• 제목/요약/키워드: Construction phases

검색결과 433건 처리시간 0.031초

볼류메트릭 모듈 양중 및 인양 대안에 관한 연구 (Economic Alternative for Volumetric Module Lifting/Offloading)

  • 송승호;권우빈;최진욱;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.75-76
    • /
    • 2023
  • The construction industry's lack of experience and expertise makes it difficult for projects to realize the full benefits of implementing modular construction. Such project performance-hindering elements are often labeled as modular challenges. The added requirement for the transportation of the finished volumetric module is one aspect of the 'module transportation logistics,' the under-researched modular challenge that can prevent projects from incurring maximum cost and productivity benefits. The typical module transportation phases include lifting, transporting, and offloading. From conducting a literature review, this paper aims to investigate the equipment commonly adopted to lift and offload the module and validate its economic efficiency by comparing it with the alternative lifting/offloading equipment used in the two case projects. The results showed that hydraulic jacks are an economic alternative to the crane for lifting/offloading the module. The increase in single-module projects with smaller budgets made crane usage economically undesirable, and this study suggested a viable option for a more economical alternative.

  • PDF

초등학교 건축물의 생애주기 에너지사용량 및 이산화탄소 배출량 평가 (Evaluation of Life Cycle Energy Consumption and CO2 Emission of Elementary School of Buildings)

  • 지창윤;홍태훈;정재욱
    • 한국건설관리학회논문집
    • /
    • 제17권3호
    • /
    • pp.52-60
    • /
    • 2016
  • 본 연구에서는 LCA 모델을 이용하여 8개 초등학교 건축물의 생애주기 에너지사용량 및 이산화탄소 배출량을 평가 분석하였다. 이를 위하여, 자재생산, 자재운송, 시공, 운영, 해체 폐기단계를 포함하는 건축물 생애주기에서의 에너지사용량 및 이산화탄소 배출량을 평가할 수 있는 LCA 기반의 평가모델을 정의하고, 모델을 이용하여 사례 건축물을 평가하였다. 40년의 운영기간을 가정하여 평가한 결과, 내재에너지(즉, 자재생산, 자재운송, 시공단계 에너지사용량의 합), 운영에너지, 해체 폐기에너지는 평균적으로 2,279, 11,182, 228 Mcal/m2로 산출되었다. 각 단계별 평균 이산화탄소 배출량은 604, 2,708, 60 kg-CO2/m2로 산출되었다. 평가결과는 생애주기 에너지사용량 및 이산화탄소 배출량의 약 17%가 자재생산, 자재운송, 시공단계에서 발생한다는 사실을 보여준다. 따라서 건축물의 에너지사용량 및 이산화탄소 배출량 감축 목표를 달성하기 위해서는 내재에너지 및 이산화탄소 배출량이 반드시 고려되어야 할 것이다. 게다가, 운영에너지는 지역에 따라 확연하게 구분되는 반면, 내재에너지는 지역에 따른 차이가 없는 것으로 나타났다. 따라서 운영단계의 에너지 사용량 편차를 줄이기 위해서는 지역에 따라 보다 상세하게 구분된 단열 기준이 제시되어야 할 것이다.

건축 프로젝트의 친환경성 제고를 위한 사업관리 가이드라인 구성 체계 도출 (The Guideline structure for improving sustainability in building construction projects)

  • 홍석규;김창원;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.26-27
    • /
    • 2014
  • Sustainable development has become a growing concern throughout the world. Construction industry also has participated in the efforts to minimize the environmental impacts. In Korea, the government has already established the green construction certification(G-seed) and guidelines for sustainable construction. However, domestic guidelines are focused on the design and construction phase, not on the construction project. In addition, it is difficult to find instructions due to the complex structure based on the work unit. Therefore this study aims to deduct the component structure for sustainable construction guidelines in the planning, design and construction phases by utilizing the Factor Analysis. Following the literature review, a total of 26 criteria were identified. Further, a survey was conducted to capture the perceptions on the importance of the criteria. According to the factor analysis, the criteria can be grouped into 8 factors : Environmental factors management, Management planning, Cost and Design management, Energy management, Material management, Certification and regulation management, General Management and Others.

