Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL

초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석

  • Received : 2015.03.31
  • Accepted : 2015.04.24
  • Published : 2015.04.30

Abstract

The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.

정확한 공사비 추정은 성공적인 프로젝트의 개발에 필수적이다. BTL 사업과 같이 민간투자사업에 있어서 정확한 공사비 산정은 효과적인 예산확보와 파이낸싱에 필수적인 기본 정보가 된다. 공사비 견적의 정확도에 따라 입찰과 제안서의 정확도가 반영되므로 프로젝트를 통한 수익성 여부와 사업타당성을 확보할 수 있다. 본 연구는 정확한 공사비 분석과 활용을 위한 기초적인 연구로써 10년 정도 경과한 초 중등학교 민간투자사업(BTL)의 건축공사비를 분석하여 여러 참여주체들별로 공사를 할 수 있는 건축공사의 공종별 분포비율을 학교급별로 파악한다. 즉, 초 중등학교의 건축 공종별 구성비율을 전체 평균비율, 초등학교, 중학교, 고등학교별로 살펴보고 향후 유사한 공사를 수행하는 경우에 참여주체별로 활용할 수 있도록 하고자 한다.

Keywords

References

  1. 고성석, 김현식, 이현철, 실적공사비 분석을 통한 유통시설물의 적정공사비 추정에 관한 연구, 한국건설관리학회 논문집, 한국건설관리학회, 9권, 3호, 2008, pp.108-117.
  2. 권오현, 최민수, 건설상품별 중장기 시장전망(II)-비주택부문. 한국건설산업연구, 2004.
  3. 김기홍, 박찬식, 장선호, 고층 사무소건축의 공사비계획을 위한 웹기반 개략견적 프로그램, 한국건설관리학회 논문집, 한국건설관리학회, 6권 2호, 2005, pp.69-79.
  4. 김청융, 손재호, 교육시설의 개념단계 공사비예측을 위한 인공신경망모델 개발에 관한 연구, 한국건설관리학회논문집, 한국건설관리학회, 7권, 4호, 2006,pp.91-99.
  5. 김형은, 강현빈, 이은일, 이상신, 정효진, 초중등 학교시설 신설사업 교부기준 개발, 한국교육개발원, 2013.
  6. 백승호, 강태경, 이유섭, 공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안, 한국건축시공학회 논문집, 한국건축시공학회, 12권, 1호, 2012, pp.108-114.
  7. 서준오, 류한국, 이동열, 공공청사 신축공사의 기획 및 설계단계 공사비 산정 프레임워크 개발, 대한건축학회 논문집, 대한건축학회, 24권, 3호, 2008, pp.153-160.
  8. 이기상, 공간단위 공사비 산정방법에 관한 연구-공종별 공사비의 공간정보 부재로 인한 한계점 개선을 중심으로-, 한국건설관리학회 논문집, 한국건설관리학회, 12권, 3호, 2011, pp.131-139.
  9. 이현석, 이은영, 김예상, 시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구, 한국건설관리학회 논문집, 한국건설관리학회, 14권, 4호, 2013, pp.24-34.
  10. 지세현, 박문서, 이현수, 윤유상, 건설공사 공사비 예측 및 관리기술 발전방향, 한국건설관리학회논문집, 한국건설관리학회, 9권, 2호, 2008, pp.170-181.
  11. 현창택, 문현석, 공공업무시설의 기획단계 공사비 및 공사비 범위 추정모델 개발, 대한건축학회논문집 구조계, 대한건축학회, 26권, 6호, 2010, pp.139-148.
  12. Pin T.H. and Scott W.F., Bidding model for refurbishment work. ournal of Construction Engineering and Management, 120(2),1994, pp.257-273. https://doi.org/10.1061/(ASCE)0733-9364(1994)120:2(257)
  13. Adeli H. and Wu M., Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, 124(1), 1998, pp.18-24. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:1(18)
  14. Hegazy T. and Ayed A., Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), 1998, pp.210-218. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(210)
  15. Smith B.L., Software development cost estimation for infrastructure systems. Journal of Management in Engineering, 18(3),2002, pp.104-110. https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(104)
  16. Bakis, N. et al. An integrated environment for life cycle costing in construction. CIB REPORT w-78, International Coulcil for Building, 2003.
  17. Wilmot C.G. and Cheng G., Estimating future highway construction costs. Journal of Construction Engineering and Management, 129(3), 2003, pp.272-279. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:3(272)
  18. Kim G.H., An S.H., and Kang K.I., Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Building and Environment, 39(10), 2004, pp.1235-1242. https://doi.org/10.1016/j.buildenv.2004.02.013
  19. Chou J.S., Web-based CBR system applied to early cost budgeting for pavement maintenance project. Expert Systems with Applications, 36(2), 2009, pp.2947-2960. https://doi.org/10.1016/j.eswa.2008.01.025
  20. Ahn J. et al. The attribute impact concept: Applications in case-based reasoning and parametric cost estimation. Automation in Construction, 43, 2014, pp.195-203. https://doi.org/10.1016/j.autcon.2014.03.011