• Title/Summary/Keyword: Construction quality control

Search Result 868, Processing Time 0.034 seconds

A Study on a Systematization of Preliminary Construction Control for the Quality and Schedule Management of APT Construction (품질확보 및 공기지연예방을 위한 공사관리 체계화에 관한 연구)

  • Park, Hong Tae;Lee, Yang Kyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.347-353
    • /
    • 2008
  • Generally speaking, it is important to know the activities itself exactly and to control the activities correctly so as to assure timely progress and the quality of any project. In order to progress smoothly in accordance with construction schedule, it is important to systematize the preliminary arrangements necessary for each process and then manage them. In this study, in order to progress smoothly the quality and schedule management of the construction, we can be made systematically pre-works in accordance with construction schedule by the civil construction items of the apartment house construction. we suggested pre-construction control item by the workers through experiential method of construction engineers in accordance with network schedule.

A Study on the Quality Control Plan for Waterproof Construction in Apartment Houses (공동주택 방수공사 품질관리 방안 마련에 관한 연구)

  • Kim, Kwang-Ki;Kim, Byoungil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.109-120
    • /
    • 2024
  • For successful waterproofing construction, it is very important to secure construction quality as well as material performance of waterproofing materials used in construction. Due to the long-term cost reduction policy following the economic downturn in the construction market, most construction companies are using general low-priced waterproof materials rather than high-quality waterproof materials without clear quality control standards. Without clear education on construction, construction is being carried out with meaning only on construction activities. In addition, the waterproofing method applied in combination is a situation where water leakage occurs due to waterproofing failure due to insufficient construction quality because the construction method is complicated. Therefore, it is necessary to review the quality control measures(design, materials, construction) for successful waterproofing work and improve problems that are derived so that stable waterproofing work can be done. In order to expect the leakage prevention effect of a building, first, it is required to select appropriate materials for each part of the building and environment in the design stage, and the selected materials must satisfy all items of the Korean Industrial Standard(KS). Second, to secure the quality of waterproofing construction, sincere construction by workers is required. In this paper, we tried to describe "review of waterproof design", "constructor education", "site inspection", and "criticism(correction/supplementation)" as quality control measures after material selection.

A Case Study Of Construction Quality And Measurement Control of High Rock Embankment (고성토 암버력 지반의 시공품질 및 계측관리 사례)

  • Bae, Kyung-Tae;Cha, Kyung-Seob;Park, Yong-Man;Kim, Kang-Kyu;Kim, Hyung-Suk;Yi, Chang-Tok
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.891-898
    • /
    • 2009
  • A high rock embankment by means of dynamic compaction has hardly carried out in domestic area. For the successful accomplishment of such a high rock embankment, construction quality and measurement control are conducted. Plate loading tests are carried out to verify the bearing capacity and safety against the long term settlement. In addition, settlement of each layer is measured in order to verify the effect of dynamic compaction and to predict long term settlement.

  • PDF

Suggestion for Integrated Process Quality Control for Facility Management of Smart City at Construction Stage (Smart City 시공단계 시설물 통합품질관리 프로세스 제안)

  • Park, In-Woo;Kim, In-Han;Choi, Jung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.535-544
    • /
    • 2016
  • Korean government is promoting "K-Smart City" to overseas market which is an integrated solution of construction industry with ICT(Information and Communciations Technologies) industry. Due to nature of Smart City, construction quality and the development quality of the facilities need to be established to improve the overall quality. However, guidelines and regulations to initiate quality control for Smart City are behind the actual demand. This deficiency is bringing quality control for construction and ICT to be controlled separately causing lack of synergy and resulting in overall quality degradation. This research is designed to improve the construction quality of Smart City during its establishment stage by integrating ICT system with on-site construction (Integrated control center and on-site equipment). The adoption of this research to a real Smart City case had resulted in 22% reduction of construction inspection failure (Audit), and also allowed Construction Company to pre-align quality control of all purchased items of ICT Infra that resulted in 18% reduction of nonconformity, thus contributing to an overall quality improvement. This research is expected to be used widely among all construction industry of Smart City.

Construction and Quality Control Example of Cold Weather Concreting in Field (현장에서의 한중콘크리트의 시공 및 품질관리 사례)

  • Park, Jong-Gun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.171-175
    • /
    • 2001
  • The quality control application of concrete are one of the most important problems to be considered in cold weather concreting. And, the construction is going on now Therefor, the major test variables are compressive strength of concrete, curing method and volume of air content. This shown to be possible to construction and quality control of cold weather concreting in field.

