• Title/Summary/Keyword: Construction facility

Search Result 1,622, Processing Time 0.033 seconds

A Study on BIM-based Reference Model for Effective Urban Facility Management (효과적인 도시시설물 관리를 위한 BIM기반 참조 모델 개발)

  • Kang, Tae-Wook;Youn, Jun-Hee;Kim, Jang-Wook;Choi, Hyun-Sang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.3
    • /
    • pp.1786-1794
    • /
    • 2014
  • The purpose of this study is to suggest BIM-based Reference Model(RM) for Urban Facility Management(UFM) System development efficiently. The urban facility management's objective is to take the user convenience and safety from checking the facility to maintain it's function. Recently, to manage the facilities effectively, the BIM technology is being applied to it. In this study, the research trend related to the UFM system is surveyed and analyzed to develop the BIM-based UFM RM. After developing the RM component and process, the BIM-based UFM RM is proposed.

Development of Roadside Facility Management System with Video GIS Technology

  • Joo, In-Hak;Nam, Kwang-Woo;Yoo, Jae-Jun;Lee, Jong-Hun
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.169-174
    • /
    • 2002
  • In this paper, we suggest a new spatial information system called video GIS where video is used for spatial data construction and is integrated with map. We develop a prototype system of video GIS and apply it to roadside facility management. The main functions supported by the suggested system are data collection, coordinate calculation and conversion, data construction, analysis, searching, and browsing. The stereo images and corresponding position data are collected by a vehicle named 4S-Van that has GPS, IMU, and cameras. The 3-D coordinates of the objects in the images, such as road sign, signal lamp, and building, can be calculated and constructed from the collected data. The spatial objects are displayed on both image and map, and can be searched and browsed, which enables visual and realistic browsing and management of spatial objects. Compared to conventional field survey used in roadside facility management, the method enables faster, easier, and more efficient construction of spatial data. The suggested video GIS can be applied not only to roadside facility management but also to many similar projects of central or local governments that are related to GIS.

  • PDF

AN ASSESSMENT SYSTEM OF ECO-FRIENDLINESS OF CONSTRUCTED FACILITY IN THE DESIGN PHASE USING VALUE ENGINEERING

  • Byung-Soo, Kim;Dong-Eun, Lee;Suk-Hyun, Kwon;Min-Kwon, Choe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1625-1629
    • /
    • 2009
  • The new paradigm called 'Low Carbon Green Growth' involved in reducing greenhouse gas is on the rise as a critical issue worldwide. The essential of Kyoto protocol issued in 1997 is to achieve the sustainable economic growth environments by converting existing production system to eco-friendly one. The protocol imposes the liability to reduce greenhouse gas to the countries joined to it. The paradigm is directly involved in the energy consumption and environmental pollution caused by construction activities. Value Engineering which are mainly applied in the design phase in practice is a measure to improve the value of a constructed facility by analyzing and/or appraising the functions and costs of it. However, an appropriate method which assesses eco-friendliness of constructed facility has not been propose by researchers. This paper proposes a method which assesses the performance involved in eco-friendliness of constructed facility using Value Engineering (VE) in the design phase. The method estimates the environmental cost relative to the amounts of energy consumption and environmental pollution occurred over the entire project life cycle. The database called "Life Cycle Inventory DB", which stores information about the amounts of environmental pollution, is used. The algorithm which retrieves the amounts of environmental pollutions from the DB and converts them into environmental costs is developed. The algorithm is implemented into a system which quantifies the eco-friendliness of constructed facility in the design phase using VE.

  • PDF

A Study on the Applied Zoning System for the Preventing Reckless Developments due to Industrial Facility Construction -A Case Study on Hwasung- (공장 및 제조장 난개발 방지를 위한 지구제 적용방안에 관한 연구 -화성시를 사례로-)

  • Kim, Chul-Hong;Lee, Won-Young;Choi, Hyung-Seok
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.5
    • /
    • pp.45-57
    • /
    • 2002
  • This study aims to suggest the applied zoning system for preventing reckless developments due to individual industrial facility construction. According to the types of reckless developments which has been found in Hwasung, the applied zoning system including 4 kinds of districts can be proposed. Collective Inducement District can be designated to where many industrial facilities have already existed with poor infrastructure, and the other districts such as Residential Area Protection District, Reservoir-Around and Agricultural Area Protection District, or Landscape Protection District may be designated to the sites where reckless developments due to individual industrial facility construction may happen. This zoning system seems to be used as a guideline of new zoning of revised NLUPL(National Land Use and Plan Law) after the execution.

THE STUDY ON THE PROBLEMS OF MARITIME FACILITIES(GAS PLANT) INSURANCE REGULATIONS

  • Keun-Hyung Park;Moon-Sun Park ;Moon-Hwan Hwang;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1576-1581
    • /
    • 2009
  • The purpose of this study is to provide the problems of insurance system of maritime facilities(Gas Plant) in korea. In order to find out the problems of insurance system of construction work, the literature research and case study on the maritime facility construction are adopted as research method. And this study analyzed the construction cases of maritime facilities(Gas Plant) to which the national contract law was applied for the first time. The findings of this study are as follows: In the case analysis of 00 facility construction, the contractor pay additional insurance fees for the construction. And the regulations on insurance registration are not stated clearly relating to the enforcement ordinance of the national contract law.