  • PDF

모듈러 건축공사의 BIM 활용성 분석을 위한 기초연구 (Preliminary Study on the utilization of BIM in modular building construction)

  • 이명도;이찬우;임현수;김태훈;이웅균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.236-237
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that address several issues faced by the construction industry. However, the application guidelines for BIM in current modular construction projects are insufficient. This paper presents the preliminary work on the analysis of BIM utilization in a modular construction project; a five-point likert scale questionnaire was conducted to assess the necessity of BIM applications by the Necessity Index(NI) of nine categories(U1~U9) across two construction phases (onsite and offsite). The survey results indicate that applications for BIM based quantity takeoff for offsite phase(U4) as well as BIM modeling for module joint details(U8) were deemed to be the most necessary in each phase. The results of this study can be used as detailed guidelines for the integration of BIM in modular construction projects.

  • PDF

AUTOMATED HAZARD IDENTIFICATION FRAMEWORK FOR THE PROACTIVE CONSIDERATION OF CONSTRUCTION SAFETY

  • JunHyuk Kwon;Byungil Kim;SangHyun Lee;Hyoungkwan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.60-65
    • /
    • 2013
  • Introducing the concept of construction safety in the design/engineering phase can improve the efficiency and effectiveness of safety management on construction sites. In this sense, further improvements for safety can be made in the design/engineering phase through the development of (1) an automated hazard identification process that is little dependent on user knowledge, (2) an automated construction schedule generation to accommodate varying hazard information over time, and (3) a visual representation of the results that is easy to understand. In this paper, we formulate an automated hazard identification framework for construction safety by extracting hazard information from related regulations to eliminate human interventions, and by utilizing a visualization technique in order to enhance users' understanding on hazard information. First, the hazard information is automatically extracted from textual safety and health regulations (i.e., Occupational Safety Health Administration (OSHA) Standards) by using natural language processing (NLP) techniques without users' interpretations. Next, scheduling and sequencing of the construction activities are automatically generated with regard to the 3D building model. Then, the extracted hazard information is integrated into the geometry data of construction elements in the industry foundation class (IFC) building model using a conformity-checking algorithm within the open source 3D computer graphics software. Preliminary results demonstrate that this approach is advantageous in that it can be used in the design/engineering phases of construction without the manual interpretation of safety experts, facilitating the designers' and engineers' proactive consideration for improving safety management.

  • PDF

'Knowing' with AI in construction - An empirical insight

  • Ramalingham, Shobha;Mossman, Alan
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.686-693
    • /
    • 2022
  • Construction is a collaborative endeavor. The complexity in delivering construction projects successfully is impacted by the effective collaboration needs of a multitude of stakeholders throughout the project life-cycle. Technologies such as Building Information Modelling and relational project delivery approaches such as Alliancing and Integrated Project Delivery have developed to address this conundrum. However, with the onset of the pandemic, the digital economy has surged world-wide and advances in technology such as in the areas of machine learning (ML) and Artificial Intelligence (AI) have grown deep roots across specializations and domains to the point of matching its capabilities to the human mind. Several recent studies have both explored the role of AI in the construction process and highlighted its benefits. In contrast, literature in the organization studies field has highlighted the fear that tasks currently done by humans will be done by AI in future. Motivated by these insights and with the understanding that construction is a labour intensive sector where knowledge is both fragmented and predominantly tacit in nature, this paper explores the integration of AI in construction processes across project phases from planning, scheduling, execution and maintenance operations using literary evidence and experiential insights. The findings show that AI can complement human skills rather than provide a substitute for them. This preliminary study is expected to be a stepping stone for further research and implementation in practice.

  • PDF

복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석 (Application Method of Phase Division of Fast Track for Construction Project with Complex Structures)

  • 김현수;황재영;강효정;박상미;이재희;강인석
    • 대한토목학회논문집
    • /
    • 제42권1호
    • /
    • pp.95-105
    • /
    • 2022
  • 최근 공사규모의 대형화, 복잡화 등으로 토목, 건축, 기계 등의 복합공종으로 구성된 공사들은 공기절감을 위해 패스트트랙(Fast Track) 방식으로 진행되는 사례가 많으며, 패스트트랙 방식에서는 적정 단계구분이 전체 프로젝트의 공기 책정에 중요한 사안이다. 본 연구에서는 복합공종으로 구성된 건설공사가 패스트트랙으로 진행될 때 적용할 수 있는 단계구분 방식을 제시하고 있다. 이를 위해 연구에서는 토목, 건축공사로 구성된 4개의 축구전용경기장 공사를 적용 사례로 분석하여 세분화된 공정분류체계(Work Breakdown Structure, WBS)를 통해 주요 단계별 공정 구분에 의한 일정표를 분석하고, 5가지 시안을 적용하여 패스트트랙 단계구분의 적정성을 분석한다. 분석된 시안중에서 최소 공기를 갖는 시안에 대하여 패스트트랙 단계구분 및 단계별 주요 공정의 구성 모형을 제시하였다. 이러한 방법론은 패스트트랙이 적용되는 유사한 규모의 대형 복합공사에서 패스트트랙 적용 시에 적정 단계 구분과 단계별 공정 구성 체계에 활용성을 가질 수 있다.