  • PDF

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

The Improvement Plan of Quality and Organization Management through the Survey of Actual Condition in Construction Work (건설공사 실태분석을 통한 품질 및 조직관리 개선방안)

  • Choi, Byung-Ju;Choi, Seok-Woo;Kim, Ok-Kyue
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.213-218
    • /
    • 2007
  • Domestic by opening of world construction market with recent FTA should be achieved systematic action that of exoteric surrounding construction environment to inculcate this because consciousness structure unpreparedness of legation fields about quality is expose for hindrance factor for QI in construction spot by quality and organization management official important thing for building company's QI because conquest is possible through QI of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of change and good quality rapidly, organization's CEO determination must become side improvement the formation government official enemy, and when inspect by each process, responsible persons participate cooperation enterprise space-time. To improve this because complete charge department for quality control appears that organization management need complete charge department being expose by greatly unprepared misgovernment in heavy hydrogen building company, expense that CEO under direct control histiocyte modeling air with AHP analysis is economical will be cost, but is construed can bring excellent effect in operation management side of quality and organization such as cost-cutting effect in maintenance side and I should do so that can occupy competitive power high position with tissue at active quality complete charge deputy.

  • PDF

Influences of the Construction of the Torrent Control Structure using Customized Tetrapods on the Stream Water Quality at Valley (맞춤형 테트라블록을 이용한 야계사방구조물이 계류수질에 미치는 영향)

  • Park, Jae-Hyeon;Ma, Ho-Seop;Kim, Ki-Heung;Youn, Ho-Joong
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.1
    • /
    • pp.105-111
    • /
    • 2011
  • The purpose of this study was to find out the effect of a torrent control structure using customized tetrapods on the forest water quality conservation and management. The study was conducted in the Honggye valley located in Sanchung-gun, Gyungsangnam-do, and stream water quality was compared before and after construction of torrent control structure. After construction of the torrent control structure using customized tetrapods, pH of stream water didn't get out of the range of River water quality standard class I. After construction of the torrent control structure using customized tetrapods, Dissolved Oxygen concentration didn't change, and Electrical Conductivity measurements agreed well within the range of normal clean stream water quality. After construction of the torrent control structure using customized tetrapods, average of total amount of anion was 3.07/2.30~3.60 mg/L, being slightly greater than before construction. Stream water quality after construction of the torrent control structure was similar to before construction. Therefore, it was find out that the torrent control structure didn't affect stream water quality.

Comparion of Korea-Japan Quality Standards for Grout Materials about PC Member assembly (PC부재 조립용 그라우트 재료 품질 기준의 한일 비교)

  • Kim, Yeon-Ho;Lee, Bum-Sik;Kim, Min-Jun;Kim, Ki-Ho;Jun, Myoung-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.127-128
    • /
    • 2023
  • Recently, OSC (off-site construction) construction has been revitalized as a response to the decline in building quality and productivity due to lack of skilled manpower at construction sites, and PC (precast concrete) construction, a representative OSC construction, is insufficiently applied to public housing.This is the situation.In addition, in the case of general contents appearing in standard specifications, the construction standards for quality assurance remain in the 1990s and do not correspond to the current construction environment.In order to improve the quality of PC member joints, we compared and analyzed Korean and Japanese specifications to establish appropriate standards for PC construction quality control, focusing on the quality of grout used in joints.

  • PDF

Improvement of Personnel Cost and Placement Scale of Quality Manager for Construction (건설공사 품질관리자의 인건비 및 배치규모 개선)

  • Lee, Chang-Hyo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.2
    • /
    • pp.327-335
    • /
    • 2018
  • In order to calculate the quality management cost of construction work, the process must conform to relevant laws and regulations. In details, the cost of the various items such as quality test fee and quality control activity cost are required to be calculated. Regarding the quality management costs, the labor cost is applied to the quality examination fee and the calculation unit quantity in the construction quality management duties. The application of the unit price of the labor cost stipulates that Construction Association of Korea and Korea Engineering & Consulting Association apply the unit price which is surveyed and published. However, in the related laws and regulations, the standard of the quality manager and quality tester is not clear. This accounts for the confusion in the cost of construction management and the cost of labor. In the current law, the allocation standard of quality control personnel is specified according to the size of the construction, but the standard of placement of quality testers is not specified. At the construction site, there is no assignment criteria manpower for quality testers except quality managers, or very little work is being done. The quality control personnel conducts the quality test work to be carried out by the quality tester, and this carrying out heavy work. Therefore, it is difficult to maintain quality control activities. In this study, the labor cost of quality management expenses and the allocation criteria of quality managers and quality testers are established and presented for the purpose of securing the quality of the construction work and preventing the construction work. It is stipulated that the standards of the relevant laws and regulations, which are not clear, should be classified into quality control personnel and quality testers according to the size of the construction. Based on the unit price of Korea Engineering & Consulting Association, the personnel expenses of quality managers and quality testers are proposed to apply the unit price of engineer (professional engineer, specialist, advanced, intermediate, beginner) and skilled technicians (advanced, intermediate, beginner).