• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.033 seconds

A Study on the Characteristic of Electrical Construction Work for Prevention of Electric Shock Accident (감전재해 예방을 위한 전기공사업의 특성에 관한 연구)

  • Choi, Sang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.29-34
    • /
    • 2014
  • The live line working is inherently dangerous as the workers have to work under the risk of electrical shock and most of works are carried out at height. The live line working need the some specific techniques and higher level safety measures such as a risk assessment to carry out works safely, but the electrical construction companies performed live-line working are usually small-sized companies. They have less capacity to have own safety management system. This study intended to conduct an in-depth analysis on the cause of electric shock accidents to provide basic data for policy proposing taking into considering the past eleven years for a long-term plan. And the aim of this study is to propose the policy about the equipment performance standards and/or worker's safety standards to revise the standards for preventing electric shock accidents, moreover, co-relation of the electrical work order form and on safety workings, especially electrical construction company/work.

A Progress-based Expert System for Quantitative Assessments of Project Delay

  • Yoo, Wi Sung
    • Architectural research
    • /
    • v.10 no.1
    • /
    • pp.41-48
    • /
    • 2008
  • Construction projects have frequently exceeded their schedule despite reliable estimates at the start of a project. This problem was attributed to unpredictable causes at the beginning and to shortage of proper tools to accurately predict project completion date. To supplement this difficulty, project managers need a comprehensive system that can be employed to monitor the progress of an ongoing project and to evaluate potential delay for achieving the goal on time. This paper proposed a progressive-based expert system for quantitative assessments of project delay at the early stages of the execution. Furthermore, the system is used to inspect the change of the uncertainty on completion date and its magnitude. The proposed expert system is helpful for furnishing project managers a warning signal as a project is going behind schedule and for tracking the changed uncertainty at a desired confidence level. The main objectives of this paper are to offer a new system to overcome the difficulties of conventional forecasting tools and to apply a construction project into the system to illustrate its effectiveness. This paper focuses on construction phase of project development and is intended for the use by project managers.

The Effect of Dictation and Dramatization on Children's Story Construction and Decontextualized Language (유아의 이야기 짓기와 극화 활동의 연계가 유아의 이야기 구조 및 탈상황적 언어 발달에 미치는 영향)

  • Lee, Moom-jung
    • Korean Journal of Child Studies
    • /
    • v.22 no.1
    • /
    • pp.241-249
    • /
    • 2001
  • This study examined the effect of story dictation and dramatization on children's story construction and decontextualized language. For 12 weeks, the 22 five-year-old children in the experimental group participated in story dictation and dramatization activities while another 22 same-age children participated only in story dictation. The instruments were the children's Decontextualized Language Test(Foley, 1992) and children's Story Analysis(Knipping, 1987), revised to fit Korean grammar. Story dictation and dramatization facilitated high level story construction by children: it raised levels of story coherence and narrative form. Story dictation and dramatization also enhanced decontextualized language of children, raising their use of decontextualized language on a picture description task.

  • PDF

The Evolution of Seismic Engineering and Design of Ultra Tall Buildings in China Innovations and Sustainability

  • Wang, Aaron J.
    • International Journal of High-Rise Buildings
    • /
    • v.5 no.3
    • /
    • pp.221-232
    • /
    • 2016
  • With the booming of construction and property industries in China, the demand for high-rises and mega-scale buildings with more integrated building functions, open- and tailor-shaped outlooks, better connections to municipal infrastructures, and higher grades of building importance has been increasing in the past two decades. The seismic design and engineering of such modern mega-buildings face engineering challenges such as hazard mitigation of extreme actions and surroundings, integrated structural frameworks and building skins, complex connections, and overall construction efficiency. It is the work of a new generation of civil and structural engineers to enhance engineering efficiency and achieve overall engineering, environmental, and economical effectiveness for these high-rise projects. This paper elaborates the above topics through case studies on the design and construction of four such developments in China. Some rethinking is conducted on evolution in modern seismic engineering and design through innovation to achieve an acceptable level of overall sustainability and building effectiveness.

Noise Management Process for Big Scale Concrete Pouring in Urban Area (도심지 대규모 콘크리트 타설시 소음관리 사례)

  • An, Jang-Ho;Lee, Joo-Ho;Lee, Jun-Seo;Kim, Il-Min
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2012.04a
    • /
    • pp.787-790
    • /
    • 2012
  • In downtown, construction noise related claims are the most important issues. Sometimes noise related claims halt the construction process. Therefore, Introduction of noise reduction measures is common to construction process with a loud noise. This case is about concrete pouring for mat foundation of super tall building. Concrete pouring process using High Pressure Pumping machine causes high noise level in the vicinity of area. And large number of transit-mixer truck cause traffic congestion. This paper introduces effort and process to prevention of construction noise claims on massive scale concrete pouring.

