected. (3) Raising of the person's safe consciousness concerned with the small-sized construction sites. (4) Safety consulting for the head office of small-sized construction sites.