건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구 (Analysis of Construction Safety Management and Execution Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 추계 학술논문 발표대회
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

건설공사장 소음의 위해성 평가 (Assessment of Annoyance Cause by Different Types of Construction Noises)

  • 이성찬;전진용
    • 한국소음진동공학회논문집
    • /
    • 제23권12호
    • /
    • pp.1111-1116
    • /
    • 2013
  • In the present study, annoyance caused by diverse construction noises was evaluated through surveys. A survey with a total of 110 construction workers was carried out to investigate annoyance from construction noises at different construction phases. The most effective item of adverse by construction noise was annoyance and the most annoyed construction stage was destruction construction. There were high correlation between work performance and work safety as well as work safety and speech interference. Participant's noise sensitivity were significant between low and high group at work performance, work safety, speech interference.

건설공사장 소음의 위해성 평가 (Assessment of Annoyance cause by Different Types of Construction Noises)

  • 이성찬;이평직;전진용;정진연;임정빈
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2011년도 추계학술대회 논문집
    • /
    • pp.408-413
    • /
    • 2011
  • In the present study, annoyance caused by diverse construction noises was evaluated through surveys and laboratory experiments. A survey with a total of 110 construction workers was carried out to investigate annoyance from construction noises at different construction phases. The most effective item of adverse by construction noise was annoyance and the most annoyed construction stage was destruction construction. Between work performance and work safety had correlation as well as between work safety and speech interference. Participant's noise sensitivity were significant between low and high group at work performance, work safety, speech interference.

  • PDF

돌관공사가 안전관리에 미치는 영향 및 예방대책에 관한 연구 (A Study on the Impact to Safety Management and the Prevention Measure by the Speedy Construction Work)

  • 하행봉;방명석;임규원
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2013년 춘계학술대회
    • /
    • pp.243-254
    • /
    • 2013
  • Recently in the construction business construction companies has been ordered to survive in the terriblly competitive environment. Aa a result, most of the project with low-priced contract needs a speedy progress during all construction period. For the last five years major incident frequently occurs and results in the death of 189 workers at major top 6 construction builders. In most recent 10 years, the cause of major incidents happened in construction company is the speedy construction work that is affecting on the safety management. To prevent these accidents in the speedy construction work, four factors were chosed and analysed such as the personnel/organization, the working budget, the subcontractor selection and the employee motivation. The head office taked the support plan and tested it at the pilot work site. It showed a reduced accident and the harmful factors can be eliminated. It should be able to apply to the field to secure safety and prevent accidents.

  • PDF

공동주택 철근콘크리트 공사 작업지연요인에 관한 연구 (A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction)

  • 이현철;임소연;여상구;고성석
    • 한국건축시공학회지
    • /
    • 제9권2호
    • /
    • pp.55-61
    • /
    • 2009
  • In order to conduct construction projects effectively, the work delay factors would be managed by planned construction schedules. As construction works are delayed ceaselessly, the solution is to select and manage the key factors which delay the work ceaselessly. The subjects of this study were an apartment houses of reinforced concrete structure. Hidden work delay factor were extracted, the surveys were conducted and occurrence, severity and detection of each factor were analyzed. With this result, final orders of priority were fixed and key management factors were deducted and presented.

실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발 (The Common Temporary Work Management System Using Historical Database)

  • 박경호;이훈구;백종건;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.367-370
    • /
    • 2002
  • 건설 프로젝트의 초기단계에 타당성을 검토함에 있어서 공통가설공사의 경우 설계도서상에 표시가 되지 않거나, 시방서상에 간략하게 서술되어 있기 때문에 담당자의 경험 의존율이 다른 공종에 비해 높다. 이런 초기단계의 결전은 프로젝트의 진행과 더불어 많은 문제점들을 야기 시킬 가능성이 있다. 따라서 최근 활발히 논의가 되고 있는 기존 공사정보에 대한 실적 데이터베이스와 공통가설공사의 분류체계를 포함한 시스템을 개발하여 자료들을 분석, 활용함으로써 시공전(Pre-Construction) 단계의 공통가설공사에 대한 작업 및 원가 예측을 용이하게 하고, 후에 Feed Back 됨으로써 정확한 건설 프로젝트 타당성 분석을 가능케 하고자 한다.

  • PDF

소규모 건설현장 떨어짐 사망재해 저감방안 연구 - 비계 및 작업발판 중심 - (Research of the reduction measures for fall accident death in small scale construction sites. - On the Basis of work plate and scaffolding -)

  • 유현동;강경식
    • 대한안전경영과학회지
    • /
    • 제16권3호
    • /
    • pp.55-62
    • /
    • 2014
  • During five years (Year 2009~2013), Total victims of 72 %(81,560 people) and those 50.6 %(1,258 people) of death accident occurs in small scale construction site which operate 2 million USD less construction budget. Especially, falling death accident account for 785 people, in the share of 33.2 %(261 people) death disaster takes due to defect of original cause materials. The major safety issues in small scale work place take place while scaffold installation, disassembling, work-plate improper installation or non-professional skills of workers. Furthermore, labor subcontract systems make small construction site shortage of resources. Those workers regard work-plate as unnecessary and consumables supplies. Because of that most of workers use unsafe workplace in most construction site. Therefore, in order to prevent falling accident occurring in small scale work site, government should organize related regulations such as "Work site safety construction method" and then expands education support, financial aid, and sourcing safety supplies for work plate which offer broad variety experiences. Also, introduce certificate solutions for various work plates to improve safety function such as anchoring type method and anti sliding function.

Labor Productivity Model for Reinforced Concrete Construction Projects

  • Ho Myun Jang;Kyong Hoon Kim;Sang Hyeon Kim;Kyung Hwan Kim;Jae Jun Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.983-989
    • /
    • 2009
  • This study aims to systematically identify direct and indirect factors that influence labor productivity and to build a model that mathematically quantifies them so as to efficiently manage and increase labor productivity in the construction work. This study was performed based on the productivity model for workers in reinforced concrete construction projects, because it aims to establish a general construction labor productivity model that reflects many factors that influence labor productivity. Using statistical analysis, we found that the components that significantly influence productivity were the worker component, the work characteristic component, the work technique component, the work management component, the equipment & materials component, and the work guide component, while the work delay components did not significantly influence productivity. In addition, a priority analysis was performed based on the components that showed statistically significant effects. The results of the analysis indicated that the influence of work management component and the work technique component is more than that of the worker component and the work characteristic component. The construction labor productivity model that was formulated in this study could be used for the determining the standard productivity during the initial planning stage, so the best strategy for increasing labor productivity could be formulated.

  • PDF

건축공사 내역서 세부항목 구성에 대한 사례연구 (A Case Study on Improvement for Optimal Organization of Work Items in Construction Bill of Quantities)

  • 노혜라;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 추계 학술논문 발표대회
    • /
    • pp.67-68
    • /
    • 2016
  • In construction management, BoQ(Bill of Quantities) has been commonly used for the cost estimation. However, many problems have been recognized about the work items used in the BoQ that could be varied by the experience and knowledge of the estimators or the project. Also, there are lots of work items that have to be written in BoQ even though the cost proportion of those items is relatively lower than the others. In this study we consider the way how to organize optimally the work items through the analysis of case. The results of this study could be useful for improving the efficiency of preparing construction BoQ and conducting Quantity take-off in our construction management practices.

  • PDF

공동주택 마감공사 중요도 기반 작업지연 요인 분석 (Delay Factors Based on the Importance of Finish Work in Apartment Construction Project)

  • 이승훈;이상효;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF