• Title/Summary/Keyword: Construction level

Search Result 4,375, Processing Time 0.034 seconds

A Study on Perception Level of D.F.S in Architecture Design Firm and Solutions (설계사무소의 D.F.S 인식수준 분석 및 해결방향)

  • You, Sung-Gon;Lee, Kun-Hyung;Shin, Won-Sang;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.43-44
    • /
    • 2018
  • In the past, safety management has been carried out mainly by constructors, but now, participants of all construction projects such as clients, designers, constructors, and construction managers are being changed to perform safety management together. Among them, the design safety review, which examines whether the client has secured the design safety at the design stage, has been implemented since May 19, 2016, but it has not been properly implemented. Therefore, this study analyzed perception level and problems of D.F.S in architecture design firms and suggested the solutions.

  • PDF

Requirement Analysis for Development of EVMS in Nuclear Power Plant (원전건설 성과관리시스템(EVMS) 개발을 위한 요건 분석)

  • Won, Seo-Kyung;Park, Weon-Seob;Chong, Young-Whan;Kim, Jae-Yong;Kim, Yun-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.271-272
    • /
    • 2013
  • The Korean nuclear industry acquired technology for each construction stage including engineering, procurement, construction and commissioning from advanced nuclear countries. While the levels of technology and quality have greatly improved, the same cannot be said for the level of project management. In particular, the level of project performance measurement and forecasting project risk still remain at the single project management level. Thus, this paper reviewed the concept of the EVMS method and requirement for the system. The adoption of the EVMS, an advanced project management method, can enable efficient management of project risks and promote an adequate environment for project implementation.

  • PDF

A Study on The Risk Level of Work Types in Urban Railway Construction (도시철도 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Han, In-Kuk;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.31 no.2
    • /
    • pp.98-103
    • /
    • 2016
  • The goals of this study were to investigate some significant factors to judge level of safety at urban railway construction field and to analyze degree of risk by work classification. Currently, there are lots of construction fields for the urban railway for national transportation, and our government also planned constructing more urban railway in near future. However, most of the researches on safety neglected the degree of risk factors on the urban railway construction field. Safety managers participated in the brainstorming session for deriving decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for deriving most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including adjacency of obstacle, intensity of work, unsafe condition and work space. Third, the results of AHP showed civil work is the most dangerous work among 6 work types. The results could be used to give the safety management priority on accident prevention efforts among several hazards and to reduce degree of risk in construction field of the urban railway.

A Basic Study on Safety Climate Level of Construction Company depending on Business Scale in South Korea (건설 기업규모별 안전분위기 인식 수준에 관한 기초연구)

  • Ha, Sungeun;Kim, Taehui;Na, Youngju;Son, Kiyoung;Son, Seunghyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.161-162
    • /
    • 2018
  • Many researchers in South Korea have conducted regarding the safety climate and concluded that the safety climate effect on the safety performance. However, the survey tools that were used in domestic research were developed by individuals or designed by reconstituting, translating from previous studies. In addition, the safety climate as a low factor of organizational culture showed up in different types depending on business scale. In order to solve this issue, the objective of this study is to analyze the safety climate level of construction company depending on business scale in South Korea. first, the survey is conducted by NOSACQ-50 for construction workers. Second, it is analyzed how organizational culture affected the safety climate. Finally, the improvements are suggested on the level of safety climate. In the future, this study will be used as a baseline for the effects of the safety climate on the safety performance in construction site based on business scale.

  • PDF

A Study on the Risk Level of Work Types in Nuclear Power Plant Construction (원자력발전소 건설공사의 공종별 위험도에 관한 연구)

  • Lee, Jong-Bin;Lee, Jun Kyung;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.3
    • /
    • pp.95-99
    • /
    • 2013
  • The goal of this study was to investigate some significant factors to influence level of safety at plant construction field and analyze degree of risk by work classification. Currently, there are lots of construction fields for the nuclear power plant for electricity generation, and our government also planned constructing more nuclear power plant in near future. However, much of the safety literature neglected the degree of risk factors on the plant construction field. Safety managers participated in the brainstorming session for drawing decision criteria of the degree of risk (i.e., significant factors). Then, they were asked to answer a structured questionnaire which was developed for drawing most important factors. Finally, the analytic hierarchy process (AHP) was used to analyze level of risk by work classification. The following results were obtained. First, total twelve factors judging degree of risk were found in the brainstorming session. Second, the questionnaire showed four significant factors, including number of workers, working environments, skill of craft and accident experience. Third, the results of AHP showed Architecture work is the most dangerous work among 6 work types. The results could be used to reduce degree of risk in construction field of the nuclear power plant.

