• Title/Summary/Keyword: 건축공사비

Search Result 253, Processing Time 0.025 seconds

Development of Construction Cost Estimation Model for Elementary, Middle and High School Facilities (초·중·고등학교 시설물별 추정공사비 산정모델 개발)

  • Jung, Eui-Hyun;Yeom, Dong-Jun;Kim, Jun-Sang;Kim, Young Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.69-78
    • /
    • 2021
  • Estimated construction cost is an important index to secure an optimal budget which needs to go into construction projects in the previous of basic design phase. In order for public institutions to calculate the estimated construction cost, the cost per unit area of public buildings is used. However, the current calculation method of the estimated construction cost in public buildings is impossible to reflect the characteristics of many facilities and combinations. The purpose of this study is to develop an estimation model in the previous of basic design phase for the elementary, middle and high school facilities. it is expected that it is possible to estimate the construction cost of the elementary, middle and high schools in a reasonable and reliable manner through the estimation model developed in this study.

시설공사가격관리자료

  • Korea Institute of Registered Architects
    • Korean Architects
    • /
    • no.6 s.195
    • /
    • pp.83-87
    • /
    • 1985
  • 본 시설공사 가격관리 자료는 '84년도 조달청 시설국이 발주한 공사중 표준가격으로 활용할 수 있는 수준의 건축공사를 발췌하여 이를 비목별,공종별 단위당 공사비와 건물유형별로 중요자재 소요량 및 소요품수 등을 분석한 것입니다. 따라서 회원 여러분께서 본 자료를 잘 활용하면 건물종류별로 우리 실정에 알맞는 표준 건축물의 기준 자료로 이용할 수 있으며 또한 건축물의 과도한 고급화를 억제하여 예산을 절감하는 등 공사비 단가 간접통제 수단이 될 수도 있을 것입니다. 공사집행부서는 본 자료를 시설공사 계획 단계부터 발주, 시공 과정에 이르기까지 관리자료로 활용하시기 바라며 조달청에서는 본 자료를 각 수요기관이 계약요청하는 공사에 대하여 공사비 단가를 비교 평가하는 자료로 활용할 것입니다.

  • PDF

Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL (초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석)

  • Ryu, Hanguk;Kim, Hyungeun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.

Prediction of Building Construction Project Costs Using Adaptive Neuro-Fuzzy Inference System(ANFIS) (적응형 뉴로-퍼지(ANFIS)를 이용한 건축공사비 예측)

  • Yun, Seok-Heon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.1
    • /
    • pp.103-111
    • /
    • 2023
  • Accurate cost estimation in the early stages of a construction project is critical to the successful execution of the project. In this study, an ANFIS model was presented to predict construction costs in the early stages of a construction project. To increase the usability of the model, open construction cost data was used, and a model using limited information in the early stage of the project was presented. We analyzed existing studies related to ANFIS to identify recent trends, and after reviewing the basic structure of ANFIS, presented an ANFIS model for predicting conceptual construction costs. The variation in prediction performance depending on the type and number of membership functions of the ANFIS model was analyzed, the model with the best performance was presented, and the prediction accuracy of representative machine learning models was compared and analyzed. Through comparing the ANFIS model with other machine learning models, it was found to show equal or better performance, and it is concluded that it can be applied to predicting construction costs in the early stage of a project.

Cost Prediction Model for Building Demolition Work by Using Regression Analysis (회귀분석을 이용한 건축물 해체공사비 예측모델)

  • Kim, Taehoon;Kim, Young Hyun;Cho, Kyuman
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.105-112
    • /
    • 2021
  • While the scale of the domestic market for demolition work is steadily increasing, research on cost prediction for demolition work is insufficient. Thus, this study proposes a cost prediction model for demolition work that reflects various attributes influecing the fluctuation of demolition cost. 13 influencing factors and historical cost data were collected based on literature review and experts' advice, and two prediction models were constructed through regression analysis and the prediction accuracy was evaluated. As a result, it showed an average error rate of about 6 to 12%, and it was possible to explore the possibility of use as a reliable prediction model. The results of this study can contribute to estimating appropriate construction cost and improving related standards for domestic demolition works in the future.

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

Development of the Preliminary Cost Estimate Method for the Free-Form Building Facade Trade in Conjunction with the Panel Optimization Algorithm Process (곡면 최적화 알고리즘을 활용한 비정형 건축물 외장공사비 개산견적에 관한 연구)

  • Lim, Jang Sik;Ock, Jong Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.95-106
    • /
    • 2014
  • The outer surfaces of free form buildings contain panels with two-directional curvatures. To construct these panels, complex geometric surfaces should be divided into forms and sizes that can be manufactured and constructed efficiently. Because the bigger the curvatures of these panel, the more expensive the construction costs, these complex curvatures should go through optimal process of reinterpretation to minimize the curved surfaces with complex two-directional curvatures, which is called panel optimization. Small construction and design companies have trouble in calculating even rough estimate and cannot adjust expected construction cost of the panels based on comparison of design alternatives in conjunction with panel optimization process due to lack of knowledge and experience. This study conducts the research that can support designers' cost decision-making in the design stage of the free form buildings with respect to the panel optimization process. A 3D commercial application specialized to modeling free form shapes is used for the purpose.

A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage (기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰)

  • Jo, Seong-Min;Cho, Sung-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

Cost Estimating Method of Public Building Construction through Construction Scale (공사규모에 따른 공공건축물 공사비의 산정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.307-316
    • /
    • 2015
  • As there are a lot of differences in the public building construction cost depending on the construction scale of actual construction cost system, a lot of problems occur in the estimation of the cost. So, the development of a predictive model depending on the construction scale shall be used in a way that it is applied to the case selectively and differently. This study drew a cost estimating model through a regression analysis. For this, 42 construction sites which were ordered during 2011 to 2012 by Public Procurement Service data were selected as a historical data. Based on the application of the model to new construction and the verification of its effect, the reasonable model for estimating the construction cost has been suggested.

Development of Basic Construction Cost Estimation Model for Expansion of Underground Parking Lot Remodeling in Apartment Housing (공동주택 지하주차장 확대 리모델링 개략 공사비 산정 모델 개발)

  • Jeong, Eunbeen;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.42-52
    • /
    • 2021
  • The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.