• Title/Summary/Keyword: Construction machinery for road construction

Search Result 30, Processing Time 0.024 seconds

Study on the Prevention of Traffic Accidents of Construction Machinery (건설기계 교통사고 예방 대책 연구)

  • Hyo seung Han;Ilsoo Yun
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.6
    • /
    • pp.165-176
    • /
    • 2022
  • In order to prevent various accidents with construction machinery, Korea enacted the Construction Machinery Management Act to enhance safety. Until now, there has been a lack of systematic research related to traffic accidents with construction machinery. Therefore, domestic and foreign systems related to construction machinery were reviewed, and the current status was analyzed based on traffic accident data over the past 5 years to derive implications. It is necessary to ensure the safety of construction machinery by correcting institutional loopholes and preparing follow-up measures. In addition, it is necessary to create a separate traffic-safety education program for construction machinery operators to create an environment that can comply with safe road-driving methods and traffic laws.

A Study on the Development of Technology Roadmap for Construction Automation (건설기계 자동화를 위한 기술 로드맵 개발에 관한 연구)

  • Kim, Young-Suk;Seo, Jong-Won;Lee, Junbok;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.493-504
    • /
    • 2008
  • Considerable effort has been made to improve construction processes through mechanization and robotization of current work. In this paper, the trend of research and development related to the construction machinery automation to improve the construction productivity has been reviewed. A classification system is proposed for automation of architectural and civil works. Then, the priority among the classified construction tasks for automation has been identified through the questionnaire study. Based on the priority for automation a comprehensive technology road map was also developed. The technology road map suggests the time frame to complete R&D work for the selected construction tasks and the core technology required for automation of the selected tasks. Such automation R&D road map for construction machinery can be utilized as a milestone in setting up the R&D strategy in the construction industry.

Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan (스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 -)

  • Song, Tae-Seok;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

A Study on Calculation of Air Pollutants Emission Factors for Construction Equipment (건설기게의 대기오염물질 배출계수 산정을 위한 연구)

  • lim, Jae-Hyun;Jung, Sung-Woon;Lee, Tae-Woo;Kim, Jong-Choon;Seo, Chung-Youl;Ryu, Jung-Ho;Hwang, Jin-Woo;Kim, Sun-Moon;Eom, Dong-Sup
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.25 no.3
    • /
    • pp.188-195
    • /
    • 2009
  • Generally. mobile sources of air pollution were classified in on-road and non-road. Due to increased registration number of construction equipment in Korea. updated emission factors for non-road mobile sources, such as construction machinery. should be developed. NONROAD model of U.S. EPA already has introduced transient adjustment factors and sulfur adjustment factors for emission factors of diesel powered engine. In addition to this. European Environment Agency (EEA) has proposed emission factors for off-road machinery including several types of construction equipment. In this study. six types of construction equipment, such as excavator. forklift, loader, crane, roller and bulldozer, were studied to estimate emission factors based on total registration status in Korea. Total 445 construction equipments between 2004 and 2007 model year were tested with KC1-8 mode and air pollutants (CO, THC, $NO_x$, and PM) were measured. After statistical estimation and calculation, emission factors for CO, THC, $NO_x$, and PM for excavator, forklift, loader, crane, roller and bulldozer were provided and compared with previous emission factors. Moreover, updated emission factors for six types of construction equipment in this study were verified after comparison with emission factors of U.S. EPA. Finally, estimated emission amounts of four air pollutants were suggested according to six types of construction equipment.

Development of a Double-blades Road Cutter with Automatic Cutting and Load Sensing Control Technology (자동 절단과 부하 감응 제어 기술을 적용한 양날 도로절단기 개발)

  • Myoung Kook Seo;Myeong Cheol Kang;Jong Ho Park;Young Jin Kim
    • Journal of Drive and Control
    • /
    • v.21 no.1
    • /
    • pp.53-58
    • /
    • 2024
  • With the recent development of intelligence and automation technologies for construction machinery, the demand for safety and efficiency of road-cutting operations has continued to increase. In response to this, a double-blade road cutter has been developed that can automatically cut roads. However, a double-blade road cutter has a load difference between the two blades due to the ground and wear conditions of the cutting blades. The difference in load between the two blades distorts the direction of travel of the cutter. In this study, a vision sensor-based driving guide technology was developed to correct the driving path of road cutters. In addition, we developed a load-sensing technology that detects blade loads in real-time and controls driving speed in the event of overload.

