• Title/Summary/Keyword: Construction Sites

Search Result 2,279, Processing Time 0.026 seconds

A Study on the Indwelled Accident Factors in Small & Medium-Sized Construction Sites Utilizing Safety Consulting Data (건설재해예방기술지도 결과자료 분석을 통한 중$\cdot$소 건설 현장의 잠재사고 유발 요인 개선 방안 연구)

  • Hong Sung Man;Yoon Young Goo;Kweon Dae Chul;Park Peom
    • Journal of the Korean Society of Safety
    • /
    • v.19 no.3 s.67
    • /
    • pp.84-88
    • /
    • 2004
  • Accident of small and medium-sized construction sites happens much than large-sized construction sites. The safety consulting for accident prevention of construction sites has been launched in 1995. This research probed latency accident of small and medium-sized construction sites. By method, we used that result data of safety consulting for accident prevention of small and medium-sized construction sites. As a result a fall was examined by the most latency accident factor. In this study, a fall and electric shock, descent, fall down in ground, a fire was examined weighty accident factor of small and medium-sized construction sites.

A Study on the Application of Smart Safety Technology at Construction Sites in South Korea

  • Choi, Ji-Sun;Hwang, Hoon-Hee;Ryu, Suzy
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.153-161
    • /
    • 2022
  • Among all industries, the construction industry still remains a traditional one with low productivity due to its labor-intensive and field-dependent production system, its supplier-oriented industrial structure, and the disruption of the information flow between participants. In addition, the construction industry in South Korea has recently been required to transform itself according to social trends such as aging, the reduction of skilled workers, and the shortening of working hours, and the disaster and death rates in the industry, which are more than twice as high as those in other industries, are making it more necessary to solve chronic safety problems. Therefore, the purpose of this study is to grasp the actual condition of safety management on construction sites in South Korea and analyze cases of K-smart technology utilization for preventing safety accidents on construction sites. The study investigated and analyzed the following. First, construction sites in South Korea were analyzed by type of safety accident, by type of construction, and by construction contract amount. Second, the current status of accidents on small-sized construction sites with a high fatal accident rate and cases of safety accidents on construction sites were investigated. The results of the study are expected to contribute to the dissemination and spread of smart safety technology for not only identifying major factors in safety accidents that occur on construction sites but also preventing workers from suffering accidents.

  • PDF

A Study on the Efficient Technical Assistance for Small-sized Construction Sites (소규모 건설현장의 효율적인 기술지원 방안 연구)

  • Lee, Gi-Tae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.72-76
    • /
    • 2006
  • This study deals with problems of technical assistance through accidents analysis and questionnaires on small-sized construction sites which are difficult to understand real condition and administrate legally and indicated following efficient methods of technical assistance. (1) Ensuring access to the small-sized construction sites. (2) Delegation technical assistance service to civilian and supporting selected. (3) Raising of the person's safe consciousness concerned with the small-sized construction sites. (4) Safety consulting for the head office of small-sized construction sites.

The Effects of Activities and Working Conditions on Fire Accidents on Construction Sites

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.383-389
    • /
    • 2020
  • Accidents on construction sites involving fires do not occur as often as accidents involving falls from height or collapses. However, once a fire accident occurs, there is a high risk of a large number of casualties. Fire on construction sites is affected by working conditions and the types of activities the construction workers are engaged in at the sites. This study aims to identify activities and working conditions at construction sites that are vulnerable to fire, and analyse how they correlate with each other and how they affect the causes and consequences of fire accidents at construction sties. I analysed 40 fire accident reports and listed the situations vulnerable to fire at construction sites considering direct causes, activities, and working conditions. The most dangerous combination of fire hazards can be the heating devices used during rest/sleep in the office/cabin/storage during cold weather. The next most hazardous combination can be sparks arising from painting, waterproofing, insulation, plumbing, or welding/melting work in an underground or confined space.

A Basic Study on the Model Development of Quantitative Risk Assessment for Small and Medium-sized Construction Sites. (중소형 건설사업장의 위험 정량화 모델 개발을 위한 기초 연구)

  • Lee, Ji-yeob;Bat, Bagana;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.206-207
    • /
    • 2022
  • Currently, safety accidents in construction area are managed regardless of the size. Therefore, the objective of this study is to conduct for developing the quantitative risk assessment according to large and small and medium-sized construction sites. The scope of this study is limited to the fall accidents which is the biggest accidents in the construction sites. the regression analysis was conducted based on the collected data. As a result, it was confirmed that there was a statistically significant difference between larce and small and medium-sized construction sites. This study is expected to be used as basic data for research on the development of a risk quantitative model for small and medium-sized construction sites in the future.

