• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.032 seconds

INTEGRATION OF CONSTRUCTION TECHNIQUES FOR SPECIAL ISOLATION WARDS OF HOSPITAL BUILDINGS

  • Chi-Su Tai ;Sy-Jye Guo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.627-632
    • /
    • 2005
  • The severe acute respiratory syndrome -SARS virus spreaded rapidly in Asia in 2003 caused a lethal and serious epidemic. Establishing special isolation wards of high-level epidemic prevention has becomes one of the most important tasks of epidemic prevention. Taking the biosafety level of US CDC biology laboratory as an example, the laboratory of the highest level, BL4 and that of the second high level, BL3 are only allowed to handle and research this kind of highly dangerous viruses safely, to ensure the safety of researchers and the surrounding environment.This research aims to study the functions and the design requirements of "special isolation wards", which is equivalent to the high-level biotechnology laboratory, and have an integrated discussion about the design and construction techniques of this kind of wards, expecting to provide a reference for constructing special isolation wards and maintaining operation safely in Taiwan.

  • PDF

A Study on the Cost Impact of Additional Construction as Rating G-SEED Certification of Medium-Sized Office Buildings in Korea - Based on G-SEED 2016-2(Effective September 1, 2018) - (국내 중규모 업무용 건물의 녹색건축인증 등급별 추가공사 비용 영향에 관한 연구 - G-SEED 2016-2 기준으로(2018년 9월 1일 시행) -)

  • Lee, Du-Hwan;Kim, Jae-Moon
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.10
    • /
    • pp.225-234
    • /
    • 2019
  • The purpose of this paper is to analyze the additional construction cost of G-SEED certification for domestic office building reflecting the latest standard(G-SEED 2016-2), and to derive cost impact by category and level. Therefore, it is intended to provide quantitave cost data according to G-SEED certification at the planning phase of the project, estimate the additional construction cost per level according to G-SEED Certification of similar project to be carried out in the future, and encourage G-SEED certification by supporting the decision of the owners. Method: The Process and method of this study are summarized in five steps, 1) Review of previous research, 2) Selection of target project, 3) Scenario setting by level, 4) Additional construction cost for each evaluation category, 5) Extraction of additional construction cost ratio by level. Result: This paper analyzed the cost impact by deriving the additional construction cost of detailed category for level improvement according to the revised G-SEED certification(G-SEED 2016-2). In conclusion, an additional construction cost(ratio) of G-SEED projects to the reference building is drawn as good level; 157,426,241 KWN(+0.43%), very good level; 321,907,802 KWN(+0.88%), excellent level; 999,371,478 KWN(+2.74%), and outstanding level; 1,467,047,718 KWN(+4.02%).

APPLICATION OF AHP IN IDENTIFYING CONSTRUCTION PRODUCTIVITY FACTORS

  • Ishwar Adhikari;Soo-Yong Kim;Young Dai Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.667-671
    • /
    • 2005
  • Analytical hierarchy process (AHP) is a potential decision making method in management that can be used in project management as well. Lack of productivity is perhaps the number one problem confronting in the construction industry. There are numerous factors which affect the productivity of a construction project, so it is necessary to find out the critical factors giving birth to productivity. In this paper, construction productivity is taken as example for the demonstration of the AHP application to find out the critical productivity factor in which the Level 1 is taken as selection of critical productivity factor, Level 2 as construction parties and Level 3 as productivity factors group. The outcome of this study is beneficial to the entire constructional professionals for applying the AHP.

  • PDF

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

The Research on Informatization Level Evaluation Model in Construction Company (건설 정보화 수준 평가모형 연구)

  • Chang, Hang-Bae;Kang, Hee-Jo
    • Journal of Advanced Navigation Technology
    • /
    • v.12 no.2
    • /
    • pp.170-179
    • /
    • 2008
  • This study designed model that could scientifically and objectively evaluate a level of informatization of construction companies in consideration of informatization characteristics and limitations identified in researches related to the evaluation of informatization level of construction companies, so at to create the e-business environment for the construction companies including the enhancement of informatization consciousness and to improve capacity to carry out informatization. To do this, the study defined requirements to develop new model of construction informatization level and the characteristics of construction companies, and developed components of informatization level model and measuring methods that could meet the requirements based on theories and literature. The developed informatization level model were reviewed for validity and reliability through statistical method by carrying out the questionnaire survey on 200 companies along with an advisory group of experts. As the result of this study, we could suggest the directions for informatization to narrow the gap between the current level of informatization and the managerial goals in construction company.