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Estimation of Rock Drilling Work Size for Mountain Forest Road Construction (산악지(山岳地) 임도시설(林道施設)을 위한 암석천공(岩石穿孔) 작업량(作業量)의 예측(豫測))

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.3
    • /
    • pp.193-199
    • /
    • 1987
  • Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results it's work size can bef estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantify can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region.

  • PDF

A Study on the Introduction and Application of Core Technologies of Smart Motor-Graders for Automated Road Construction (도로 시공 자동화를 위한 스마트 모터 그레이더의 구성 기술 소개 및 적용에 관한 연구)

  • Park, Hyune-Jun;Lee, Sang-Min;Song, Chang-Heon;Cho, Jung-Woo;Oh, Joo-Young
    • Tunnel and Underground Space
    • /
    • v.32 no.5
    • /
    • pp.298-311
    • /
    • 2022
  • Some problems, such as aging workers, a decreased population due to a low birth rate, and shortage of skilled workers, are rising in construction sites. Therefore research for smart construction technology that can be improved for productivity, safety, and quality has been recently developed with government support by replacing traditional construction technology with advanced digital technology. In particular, the motor grader that mainly performs road surface flattening is a construction machine that requires the application of automation technology for repetitive construction. It is predicted that the construction period will be shortened if the construction automation technology such as trajectory tracking, automation work, and remote control technology is applied. In this study, we introduce the hardware and software architecture of the smart motor grader to apply unmanned and automation technology and then analyze the traditional earthwork method of the motor grader. We suggested the application plans for the path pattern and blade control method of the smart motor grader based on this. In addition, we verified the performance of waypoint-based path-following depending on scenarios and the blade control's performance through tests.

Estimation of Greenhouse Gas Emission from Off-road Transportation (비도로 수송에 의한 온실 가스 배출량 추정)

  • Choi, Min ae;Kim, Jeong;Lee, Ho Jin;Jang, Young Kee
    • Journal of Climate Change Research
    • /
    • v.1 no.3
    • /
    • pp.211-217
    • /
    • 2010
  • Off-road transportation sector including construction equipment, ground support equipment in airport, cargo handling equipment and agroforestry machinery have not calculated as emission source classification in 1A3e2. In this study, the statistics of oil consumption for construction, aviation, shipping and agroforestry are separated for this sector by oil type. And the greenhouse gas emission by off-road transportation emission factor in 1996 & 2006 IPCC Guidelines are calculated and compared with each other. As a result, the nationwide $CO_2$ equivalent emission from off-road transportations by the emission factor of 1996 & 2006 IPCC Guidelines are calculated as 4,919 kton/yr and 5,530 kton/yr in 2007. The contribution ratio of off-road transportation emission by this study is estimated as 5.5% to the subtotal emission from on-road transport sector.

One Dimensional Analysis of Hydrostatic Power Steering Unit Composed of Two Gerotors (두 개의 지로터로 구성된 전유압 파워스티어링 장치의 1차원 해석)

  • Kim, Kap Tae;Ryu, Beom Sahng;Kim, Kyung Sik;Jeong, Hwang Hun
    • Journal of Drive and Control
    • /
    • v.17 no.4
    • /
    • pp.113-124
    • /
    • 2020
  • Most of the work of construction equipment and agricultural machinery is done in off-road conditions. Autonomous driving required in these conditions uses GPS sensors, and PID controllers to control their speed and position. The hydrostatic steering, which is composed of a PSU, hydraulic hoses, and cylinders, rather than a mechanical coupling is used in these equipments. The PSU plays a key role in hydrostatic steering. Precise control of the position under various conditions requires detailed behavioral analysis of the basic components and operation. Two Gerotor PSU is now a commonly used safer option. The components of the PSU can be divided into mechanical and hydraulic actuating elements by its behavior. Since the system is combined by mechanical and hydraulic elements, the modelings are performed using Amesim, which is one of the most effective for the multi-domain dynamic system analysis. To confirm the validity of the model, input torque and pressures are checked with varying steering speed. The opening and the steering speed of normal and newly designed control valve set is investigated with the effect of centering spring force and friction. Finally, simulation results with fully detailed model with two gerotors are analyzed and compared with simple model.