An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period

프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구

  • 조지훈 (삼성물산 건설부문 건축기술실) ;
  • 조흥구 (삼성물산 건설부문 건축기술실)
  • Received : 2009.10.07
  • Accepted : 2009.12.11
  • Published : 2009.12.20

Abstract

It is critical to select the appropriate type of tower cranes for the construction of super tall buildings. However the selection is often made based on subjective personal experiences due to the lack of historical and analytical data. As a result, planning mistakes and efficiency errors sometimes occur. This research is to develop a system of hoisting analysis for appropriate tower crane selection and to provide a flexible statistical model based on the Burj Dubai project. In addition, this system hassupporting functions that can estimate the target construction period per floor, and a decision-making construction period computation method which is based on the characteristic of the selected tower cranes.

극 초고층 공사에서 합리적인 타워크레인 선정이 필수적이나 현장 실적 자료의 부족과 주관적인 경험에 의한 계획 수립, 체계적인 기준 부재 등으로 계획상 오류나 비효율성이 크다. 특히 극 초고층의 특성 중의 하나인 높이에 따른 영향 요소들에 대한 분석이 미비하여 단순히 장비의 기계적 특성을 가지고 양중 시간을 예측하고 있는 실정이다. 본 연구에서는 양중 계획 시 담당자가 활용하기에 용이하고 체계적인 양중 분석이 가능한 시스템을 개발 하였으며, 현존 최고층인 버지 두바이의 자료를 활용하여 가변형 통계 모델을 개발하였다. 또한 층당 적정 공기 여부를 선정한 장비를 바탕으로 검토 및 의사결정을 가능하게 함으로써 극 초고층 공기 산정 방법의 패러다임을 전환 시켰다는 의미도 있다.

Keywords

References

  1. 강경인, 서덕석, 남시대, 고층 건축물의 양중계획 합리화에 관한 연구. 대한건축학회 학술발표 논문집. 제16권 제1호 pp.447-450. 1996.4
  2. 김정진, 최인성, 초고층 건축공사의 양중계획 시스템에 관한 연구, 한국건축시공학회 논문집, 제5권 제4호, pp.121-129, 2005.12 https://doi.org/10.5345/JKIC.2005.5.4.121
  3. 이현수, 채희동, 장명훈 고층 건축공사의 타워크레인 계획 프로세스개발, 대한건축학회 논문집, 제18권 제6호, pp.119-126, 2002.6
  4. C.M Tam, W.T Leung, D.K Liu, Nonlinear Models for Predicting Hoisting Times of Tower Cranes. Journal of Computing in Civil Engineering, pp.76-81, 2002 https://doi.org/10.1061/(ASCE)0887-3801(2002)16:1(76)
  5. W.T Leung, C.M Tam, D.K Liu, Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranes. Building and Environment , pp.457-467, 2001 https://doi.org/10.1016/S0360-1323(00)00029-9
  6. W.T Leung, C.M Tam, Models For Assessing Hoisting Times of Tower Cranes. Journal of Construction Engineering and Management, pp.385-391, 1999 https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(385)

Cited by

  1. Analysis on the Structural Safety of the Tower Crane under Load vol.11, pp.10, 2010, https://doi.org/10.5762/KAIS.2010.11.10.3641
  2. A Study of the Tower Crane Hoisting Time Estimation Simulation Model with Climate Element for the High-Rise Building Construction vol.14, pp.2, 2013, https://doi.org/10.6106/KJCEM.2013.14.2.096
  3. Method to Select Tower Cranes Using Augmented Reality in Smart Devices vol.14, pp.5, 2014, https://doi.org/10.5345/JKIBC.2014.14.5.407