  • PDF

How Much Discrepancy Can Happen from BIM-based Quantity Take?

  • Kim, Seong-Ah;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.263-267
    • /
    • 2015
  • Stakeholders of a construction project expect cost savings through fast and accurate cost analysis by performing BIM-based quantity take-off (BQT). However, authors have observed that there can be discrepancies in the results of BQT depending on the level of development (LOD) and modeling methods. In addition, since quantity take-off methods are different depending on the construction work items, the combination of LOD, modeling methods of BIM, features of construction work items can cause serious overestimate or underestimate in BQT results. It is necessary to identify what kind of problems can happen and how those problems can be avoided in various construction work items, since the discrepancy of quantity take-off results has great impact on not only cost analysis but also the determination of contract amount and it can cause claims, poor construction quality, cost overruns, and many others later in the construction project. Therefore, this paper focuses the identification of issues and problems of BQT at each construction work item level based on two categorizations of structural works and interior works.

  • PDF

A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects (건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구)

  • An, Sung-Hoon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.53-59
    • /
    • 2008
  • Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

Comparison Analysis on the Informatization Level between Construction CALS and Other Sectors (건설CALS의 정보화수준과 타 부문의 비교분석)

  • Jung, In-Su;Kim, Nam-Gon;Kim, Jin-Uk;Lee, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.26-37
    • /
    • 2009
  • Ministry of Land, Transportation and Marine Affairs(MLTM) has implemented Construction CALS project for improving productivity of construction industry and for making construction project management efficient by responding to informatization and knowledge base society in 21st century. CALS has beeb applied successfully to projects form MLTM, however, the outcomes of Construction CALS hasn't been recognized. In addition, there is no way to find how high the level of Construction CALS is when it is compared with other SOC informatization projects. This study found out the informatiziation level of Construction CALS by using the evaluation index proposed in the former study, and by comparing with other sectors. The evaluation on the level was implemented in the three parts such as informatization infrastructure(network, hardware, standardization, data, informatization, informatization security), informatization utilization(information usage, IT performance), and informatization support(informatization goal, organization of informatization, informatization investment, informatization education), and then, this evaluation was compared with "Assessment for level of industry information system", "Assessment for level of small and midium sized industry information system", and "IICI(Informatizaion Index for the Construction Industry)". With the result from the comparison, this study produced superior factors and inferior factors for each sector. These results are expected to be useful for prioritizing budget allocation by finding out the informatization level of Construction CALS.

Cutting-edge Technologies to Achieve a Higher Level of Modular Construction - Literature Review

  • Lee, Seungtaek;Choi, Jin Ouk;Song, Seung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.536-542
    • /
    • 2022
  • Cost overruns, schedule delays, and a shortage of skilled labor are common problems the construction industry is currently experiencing. Modularization and standardization strategies have the potential to resolve the various problems mentioned above and have been applied for various construction applications for a long time. However, the level of modularization remains low, and modular construction projects have not been getting the full benefits. Thus, this review investigated the cutting-edge technologies currently being utilized to develop the modular construction field. For this paper, qualified research papers were identified using predetermined keywords from previous related research papers. Identified literature was then filtered and analyzed. According to the included reviews, several technologies are being developed for modular construction. For example, automated design and monitoring systems for modularization were developed. In addition, research labs are utilizing robotic arms for modular construction to achieve a high level of completion in the construction industry, as is seen in the manufacturing industry. Despite these efforts, more research and development are necessary because some automation technologies still require manual activities. Thus, there is great potential for further development of modularization techniques, and further research is recommended to achieve high levels of modularization.

  • PDF

Analysis of Construction Contractors' Profit Level (건설기업의 이익률 실태 및 특징 분석에 관한 연구)

  • Kim, Han-Soo;Lee, Hyun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.167-175
    • /
    • 2008
  • An objective of companies' existence is to make profits and grow steadily. Judging what is reasonable or excessive profit for an industry or a company by a profit figure is practically impossible because it is a matter of value judgement not just fact judgement. But recently construction companies' profit level is under severe argument. The objective of this study is to investigate the level of construction companies' profit level and compare it with other industries in order to identify facts and characteristics in relation to construction companies's profit level.