AN ANALYSIS ON THE LABOR/CAPITAL PRODUCTIVITY OF THE CONSTRUCTION INDUSTRY

  • Minsoo Choi;Jinu Kim;Moohan Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.968-973
    • /
    • 2005
  • The purpose of this study is to clarify the reality of labor and capital productivity in the construction industry through an industry-level approach and to analyze the relationship between labor and capital productivity using a Cobb-Douglas production function. According to the research results, the construction industry has shown a very high capital productivity, while labor productivity has kept up a low level during the 1980s and 1990s. The reason was because of the lack of skillful construction workers and the decrease of capital. Meanwhile, the construction productivity has greatly increased since 2000 when there was no change in wages. This was because of a large inflow of low-wage foreign workers while the amount of value added has dramatically increased due to the liberalized sale price of apartment buildings. According to the analysis by the Cobb-Douglas production function, the elasticity coefficient of V/L to K/L in the construction industry had decreased from 1.1663 in the 1st period(1971-1988) to 0.4465 in the 2nd period(1989-1997), and to 0.1664 in the 3rd period(1998-2003). Such a result means that the allocation of labor has gradually increased while the allocation of capital has decreased. Moreover there was a big increase in allocation of labor after 1998 due to the excessive deterioration of capital. In conclusion, in order to raise the construction productivity and to avoid labor-intensive production methods, investment for capital should be more increased. In particular, new machinery and equipment that can actually substitute human labor in construction sites should be more developed and applied to construction sites.

  • PDF

Evaluation of Internal Settlement of Rockfill Dam under Construction (석괴댐의 축조 중 내부 침하 거동 평가)

  • Seo, Min-Woo;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.4
    • /
    • pp.45-52
    • /
    • 2010
  • The purposes of this research are to analyze the internal settlement behavior of Concrete Faced Rockfill Dam (CFRD) typed 'D dam' and to evaluate the stability of the 'D dam' during dam construction using internal settlement measurements and results of numerical analysis. The field measurements were obtained during dam construction period. The numerical analysis was also carried out for the same construction period. The numerical analysis focused mainly on prediction of stress and displacement behavior of 'D dam' during dam construction stage using input parameters obtained from laboratory tests, i.e. large triaxial tests. The behavior of 'D dam' was evaluated to be stable from comparing the results of field measurements and numerical analysis. A simple empirical equation is also presented to predict final settlement at the completion of dam construction, using settlement measurement monitored during dam embankment.

A Case on Design and Construction of Tunnel for Under Passing an Underground Transformer Substation (지중변전실 하부통과를 위한 터널설계 및 시공사례)

  • 정동호;문상조;김선홍;이광제;석진호
    • Explosives and Blasting
    • /
    • v.19 no.1
    • /
    • pp.11-18
    • /
    • 2001
  • This is a case history on design and cnostruction of tunnel for under passing an underground transformer substation. The original construction plan was cut & cover method to avoid blasting vibrations and displacements of facilities during the construction stages. But this plan was changed to tunnel because of the difficulties from construction period, cost and the required relocation site. As a results of tunnel construction, the relocation of transformer substation and replacements of transmission cables were not necessary. Therefore about 10 months of construction period and 3.5 billion wonts of construction cost were saved. Additionally, quantitative criterion for blasting was provided through the results of blasting vibration analysis.

  • PDF

Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant (원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석)

  • Song, Hyo-Min;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

A Study on the Proposal of Passive Precast Concrete Modular Housing Development Plan in the Middle East such as Saudi Arabia (사우디 등 중동지역의 패시브형 PC모듈러 주택개발 방안 제안)

  • Lim, Seok-Ho;Chung, Joon-Soo;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.121-122
    • /
    • 2023
  • Existing modular research has been mainly focused on S (shelter structure) and I (infill interior finishing material), and considerable research has been conducted, and the results are being proposed. However, in the case of the rest (exterior materials and windows, etc.), existing construction methods and materials are borrowed, and supporting hardware members and insulation materials are constructed on site, which acts as a factor hindering overall shortening of the construction period. That is, since the advantages and characteristics of modularity cannot be utilized in the absence of modular cladding, manufacturing of cladding is required. Therefore, it is necessary to develop a cladding system that can drastically reduce the construction period in factories while considering the structural characteristics of PC modulars.