Introduction to Occupational Safety and Health Training Scheme for Construction Works (건설근로자 안전보건교육 이수제도 도입방안에 관한 연구)

  • Jung, Sung-Hoon;Kim, Tae-Soo;Joo, Yong-Ma;Lee, Yeon-Bog;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.9-18
    • /
    • 2011
  • Daily workers in construction sites rarely receive the benefit of systematic safety and health training as they are required to move from one construction site to another in response to the start, completion, and repetition of construction works. Also, small- to medium-sized construction sites often lack the capacity to train their workers. Therefore, as in the advanced countries, basic OSH training sheme for construction workers should be conducted in the industrial-level, rather than in individual workplace-level, to make the training more effective. By doing so, only workers with the basic safety training will be able to engage in construction works. Consequently, accidents in the construction industry will decrease, as workers themselves who are at the forefront of the construction worksites are empowered to play the central role in accident prevention activities.

Analysis of sound power level of high-noise construction machinery excavator (고소음 건설기계 굴삭기의 소음도 현황 분석)

  • Park, Hyung-Kyu;Jung, Joon Sig
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.240-246
    • /
    • 2019
  • The noise generated by construction machinery operating at construction sites is a major cause of environmental disputes with nearby residents. To reduce construction site noise, low noise construction machinery and low noise methods are recommended to be used first. In addition, the possible noise should be predicted and preventive measures suitable for the noise source should be taken. This study analyzed the sound power level of an excavator, which is used most frequently at construction sites. The sound power level of 297 excavators sold in Korea after 2008 were analyzed and the sound power level was classified according to the type, output (kW), and production site of the excavator engine based on the measured data. As a result, the sound power level decreased by 1 dBA depending on the change in engine type and the sound power level increased by approximately 3 dB (A) when the engine output was doubled. In addition, the sound power level was low in small-sized products of less than 55 kW for overseas products and medium and small-sized products of 55 to 104 kW for domestic products.

Safety Perception Level of Workers in Construction Site According to NOSACQ-50 (NOSACQ-50을 활용한 건설현장 작업자들의 안전 인식 수준에 관한 연구)

  • Ha, Seung-Yong;Kim, Sun-Kuk;Son, Seung-Hyun;Ha, Sun-Geun;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The purpose of this study is to analyze safety perception level of workers in construction site according to NOSACQ-50. To achieve the objective of this study, First, literature review is conducted to clearly define the concept of safety climate. Second, NOSACQ-50 is used to survey the level of safety climate of workers. Third, statistical analysis based on collected data is conducted to examine the level of safety climate. As a result, the level of safety climate in South Korea was found to be serious comparing with the standard value proposed in NOSACQ-50. Finally, the improvements were suggested after investigating the key factors on the level of safety climate. In the future, this study will be used as a baseline for developing safety awareness assessment tools such as NOSACQ-50 for domestic construction sites.

Analysis of Changes in Groundwater Level according to Tunnel Passage in Geological Vulnerable Zone (지질취약구간 터널통과에 따른 지하수위 변화량 분석)

  • Choi, Jung-Youl;Yang, Gyu-Nam;Kim, Tae-Jun;Chung, Jee Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.3
    • /
    • pp.369-375
    • /
    • 2020
  • The section of this study is the geological vulnerable zone where groundwater leakage occurred through the tunnel barrier during excavation of the shield tunnel boring machine(TBM) for the construction of the electric power unit. Therefore, a Three D imensions(3D) numerical analysis was performed to analyze the actual situation from before construction to the time when the change in groundwater level occurred, and to reflect the surrounding ground conditions based on the observed change in groundwater level during construction. As a result of the study, the correlation between groundwater level change and tunnel construction around the site was identified. Therefore, it was similar to the measurement result of groundwater level at the target ground. The amount of groundwater discharge to the entrance of the tunnel construction was also similar to the actual measured result, and the numerical analysis method and modeling in this study were analyzed to reflect the site conditions.

A Study on Improvements of Children's Denim Pants Construction Method Based on Physical Characteristics and Body Areas Worn - Focusing on 4-year-old Boys -

  • Kim, Hye Suk;Nam, Yun-Ja
    • Fashion & Textile Research Journal
    • /
    • v.16 no.3
    • /
    • pp.406-420
    • /
    • 2014
  • The goal of this study is to support the children's pants construction methods that secure clothing size and fit appropriateness through proposed improvements of denim pants construction method focusing on 4-year-old boys. Depths interview on the actual condition, measurements and calculations for positions and ease of the clothing points corresponding to the body points actually worn were conducted for 47 denim pants of nine boys. "Characteristics of the areas worn" and "physical characteristics of lower body" were analyzed, and improvements of 4-year-old children's denim pants construction method were proposed. As the results, the different figures in "characteristics of the areas worn" between the existing children's pants construction methods and children's actual wearing habits were found, and identification of distinct children's lower body from adults' supports that we should avoid tracing adults' methods without reasons. Children's pants construction method on basis of actual wearing should be devised to solve fit problems. Improvements of children's method were proposed such as ease of girth by different area worn, ease of "elastic waist girth", the difference between "elastic waist girth" and "pattern waist girth", and the difference between "pattern waist girth" and "pattern hip girth" as considerations of pants girth items, and appropriate position "clothing waist girth" "pants hip length" level, "pants crotch length" level, "clothing knee length" level, and "pants outside length" level for pattern making as considerations of clothing length items.