  • PDF

A Study on the Consumer Choice Criteria based on Facility Purpsoe for Multi-Mixed Complex Medical Care Facility Development (의료복합시설 개발을 위한 시설용도별 이용자 선택기준에 관한 연구)

  • Sung, Nayoung;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.28-39
    • /
    • 2016
  • The multi-mixed complex medical care facility consisting of mainly hospital and other associated facilities such as retail, office, accommodation, healthcare services, and so on, is currently recognized as a new segment in the real estate market. This study intends to identify the customer choice criteria for the development of multi-mixed complex medical care facility. Based on literature review and expert consultation, the 3 criteria with 12 sub-criteria for customer choice have been defined. And the AHP methodology has been implemented for the development of relative weight of those criteria depending on the type of facility including 'medical facility', 'supporting facility', 'healthcare service facility' and 'other ancillary facility'. Research findings indicated the implication for the optimal combination of facility development based on the customer choice criteria controlled by facility. Accordingly, this research intends to provide the guidance toward the development of multi-mixed complex medical care facility.

Causes of Change Orders in the Military Facility Construction Projects and Suggestions for Improvement (군사시설 건설사업의 설계변경 요인분석 및 개선방향)

  • Lee, Kyoung-Han;Choi, Jong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.3
    • /
    • pp.263-271
    • /
    • 2013
  • Change orders have been widespread in both the private and public construction sectors. In particular, in the case of G2B (Government to Business) contracts, adjustment of contract price and/or schedule extension is a frequent occurrence due to change orders. To uncover the causes of change orders and suggest an appropriate strategy, this study analyzed 296 cases of change orders in military facility construction projects from 2008 to 2010. The analysis revealed that the major causes of change orders are users' additional requirements (28.38%), a change of finishing materials (23.99%), and change of footing type (17.57%), in that order. Building on the results of this analysis, the authors suggest plans for practical improvements. Specific recommendations include 1) reflect user requirements at the early stage, 2) minimize the use of additional budget due to change orders, and 3) reduce the process and time for contract amendment, among others. The results of this study may provide significant implications to those involved in military construction projects, particularly project owners (i.e., the Ministry of Defense) and contractors.

Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL (초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석)

  • Ryu, Hanguk;Kim, Hyungeun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.

A Study on Classification Standard for Efficient Maintenance System of Educational Facilities (교육시설물의 효율적 유지관리 체계정립을 위한 분류 기준연구)

  • Kim, Song-Hwa;Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.403-407
    • /
    • 2007
  • Korean Government conducted "a research for establishing the integrated construction information classification system" and suggested the classification system for the first and second level in terms of the complexity in May, 2001. The Ministry of Construction and Transportation announced a standard of the integrated construction information classification system using previous research in August, 2001. Since 2005, many BTL projects have been constructed for the educational facility. However, there is mixed official standard of the system for the educational facility. Moreover, it is difficult for the SPC to use the current "integrated construction information classification system", since the item in the educational facility cannot be easily located in the current system. Thus, this research suggests an efficient maintenance system for the educational facility. Two classification systems, space-oriented and element-oriented systems, are suggested to increase efficiency of the classification system.

  • PDF

A Study on the Analysis of Actual costs and Maintenance costs for Elemental Classification hierarchy (부위별 분류 체계를 통한 공사비 및 유지관리비 분석 - 교육 시설물을 중심으로 -)

  • Kang, Hyun-Wook;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.142-150
    • /
    • 2010
  • The purpose of this study is to analyze maintenance costs and estimation of elemental costs for educational buildings. The adapted research method selected four school buildings in seoul region as BTL projects. On the basis of the selected case, the study suggested a model to establish a system for each parts and estimate analyzed construction costs and maintenance costs according to that system. According to the analysis, the study proposed a partial construction costs analysis table and maintenance costs table and analyzed proper construction costs and maintenances costs. The results of this study are as follows 1) The average ratio followed by calculation of partial construction costs of the four school buildings are as followings. The total construction costs is analysed 6,666million won and each part of average rations is structure 47.15%, exterior of building 8.34%, interior of building 23.37%, electricity & fire fighting facility 5.74%, water supply & healthy facility 4.27%, heating & water supply facility 5.25%, landscape 1.36%, civil engineering works 4.51%. 2)The average ratio followed by analysis of partial maintenance costs of the four school buildings are as followings. The total maintenance costs is analysed 4,309 million won and each part of average ratio is exterior of building 11.02%, interior of building 41.81%, electricity & fire fighting facility 14.81%, water supply & healthy facility 11.22%, heating & water supply facility 12.76%, landscape 5.75%, civil engineering works 2.63%.