Study on Development of Steam Curing Method for In-situ production of Precast Concrete members (프리캐스트 콘크리트 부재의 현장생산용 증기 양생 방법 개발 연구)

  • Sung, Soojin;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.71-72
    • /
    • 2014
  • Green Frame is a building frame system to construct a column-beam structure using composite precast concrete members. To reduce the cost of producing precast concrete, in-situ production of members is required. However, when the structural members are produced on site, it needs a large space for production. So, "Just-In-Time" production method should be adopted. For Just-In-Time to be realized, the early strength of members should be ensured for them to be transported. Thus, steam curing to secure the early strength is applied in Green Frame. Yet, a large-scale steam curing system is not possible for in-situ production of precast concrete. A smaller steam curing system is needed. In this regard, the study is aimed to develop a new steam curing method applicable to the in-situ production of precast concrete.

  • PDF

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

Study on Improvement of Cost Calculation Method in Construction less than One Day Workload (1일 작업량 미만 공사의 공사비 산정 방식의 개선방안에 관한 연구)

  • Shin, Dae-Woong;Lee, Young-Do;Shin, Yoonseok;Kim, Gwang-Hee;Yoo, Sangrok;Park, Wonjun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.477-485
    • /
    • 2014
  • Standard production unit system and historical cost data are the most typical data base for calculating budget price in construction. However, these construction cost estimation methods are difficult to calculate proper construction cost because definition, additional allowance or modification criteria is not clear in construction within one day. Therefore, this study identifies problems for standard production unit system and historical cost data and suggests the improvements for them. For the objectives, this study analyzes frequency after implementing survey for 44 specialty contractors in placing at kyeonggi-province. As the results of the study, labor costs in standard production unit system and equipment costs in historical cost data and in construction of pavement and maintenance by project type was exceeded at most high rate against construction cost estimation methods. Based on this result, standard production unit system and historical cost data need to be modified by three improvements such as classification by project scale. These will be baseline data for improvement of construction cost estimation methods for less than one day workload.

Web-based Distributed Lean Construction Information System;Introduction of Lean Construction Research Center (웹 기반 분산형 린건설 정보시스템 개발;연구단 소개)

  • Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.221-228
    • /
    • 2006
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve processes of design/supply/construction phase, functioning to efficiently manage the information created at each phase and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF

A Study on the Productivity Increment through Construction of HT8 Management System for Automobile Plant in China (중국 자동차 공장의 HT8 관리체계 구축을 통한 생산성 향상에 관한 연구)

  • Lee, Doo-Yong;Jang, Jung-Hwan;Yoo, Sung-Hee;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.1
    • /
    • pp.123-128
    • /
    • 2012
  • This paper deals with the productivity increment through construction of HT8 production system for automobile factory in China. HT8 production system start to build up several management indices. The important management indices consists of organization management, location management, management of order, management of defective item, management of delivery information, and warehouse management. This HT8 production system is expected to obtain the improvement for overall organization management and reduction by 50% in warehouse cost.

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

A fundamental study for applying of Unit modular housing production system in the domestic (국내 유닛 모듈러(Unit Modular) 주택생산시스템 적용을 위한 기반 구축에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.3-11
    • /
    • 2013
  • The government has made a lot of efforts to realize 'low-carbon green growth', one of the national policy agendas, throughout the whole industries. The construction sector is not an exception, and technological developments are active to reduce energy consumption and greenhouse gas emission. In particular, buildings occupy more than 20% of the total national energy consumptions. Thus, it can be said that increasing energy efficiency of the residential buildings and reducing CO2 emission are the urgent national agenda. Moreover, as ordinary people find it more and more difficult to get a lease on housing, which has become an important social issue recently, a housing production system that can actively respond to market demands is in urgent need. To build an eco-friendly system that can maximize efficiency in construction, this study attempts to examine and analyze the modular housing production system in the county and to find its problems. By suggesting the ways to improve the system, it aims to prepare for the base to revitalize the unit modular housing production system.

Present Condition and Development of Mechanical Utility System for Modular Construction (모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구)

  • Lee, Jae-Soo;Choi, Jun-Sok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

Economic Evaluation of Underground Parking Lot PC Structural System that is Suitable for Long-Life Housing (장수명주택에 적합한 지하주차장 PC구조시스템의 경제성분석에 관한 연구)

  • Jo, Min-Joo;Kim, Jong-Sung
    • Journal of the Korean housing association
    • /
    • v.26 no.2
    • /
    • pp.103-110
    • /
    • 2015
  • Precast Concrete (PC) construction method can be the one that is suitable for long-life housing due to its merit in respect of maintenance and durability based on crack-free from mass production with indirect construction cost-saving-effect due to shortening construction period comparing to the conventional construction method, but it has the problem that causes the raise of direction construction costs. So, this study analyzed its economic feasibility of PC method whose maintenance and durability are excellent for underground parking lot of apartment house for accomplishing cost-saving long-life housing by applying the various structural system. In evaluation of unit module structural system, two-way PC system requires 10 to 28% more costs for frame work than RC rigid frames, and, one-way PC system 98~112%. Although it varies depending on the method, the costs are similar to RC rigid frame structure, provided a proper method is adopted. Also, Model 11, which was most economical in the evaluation, was applied to an real parking lot and about 2 to 6% of construction costs was reduced than RC rigid frames. This seems to be because, although PC system has a higher production cost, introduction of P.S (prestress) reduces member depth and, therefore, height, as well as the number of members per unit module.

Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction (OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출)

  • Jun, Young-Hun;Bae, Byung-Yun;Yun, Won-Gun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.