Engineering Performance of a Rapid Hardening Hydraulic Binder with Hybrid Fiber

  • Li, Mao;Kim, Jin-Man;Choi, Sun-Mi
    • 한국건축시공학회지
    • /
    • 제16권3호
    • /
    • pp.279-288
    • /
    • 2016
  • The fundamental performance of any construction material should cover at least two phases: safety and serviceability. Safety commonly represents adequate strength, while serviceability encompasses the control of cracking and deflections at service loads. With respect to rapid hydraulic binders as a construction material, the above two phases should also be considered. Recent research on rapid cooling ladle furnace slag (RC-LFS) has drawn much attention, particularly given that it shows remarkable rapid hydraulic ability to pulverize to a fineness of $6,300cm^2/g$. This industrial byproduct could contribute to developing the sustainability of the rapidly hardening cementitious material system. This paper aims to expand upon the applicability of an RC-LFS-based binder that is composed of two parts. It also seeks to illustrate the engineering performance of an RC-LFS-based hybrid fiber-reinforced composite and to increase the strength of the RC-LFS-based composite. Each step of this experiment followed ASTM standards. The engineering performance, in both fresh state and hardening state, was tested and discussed in this paper. According to the experimental results for fresh concrete, the air content increased following the addition of polypropylene fiber. For hardened concrete, the toughness and strength improved following the addition of a hybrid fiber. The hybrid fiber mixture, which contains 0.75% of steel fiber and 0.25% of polypropylene fiber, shows even better engineering performance than other mixtures.

기부대양여 사업에 의한 군사시설 이전의 리스크 요인 도출 및 우선순위 평가 (Risk Identification and Priority Evaluation of Military Facility Relocation by Endowment and Concession Project)

  • 김국주;안성진;박영준
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.3-10
    • /
    • 2020
  • 군부대 이전사업의 소요 증가에 따라 활용되어온 기부대양여방식이 사업시행에 있어 관련제도와 법규, 사업시행자와 군 부대간의 상호이해의 부족 등의 이유로 대다수의 사업이 지연되고 있으며 개선이 요구되고 있는 상황이다. 이에 본 연구에서는 이전사업 추진 단계별 잠재적 리크스 요인 즉, 사업특성과 시행에 제약이 되는 문제를 확인하고 우선순위를 도출하여 위험요인을 분석하고자 하였다. 도출된 위험요인들 중 인허가 및 설계 단계에서의 시설기준을 초과한 요구, 사업승인 단계의 부대이전반대, 시공 및 준공단계의 시공 중 설계변경, 재산 처리단계의 기부/양여 재산에 대한 이견, 합의각서 체결단계의 시설기준의 부재가 우선적인 리스크 관리 고려대상으로 분석되었다. 본 연구는 리스크 관리의 우선순위를 제공함으로써 사업관리자가 더욱 효울적으로 사업을 추진할 있는 가이드라인을 제공할 수 있을 것으로 기대된다.

단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 - (A Development for Construction Cost Prediction Model of Site Development Project)

  • 이원용;이태식;박종현;배건
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.419-422
    • /
    • 2002
  • 현대 건설산업의 특징은 전문화, 복잡화, 대형화 등으로 다각적으로 변하고 있다. 따라서, 전통적인 공사비 관리체계로는 증가하는 건설공사의 불확실성을 감당할 수 없는 것이 현실이다. 이로 인하여 수많은 공사에서 공사비 증가현상이 발생하면서 건설사업의 성공적인 수행에 영향을 주고 있다. 따라서, 공사비 증가 현상을 방지하고, 효과적인 공사비 관리를 위해서는 정확한 견적을 통하여 관리 목표를 설정하고, 목표를 달성하기 위한 활동들이 필요하다. 본 연구에서는 효율적 공사비 관리를 위하여 기존에 사용된 공사비 모형을 분석하고, 단지조성 공사의 공사비 모형 구축에 필요한 표준 분석체계를 구축하여, 실제 단지조성 공사 사례 분석을 통하여 계획 및 설계단계에서 이용할 수 있는 공사비 모형을 제시하고자 한다.

  • PDF