• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.028 seconds

Comparison Analysis for the Safety Climate Level of Construction Company According to Business Size in South Korea (국내 건설기업의 규모별 안전분위기 인식 수준 비교 연구)

  • Son, Seung-Hyun;Ha, Sun-Geun;Choi, Sang-Cheol;Kim, Sun-Kuk;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.373-382
    • /
    • 2019
  • In order to reduce the accident rate of construction in South Korea, governments and its affiliates have been tried to establish a safety culture, however they reached the limit. In addition, researchers recently have conducted regarding the safety climate and concluded that safety climate effect on the safety performance. Although organizational culture and enterprise types are different based on business size, they generalized the level of safety climate with a group only. Therefore, in order to solve this issue, the objective of this study is to analyze the safety climate level of construction company depending on business size in South Korea. In addition, the improvements are suggested on the level of safety climate after problems are drawn from considering organizational culture, enterprise type and construction industry in South Korea. In the future, this study will be used as a baseline for the effects of the safety climate on the safety performance in construction site based on business size.

MEASURING PERFORMANCE IN EGYPTIAN CONSTRUCTION FIRMS APPLYING QUALITY MANAGEMENT SYSTEMS

  • Manal S. Abd Elhamid;Sahar. Sh. Ghareeb;Ramadan O. Mohamed
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.149-156
    • /
    • 2011
  • The performance measurement of construction firms is considered as a competitive advantage to develop and improve their performance to have place in the market and stay able to face the continuous challenge. Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies showed. However, measuring that performance to include all the firm's aspects in a competitive way is a crucial process for the ECF's culture. The research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance on the organization level, and explore its impact on the organization that adopt quality management system. This model is based on specific elements and their related indicators which have been derived from national approaches and models of measuring performance (benchmarking, quality awards and six sigma).Elements determination and the status of their real practice has been investigated through a questionnaire to a representative sample of ECF. This model determines the performance level (PL) of the organization that measured by a mean of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the Egyptian construction firms. So, the final outcome of the model reveals the level of firm performance that helps the firm to identify the weak points against the strong ones, Confirm the priorities and identify new opportunities for developing, and Check the position of the company in the market among the others. Another questionnaire has been developed to be distributed on a group of Experts on measuring performance for the purpose of model validation. The majority of surveyed experts agreed that the proposed model can be applied effectively.

  • PDF

A Case Study of Measuring Residual Groundwater Level on Reclaimed and Dredging Clay Layer (준설점토 지반상 잔류 지하수위의 계측 사례 연구)

  • Yang Tae-Seon
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.7
    • /
    • pp.63-72
    • /
    • 2005
  • Grounwater level applied on dredged and reclaimed clay layer was assumed to be the same value under design criterion as field test one, but actually differences are found through the monitoring test. In this study, a case study of measuring residual groundwater level is performed in ground improvement construction of Gwangyang container terminal and hinterland. With priority given to residual groundwater level measured during construction and management period of 9 years, it is investigated that residual groundwater level (R. GWL) could be applied reasonably to the design, construction, and use stages of the container harbor and land development.

Health Hazardous Substances in Construction Work in Korea (건설업 근로자의 유해 작업 환경 노출 실태에 관한 연구)

  • Choi, Jae-Wook;Mun, Jung-Soo;Kim, Jeong-Ah;Won, Jeong-Il;Park, Hee-Chan
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.10 no.1
    • /
    • pp.74-92
    • /
    • 2000
  • This study was performed to evaluate the working conditions In construction workers through measurements of working environments and to improve the working conditions and to design the appropriate environmental and health management system. The results of measurement for working environments in construction work are as following: 1. The excess rate of noise and dust concentration in express highway construction, road construction, building construction and interior painting was 28.6% and 24.5% respectively. 2. The excess rate of mixed organic solvents concentration in interior painting was 39.3%. 3. The chain type bulldozer has the highest level of vibration; the excess rate was 85.7%, and among the vibration instruments, the level of left hand's vibration of all vibrators exceeded the criterion and in the case of drilling all the level of vibration exceeded the criterion in both hands. On the basis of the results in this research the environmental and health management system for construction workers must be considered. Therefore, it is necessary to be introduced the special medical examination and measurement of working environments in construction industry. In defining "the working place" of Article 39 of Enforcement regulations of industrial safety and health act, the word "indoors" should be deleted. Then the eligible industry for measurement of working environment must be extended. And it is also necessary for construction industry to be performed group health management service by agencies such as other manufacturing industry.

  • PDF

A Study on the Noise Characteristics about Equipment Operating under Construction (건설공사 시 장비운영에 따른 소음특성 기초연구)

  • Kim, Nagyoung;Kang, Heeman;Kim, Hongjong;Shin, Yongsuk;Kim, Changyong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.12
    • /
    • pp.43-49
    • /
    • 2012
  • Noise measurements were performed by distance for major construction equipment. especially, For construction equipment that large width of variations is depending on the type of work, noise measurements were performed by the detail type of work. For a time of quiescent and construction, "A" compensation equivalent noise level (Leq) were measured. Most of the construction equipment and the characteristics of the point source appears to be similar in analyzed noise measurement results.

A Study on the Construction Process of u-City IT Infrastructure (u-City IT인프라 구축 절차에 관한 연구)

  • Kim, Jeong-Uk;Kim, Il-Jung
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.3
    • /
    • pp.291-296
    • /
    • 2009
  • "The Act on Ubiquitous City Construction and etc." stipulates the regulations on the planning, construction and management of the u-City. As its national-level law system is about to take its effects, future new city developments are expected to have its legal basis to be built to meet u-City requirements. Also, it is anticipated that such needs would require much more planning techniques and strategies. In reaction to those upcoming needs, this study is to search for new IT infrastructure construction process of the u-City in reality. It is also to supply with the each step framework to execute the u-City projects in more structuralize and systemize manner. Therefore, with the u-City IT infra construction guide line v1.0, purpose of the establishment of comprehensive IT infrastructure construction process.

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

A Study on the Risk Analysis of Construction Method (건축공법 내부 리스크 분석에 관한 연구)

  • 윤여완;양극영
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.117-121
    • /
    • 2002
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce the risk of construction period. For this study we are using the pre and during construction period Inspection list. The inspection list was used by construction company for check a flaw of Construction field. So we rearrange the individual item of inspection list to match the Risk factor. This inspection list usually has the difference of importance because this list is not made by Method which is not focused on Method. Therefore, To find the difference of these importance, We surveyed this matter by doing interview of specialist group. To find the application of field and the possibility of measurement of Risk status, We tested Risk occurring frequency and it's strength by checking the level of Risk. The results of this study were as follows; Each Method Check List made out through the rearrangement of Construction Inspection list which used in construction company. To solve and compensate the matter which happened by changing the each Method Check List to each General Inspection List, we added the each Method Check List by checking the importance of check list of each process. By doing this, The Check List for finding Risk level of Method was created by using the check list of each Method.

  • PDF