  • PDF

A Study on the Intensive Safety Management Items of Small-Sized Construction Sites (소규모 건축공사 중점안전관리항목에 관한 연구)

  • Go, Seong-Seok;Song, Do-Heom;Jang, Yun-Ra
    • Journal of the Korean Society of Safety
    • /
    • v.28 no.5
    • /
    • pp.27-34
    • /
    • 2013
  • Almost accidents in construction sites are occurred by unsafe work conditions and failure making safe environment. As recent construction projects become more complex, various and diversified, So the potential of construction-related accidents is increased as well. Comparing the frequency of construction-related accidents in large-sized construction sites, small-sized construction sites are more vulnerable because of lack of workforce and less effective technology system. Furthermore, the absence of safety committee, poor financial condition leads to lack of safety education, installation of safety facilities, and provision of individual protective equipment, which indicates difficulties handling even basic safety management. Therefore, in order to lower the hazard rate at small-Sized construction sites, it is necessary to proceed with more structural and thorough actions for preventing accidents. In other words, it is necessary to analyze the causes of the accidents at small-sized construction sites, set criteria for safety management, and suggest safety management items according to work classification by evaluating the relative importance of the items.

Development of Pointcloud Data Integration Technology in Construction Sites via Drone Photogrammetry and MMS LiDAR (드론 및 MMS를 활용한 건설현장 점군 데이터 통합 기술 개발)

  • Jae-Woo Park;Dong-Jun Yeom
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_2
    • /
    • pp.1145-1153
    • /
    • 2023
  • This study presents the development of pointcloud data integration technology in construction sites via drone photogrammetry and MMS LiDAR. The integration of pointcloud data from drones and MMS technology can provide precise and accurate 3D digital maps of construction sites, which can benefit the development of smart construction and BIM. The advantages of using both drones and MMS technology for pointcloud data acquisition in construction sites are discussed, along with the limitations and challenges of using drone photogrammetry and MMS LiDAR for pointcloud data integration. The results of this study can contribute to the advancement of pointcloud data integration technology in construction sites and improve the efficiency and accuracy of construction projects.

A Suggestion for Worker Feature Extraction and Multiple-Object Tracking Method in Apartment Construction Sites (아파트 건설 현장 작업자 특징 추출 및 다중 객체 추적 방법 제안)

  • Kang, Kyung-Su;Cho, Young-Woon;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.40-41
    • /
    • 2021
  • The construction industry has the highest occupational accidents/injuries among all industries. Korean government installed surveillance camera systems at construction sites to reduce occupational accident rates. Construction safety managers are monitoring potential hazards at the sites through surveillance system; however, the human capability of monitoring surveillance system with their own eyes has critical issues. Therefore, this study proposed to build a deep learning-based safety monitoring system that can obtain information on the recognition, location, identification of workers and heavy equipment in the construction sites by applying multiple-object tracking with instance segmentation. To evaluate the system's performance, we utilized the MS COCO and MOT challenge metrics. These results present that it is optimal for efficiently automating monitoring surveillance system task at construction sites.

  • PDF

A Grounded Theoretical Study on the Experience of Preventing Safety Accidents of Workers at Construction Sites (건설현장 근로자의 안전사고 예방 경험에 대한 근거이론적 연구)

  • Park, Young-Jun;Lim, Un-Na
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.63-64
    • /
    • 2020
  • The purpose of this study is to find out how construction sites workers experience adaptation processes in relation to the prevention of safety accidents in the workplace through the method of grounded theory. In order to understand the experience of preventing safety accidents of workers at construction sites, a grounded theory analysis method was chosen. In order to achieve the purpose of this study, the first questionnaire was sent to 17 people working in the construction site by e-mail, and the participants of the study were met one by one for in-depth interviews. As a result of this study, the paradigm model of the experience of preventing safety accidents of workers at construction sites was classified into causal conditions, contextual conditions, central phenomena, intervening conditions, action/interactions, and outcomes. The conclusions of this study are as follows. First, forming a safety culture that can improve the safety awareness of construction sites is a priority. Second, it is necessary to improve self-management capabilities so that construction workers can accurately diagnose their current state such as their own body, emotion, and cognition and provide appropriate safety education. Third, providing safety education for construction workers with negative thoughts or distorted beliefs about safety accidents needs to include psychological treatment and counseling, such as methods of emotional purification, methods of relieving and managing stress, and methods of removing trauma.

  • PDF

Efficiency Analysis of the Labor Input for Safety Management in Construction Sites (건설현장 안전관리 인력투입에 대한 효율성 분석)

  • Yang, Yong Koo;Kim, Byung Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.87-96
    • /
    • 2015
  • This study analyzed the safety management efficiency through input-oriented BCC Model using DEA by making of Models, in which this study selected the number of staff affiliated with the construction site, number of staff members on the construction team, and number of safety personnel as Input Factor, along with the number of disaster victims and zero-accident accomplished hours as output elements, targeting 40-or-so apartment building construction sites which are being built by 3 domestic construction companies. As a result of efficiency, it was 0.643, the number of efficient DMU was 4. In the aspect of returns to scale, 21 construction sites(52.5%) found to be in a state of increasing returns while 14 construction sites(35%) was in a state of Decreasing returns. The reason for inefficiency was found to lie in technical factors in case of 30 construction sites(75%). Lastly, inefficient DMU is in need of 38.9 % and 66% reduction in site personnel and safety personnel. Based on study results, the 29 construction sites accounting for 72.5% of DMU for safety management efficiency evaluation object turned out to do inefficient safety management that doesn't fit the size of each company.