• Title/Summary/Keyword: Construction management procedure

Search Result 321, Processing Time 0.03 seconds

Suggestions for Ecological Stream Restoration (생태하천 복원 방안)

  • Kim, Myungjin
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.1
    • /
    • pp.59-68
    • /
    • 2007
  • Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.

A Study on Fire Hazard Analysis and Smoke Flowing for the Semiconductor Manufacturing Process (반도체 제조공정의 연기유동에 관한 연구)

  • Han, Soo-Jin;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.1
    • /
    • pp.197-211
    • /
    • 2007
  • The power of semiconductor, Korea is continuously constructing semiconductor production line for keeping a front-runner status. however, studies and data about potential risks in semiconductor factory are still short. If fire does not initially suppressed, the fire causes a great damage. To decrease fire risk factors, in addition to fire fighting safety equipment, more important thing is how to design and construct fire protection system. The current fire protection codes about semiconductor factory come under functional law, and this law is short of consideration about particularity of factory. The existing prescriptive fire codes depending on experience compose without evident engineering verifications, thus equipments which is created by the current prescriptive fire code may bring about a variety of problems. For example, the design under the current regulation can not cope with the excessive investments, low efficiencies, and the diversifying construction designs and be applied to the quick changes of new technologies. Ergo, an optimal design for fire protection is to equip fire protection arrangements with condition and environment of production field. Manufacturing factory of semiconductors is a windowless airtight space. And for cleanliness, there exists strong flow of cooperation. Therefore, there is a need for fire safety design that meets the characteristic of a clean room. Accordingly, we are to derive smoke flow according to cooperation process within a clean room and construction plan of an optimal sensor system. In this study, in order to confirm the performance of proposed smoke-exhaust equipment and suggest efficient smoke exhaust device when there is a fire of 1MW of methane in the clean room of company H, we have implemented fire simulation using fluid dynamics computation.

Image Map Generation using the Airship Photogrammetric System (비행선촬영시스템을 이용한 영상지도 제작)

  • 유환희;제정형;김성삼
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.1
    • /
    • pp.59-67
    • /
    • 2002
  • Recently, much demand of vector data have increased rapidly such as a digital map instead of traditional a paper map and the raster data such as a high-resolution orthoimage have been used for many GIS application with the advent of industrial high-resolution satellites and development of aerial optical sensor technologies. Aerial photogrammetric technologies using an airship can offer cost-effective and high-resolution color images as well as real time images, different from conventional remote sensing measurements. Also, it can acquire images easily and its processing procedure is short and simple relatively. On the other hand, it has often been used for the production of a small-scale land use map not required high accuracy, monitoring of linear infrastructure features through mosaicking strip images and construction of GIS data. Through this study, the developed aerial photogrammetric system using the airship expects to be applied to not only producing of scale 1:5, 000 digital map but also verifying, editing, and updating the digital map which was need to be reproduced. Further more, providing the various type of video-images, it expects to use many other GIS applications such as facilities management, scenery management and construction of GIS data for Urban area.

Probability Distribution of Project Completion Times in Simulation based Scheduling (시뮬레이션 일정기법;최종공사기간의 확률 통계적 특성 추정)

  • Lee, Dong-Eun;Kim, Ryul-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.327-330
    • /
    • 2007
  • This paper verifies that the normality assumption that the simulation output data, Project Completion Times (PCTs), follow normal distribution is not always acceptable and the existing belief may lead to misleading results. A risk quantification method, which measures the effect caused by the assumption, relative to the probability distribution of PCTs is implemented as an algorithm in MATLAB. To validate the reliability of the quantification, several series of simulation experiments have been carried out to analyze a set of simulation output data which are obtained from different type of Probability Distribution Function (PDF) assigned to activities'duration in a network. The method facilitates to find the effect of PDF type and its parameters. The procedure necessary for performing the risk quantification method is described in detail along with the findings. This paper contributes to improving the reliability of simulation based scheduling method, as well as increasing the accuracy of analysis results.

  • PDF

A Study on the Current Condition of Quality Differentiation of the Apartment Unit Quality Planned by Domestic Housing Companies (국내주택업체의 단위세대 품질의 차별화 실태조사연구)

  • Cho, In-Sig;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.441-445
    • /
    • 2007
  • The mass housing supply policy of the government has resulted in the customer-centered market, and thereby the age of quality competition in the industry. In line with this trend of quality competition, therefore, this preliminary study aims to investigate the requirements of housing product planning to live up to the needs of customers in terms of quality, and thus analyze the types of quality differentiation of a housing product unit in our housing market. It turned out that many cases attempted differentiation in such ways as merely using luxurious finishing materials and instantly popular environment-friendly materials, and combining partial and limited household items with architectural elements of the facility system. The result of this study shows that the differentiation plan of housing product should be customer-centered, and therefore, focus on quality differentiation through organic combination of architecture-oriented plane and interior elements with technology-oriented facility and product elements. Hereby, in the future, housing product planning should include sustainable differentiation plans with reconsideration of concepts that customers have, and the needed procedure.

  • PDF

A Study of the Machine Vision Algorithm for Quality Control of Concrete Surface Grinding Equipment (콘크리트 표면절삭 장비의 품질관리를 위한 머신비전 알고리즘 개발)

  • Kim, Jeong-Hwan;Seo, Jong-Won;Song, Soon-Ho;Lee, Won-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.983-986
    • /
    • 2007
  • Concrete surface grinding is required for flatness and adhesiveness of concrete surface. The procedure is, however, labor intensive and has a hazardous work condition. Also, the productivity and the quality of concrete surface grinding depend on the levels of worker. Thus, the development of remote controlled concrete surface grinding equipment is necessary to prevent the environmental pollution and to protect the workers from hazardous work condition. However, it is difficult to evaluate the grinded surface objectively in a remote controlled system. The machine vision system developed in this study takes the images of grinded surface with the network camera for image processing. Then, by representing the quality test results to the graphic MMI program of the remote control station, the quality control system is constructed. The machine vision algorithm means the image processing algorithm of grinded concrete surface and this paper presents the objective quality control standard of grinded concrete surface through the application of the suggested algorithm.

  • PDF

Economic Assessment of Climate Change Adaptation Technologies in Infrastructure Sector (사회기반시설물 기후변화 적응기술의 경제성분석)

  • Jeong, Hoyoung;Kim, Hyoungkwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.44-52
    • /
    • 2019
  • The frequency and severity of damage caused by extreme climate events are increasing due to climate change. If the infrastructure is not prepared for the risks of climate change, property loss may occur in the facility itself and its surrounding areas. Therefore, climate change adaptation technology should be introduced to reduce future losses. Policy makers need to understand the economic impacts of each technology in order to select an appropriate option. Both the primary damage, which is the direct damage to the facility, and the secondary damage, which is the damage to the surrounding area due to climate change, should all be identified for understanding the economic impact from adaptation. This paper presents a procedure for deriving primary and secondary damage reductions from introducing adaptation technologies and suggests a methodology for evaluating adaptation technology specific to each infrastructure.

The Study of Designer's Approaching Procedure by Applying Value Evaluation Method to improve Degree of Owner's Satisfactions in Design Phase (설계단계에서 건축주 만족도 증진을 위해 가치평가방법을 활용한 설계자 접근절차에 대한 연구)

  • Lee, Do-Hyung;Park, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.117-122
    • /
    • 2006
  • In spite of various approaching method to satisfy with the owner's requirements in schematic design phase, it is insufficient to evaluate intermediate process of design arithmetically with participating in design process. So the numerous changes of design after completion of design development cause a lot of loss to the design company. The designer arranges owner's requirements to prevent from this loss at the initial stage of schematic design phase systematically and lets owner and stakeholder to evaluate the value of schematic design to satisfy with owner's and stakeholder's requirements. If the evaluated value for schematic design is above a definite value index, the next design phase should be advanced. By this method, the design company can reduce the additional expenses remarkably by preventing with re-design which is occurred by not reflecting owner's intention or by changing owner's intention. Also the designer have the owner to evaluate the result of design and construction. The designer let the owner know whether the owner's requirement should well have been reflected on drawing or not. There is a strong point to be able to minimize the criticism which can be occurred after completion of construction by evaluating for owner's satisfactory degree and by having owner and designer confirm the result of design and construction arithmetically. This paper presents that the loss of design company can be minimized by going over at next step if the value is over a definite value index after evaluating value for each design from design process.

  • PDF

Consistency Analysis between Predicted and Measured PM10 and NO2 Air Quality During Environmental Impact Assessment of Linear Construction Projects (선형사업에 대한 환경영향평가 시 대기질 예측치와 실측치의 정합성 분석 - PM10과 NO2를 중심으로 -)

  • No Ol, Lim;Hyun Chan, Sung;Sun Jeong, Kim;Ji Young, Kim;Seong Woo, Jeon
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.378-387
    • /
    • 2022
  • Since air pollution has become a global issue to be managed, the Republic of Korea (ROC) is protecting air quality by predicting the air condition before a construction project starts through EnvironmentalImpact Assessment (EIA) and measuring the air condition afterwards the construction project ends through Post-environmental Impact Assessment (PEIA). The aim of this study consists on verifying the predicted and measured concentration data and analyzing their consistency in order to deduce improvement directions. Linear EIA projects which the investigation during operation period have been concluded between years 2017 and 2019 were used. As a result, the following improvement directions were suggested: reduction of EIA air quality standards, strengthen the management of projects with construction duration longer than 5 years, incorporation of first or second quarter (winter or spring) into the investigation period, consideration of construction equipment or conditions for better prediction. The strength of this study is that we arranged and utilized EIA predicted and PEIA measured data to understand the present EIA procedure and made meaningful suggestions through the consistency analysis contributing to air quality maintenance and investigation methodology enhancement.

A study on the Construction of the System Integration Management System for Civil Affairs (민원업무통합관리 시스템의 구축방안연구)

  • Yi, Sung-Ki;Rhew, Sung-Yul;Lee, Kyu-Won
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.8
    • /
    • pp.107-116
    • /
    • 2009
  • To establish efficient e-government and to improve the quality of public services, online public services are in operation in every administrative organization. However, due to the lack of analysis and connection between each government organization, the satisfaction of the civil users has not been improved very much. This research presents the core components of Integrated Management Model for Public Services, which can minimize the time for processing public services and the expenses for administrative procedure, based on the example of N Ministry. For this purpose, it analyzes current process of the public services to find out underlying problems, deduces requirements for improvement, presents and implements the design principles of Integrated Management System for Public Services. The efficiency of this Integrated Management System was proven with the analysis from the viewpoints of civil users, internal service representatives, and their managers.