  • PDF

Cause of Schedule delay-based Constraints Analysis Process (작업지연원인 기반 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.637-642
    • /
    • 2007
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of working progress makes higher. Finding each work's constraints performs constraints analysis in process of construction for checking probability of working progress. Grasp work's constraints through the constraints analysis and removes. This research will show preventing delay of consruction project, through constraints analysis process.

  • PDF

Adjudication in Australia: A Study of Adjudication Activity in New South Wales for 2013/14

  • Brand, Michael C.;Kim, Jinu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.396-400
    • /
    • 2015
  • The Building and Construction Industry Security of Payment Act 1999 (NSW) (the NSW Act) is a unique form of statutory regulation for the building and construction industry, which gives virtually all industry participants a statutory right to, and a means of recovering, payments for work done under a construction contract. The research aim is to examine current trends in adjudication applications and determinations under the NSW Act. The data used for this study was the collected by the NSW Office of Finance & Services as part of a regular reporting regime for the period from 1 July 2013 and ending on 30 June 2014. With just over 817 adjudication applications having been made over the 2013/14 period, the data indicates that adjudication is being frequently utilized by stakeholders in the NSW building and construction industry as a means of progress payment recovery. Adjudication is proving to be a popular choice for those making claims of less than AU$250,000. Claimants were awarded about 36% of the total of claimed amounts and claimants are generally successful at adjudication in terms of the proportion of the claimed amounts determined in their favour. This is particularly so in relation to claims of less than $100,000, which represents about 70% of the total applications made over the reporting period. The data indicates that adjudication fees are generally modest enough to conclude that adjudication provides claimants across all claim ranges with a relatively inexpensive means of having disputed progress payments determined by an independent adjudicator.

  • PDF

A preliminary study on the excavation sequence of a room-and-pillar underground structure by the drill-and-blast method (발파 굴착에 의한 주방식 지하구조물의 굴착공기 분석 연구)

  • Lee, Chulho;Hyun, Younghwan;Song, Junho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.605-614
    • /
    • 2015
  • A room-and-pillar underground structure is characterized by its grid-type array of room and pillar. As a result, its construction and economical efficiency can be governed by excavation sequence. In this study, the construction period by the drill and blast method which can be treated as a main sequence for excavation was examined by considering the regulation for blasting and construction standard of estimation in Korea. To evaluate the construction period for the room-and-pillar underground structure constructed in 4 kinds of square-type area ($30{\times}30{\sim}57{\times}57m$), the concurrent excavation pattern which was suggested in the previous researches was used. From the suggested condition, the total construction period by drill-and-blast method can be estimated with the consideration of the construction area, number of jumbo drill and faces in operation.

An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period (프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구)

  • Cho, Ji-Hun;Cho, Heung-Goo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.131-139
    • /
    • 2009
  • It is critical to select the appropriate type of tower cranes for the construction of super tall buildings. However the selection is often made based on subjective personal experiences due to the lack of historical and analytical data. As a result, planning mistakes and efficiency errors sometimes occur. This research is to develop a system of hoisting analysis for appropriate tower crane selection and to provide a flexible statistical model based on the Burj Dubai project. In addition, this system hassupporting functions that can estimate the target construction period per floor, and a decision-making construction period computation method which is based on the characteristic of the selected tower cranes.

Estimation of Optimum Maintenance Cycle for the Chloride Damaged RC Structure (염해를 입은 RC 구조물의 최적 보수주기 산정 기법에 관한 연구)

  • Yun, Sun-Young;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.235-236
    • /
    • 2010
  • Since many structures in the sea environment are damaged by chloride, appropriate repair strategy is required. Therefore in the paper, optimum period for the RC structure's repair is calculated with consideration of economic efficiency. Moreover, when the concrete members are repaired with the other material such as polymer mortar forr section restoration, their expected service life also calculated to predict more accurate repair period during the life span.

  • PDF