• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.032 seconds

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Analysis on Quality Defect Status in the Construction Site of Domestic Educational Facilities (국내교육시설건설공사 현장에서의 품질하자 현황분석)

  • Ryoo, Chong-Hyuck;Park, Young-Ki
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.1
    • /
    • pp.44-52
    • /
    • 2008
  • Amid the rapidly changing constructional business conditions, the volume of BTL business sectors has expanded largely during two or three years. Especially, construction works fur educational facilities of elementary, middle and high schools has been performed by the mid-sized construction companies who are not capable of doing effective and systematic quality management while the requirements of the customers are getting higher and higher. In order to have a flexible deal with the rapidly changing business conditions and also to enhance the quality level, it is the high time to reorganize the effective quality management systeme by doing the overall analysis about the quality defects in construction site. Accordingly through the investigation about the quality defects in the construction sites of domestic educational facilities, this study will focus on what kind of quality defects show. It is aimed at providing the preliminary data for the establishment of quality management fur the construction site of the domestic educational facilities by analysing the investigation results.

A Study on the Characteristics of Propagation and Attenuation of Piling Noise by SIP Method with Casing (Casing 부착 SIP공법에 의해 발생하는 항타소음의 전달 및 감쇠특성에 관한 연구)

  • 이병윤;윤해동;조원희;김재수
    • Journal of KSNVE
    • /
    • v.9 no.5
    • /
    • pp.899-905
    • /
    • 1999
  • Construction equipment noise has caused much annoyance for a number of dwellers in nearby construction field and has become a very serious issure in our living environment. Therefore, in our country, a practical solution and a better method of reducing construction equipment noise are highly required in construction field. Practical solutions for the construction equipment noise, however, are very difficult because of the poorness of basic data and insufficiency of the existing research. Especially, in order to establish the sound insulation plan about pilling works noise with high sound pressure level and impactive, a real situation of sound characteristics about the noise of pilling works in foundation work demands more detail investigation. In this point, this study attempts to survey the characteristics of attenuation and propagation of construction equipment noise in pilling work using SIP(soil-cement injected precast pile) method with casing. And this study intends to get the basic data for establishment of a standard about construction noise.

  • PDF

Process Analysis & Evaluation for Steel Frame Fabrication Automation (철골조립공사 자동화를 위한 프로세스 분석 및 평가)

  • Kim, Baek-Joong;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.155-158
    • /
    • 2007
  • The construction industry kept lower level of the technology and productivity improvement than any other kinds of industry. But in most analysis of previous construction work which promoted the productivity of construction, the analysis process has only developed by the economical efficiency or the time studies through work sampling in construction field, So We suggest motion analysis as a tool to solve these problems. Spacially, this study find out productivity improvement method of steel frame fabrication works with using motion analysis. If the result of this study were to be applied to the actual construction field, it will be of great help for Building Construction Automation.

  • PDF

An Experimental Study on the Characteristics of Attenuation and Propagation of Construction Equipment Noise in Piling Work by SIP Method. (SIP공법에 의한 항타작업시 발생하는 건설기계소음의 전달 및 감쇠특성에 관한 실험적 연구)

  • 김재수;이병윤;박재영;곽광수;윤해동;장용채
    • Journal of the Korean housing association
    • /
    • v.9 no.2
    • /
    • pp.67-78
    • /
    • 1998
  • Construction equipment noise has caused much annoyance for a number of dwellers in nearby construction field and it has become a very serious issue in our living environment. Therefore, in our country, a practical solution and a better method of reducing construction equipment noise are highly required in construction field. Practical solutions for the construction equipment noise, however, are very difficult to obtain, because of the lack of basic data and insufficient research works. Especially, in order to establish a successful sound isolation plan for piling work noise, which has high sound pressure level, the characteristics of the impact noise should be closely monitored and analyzed. This study attempts to survey the characteristics of attenuation and propagation of construction equipment noise in piling work by SIP(soilcement injected precast pile) method. In addition, this study intends to get the basic data to establish a standard about construction noise.

  • PDF

Transformational Leadership and its impact on Lean Implementation

  • Kim, Yong-Woo;Hochstatter, Kirk
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.1
    • /
    • pp.20-25
    • /
    • 2016
  • With the multitude of variables that may play a role in a company's Lean journey, it is becoming more understood that leadership plays a significant role in implementing lean principles on construction projects. The goal of this research is to investigate the relationship between leadership and Lean Construction implementation. The research uses a quantitative research in which a survey was conducted, followed by a statistical analysis to test the hypothesis. Through the statistical analysis of survey data, the research finds that there is positive relation between the level of transformational leadership and the effectiveness of lean implementation. When an organization is implementing organizational change like Lean, traits of leaders must not be underestimated. The study findings may contribute to the knowledge of lean construction leadership by bridging the gap between leadership and the effectiveness of lean implementation.

An Experimental Study on the Characteristics of Attenuation and Propagation of Pilings Noise by SIP Method in Construction Field (SIP공법에 의한 항타소음의 전달 및 감쇠특성에 관한 실험적 연구)

  • 이병윤;김병주;박재영;김재수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.227-236
    • /
    • 1997
  • Construction equipment noise has caused much annoyance for a number of dwellers in nearby construction field and has become a very serious issue in our living environment. Therefore, in our country, a practical solution and a better method of reducing construction equipment noise are highly required in construction field. Practical solutions for the construction equipment noise, however, are very difficult because the poorness of basic data and insufficiency of the existing research. Especially, in order to establishment of sound insulation plan about pilings work noise that has highly sound pressure level and impactive, a real situation of sound characteristics about pilings work noise in foundation work demands close investigation. In this point, this study attempts to surveys the characteristics of attenuation and propagation of construction equipment noise in pilings work using SIP(soilcement injected precast pile) method. And this study intends to get the basic data for establishment of a standard about construction noise.

  • PDF