  • PDF

Experimental and Analytical Study on the Flow Noise Reduction of Construction Equipment (건설장비의 유동 소음 저감을 위한 해석 및 실험적 연구)

  • Kim, Hyung-Taek;Joo, Won-Ho;Bae, Jong-Gug
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2010.05a
    • /
    • pp.242-243
    • /
    • 2010
  • The cooling system, including a fan is a one of the major sources to generate the radiated noise of construction equipment. Therefore, it is required to reduce the flow noise induced by a fan in order to reduce the noise level. In this study, we made an engine room model to carry out a variety of experiments. And then, the flow noise analysis technique using the CFD code was applied to the cooling system of construction equipment. These analyses results agree well with the measurement results. These results make it possible to understand the flow noise characteristics and to design the low noise cooling system in the design stage.

  • PDF

Comparative Review on Term of Warranty Liability of Reinforced Concrete Work through Occurred Defect Data Analysis in Apartment Building (공동주택 하자실적자료 분석을 통한 철근콘크리트 공사의 하자담보책임기간 비교연구)

  • Seo, Deok-Seok;Park, Jun-Mo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.266-267
    • /
    • 2017
  • As apartment buildings defect lawsuits become socioeconomic problems, an objective basis system for the term of warranty liability of reinforced concrete constructions is urgent. This study was carried out as a basic study for developing a basis system for the term of warranty liability. To do this, defect data actual collected in apartment complexes were collected and analyzed. As the result of checking the cumulative rate of defect occurrence in reinforced concrete construction by year, the point of time of reaching the 90% level was the 5th years, which was similar with the provision of the Apartment Building Management Act. However, the current Supreme Court precedent has decided that the term of warranty liability for the main structural parts in reinforced concrete construction shall be 10 years and the dispute is expected to continue in the future in the defect lawsuit.

  • PDF

Development of Automatic Fault Tree Construction System using Digraph (Digraph를 이용한 Fault Tree 자동합성시스템의 개발)

  • Jung, Won-Seok;Lee, Geun-Won;Moon, Il
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2000.10a
    • /
    • pp.393-393
    • /
    • 2000
  • FTA(Fault Tree Analysis) is a safety analysis method that focuses on one particular accident or main system failure and provides a method of determining causes of that event. While most of the statistical and cut set analysis have been automated, actual construction of the fault-tree is usually done manually. Manual construction of the fault-tree is extremely time consuming and it requires high level of expertise and experience. In addition to the time involved, different analyst often produces different fault-trees either by incorrect logic or omission of certain events. Automatic fault-tree construction system can be efficient in solving above problems. This study presents a new Digraph-FT conversion algorithm that leads automatic FTA system.

  • PDF

A Fundamental Study on the Performance Predition of Recycled Aggregate Concrete (재생골재 콘크리트의 성능 예측에 관한 기초적 연구)

  • Choi Maeng-Ki;Park Hee-Gon;Park Sun-Gil;Lee Jae-Sam;Lee Young-Do;Jung Sang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.93-96
    • /
    • 2006
  • As the importance of recycled materials is being emphasized more in the Korean construction market, the production quality has been improved to a significantly high level. Compared to the high quality, however, there are used very limitedly. Among recycled construction materials, recycled aggregates produced through the retreatment of waste concrete are drawing attention because of lack of natural aggregate and heightened consciousness of resource saving and environmental protection and, as a consequence, they are close to natural aggregates in terms of production technology and quality. Despite the high quality and productivity, however, the utilization of recycled aggregates is very low.

  • PDF

A Study on the Promotion Plan of Recycled Concrete (폐콘크리트의 활용 촉진 방안)

  • Cho Young-Jun;Park Dae-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.21-24
    • /
    • 2005
  • A by-product of construction can be easily reused through properly treatment. On the contrary, the level of technique to reuse the by-product is not so high. Especially, the bulky of trash concrete is huge. The demand and treatment cost of them is on the increase. So, the riffle effect of the recycle of the trash concrete cannot be bypassed. But the research on the recycle of them is few. Therefore, the reuse of recycled concrete, the treatment of them, and the promotion plan of them were suggested in this study

  • PDF