CONSTRUCTION COST INDEX FOR APPLYING INDEX ADJUSTMENT RATE IN THE ROAD PROJECT

  • Jin-Young Chun;Sungkwon Woo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1112-1117
    • /
    • 2005
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for adjustment of construction contract cost due to fluctuation of prices. However index adjustment rate which is used for adjustment of construction contract cost had some problems in calculating cost index of each expenditure item that could not reflect properly the change of construction cost. For supplementing these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes method of making cost index that utilizes representative items of labor, material, and equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent study. By using this method, it is expected to solve problems which were not reflected in precedent studies.

  • PDF

A Plan to Attract Graduates from Construction Education Facilities to Employment in Construction Industry by Age (건설교육기관 수료생의 연령별 건설업 취업 유인방안)

  • Ahn, Jong-Hyeok;Jeong, Hyun-Young;Kim, Hyeon Su;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.153-154
    • /
    • 2021
  • Currently, the construction industry is decreasing every year due to people's poor perception, high labor intensity, unstable employment structure, and welfare problems, as people avoid entry. Accordingly, this study investigated how to attract trainees and graduates from domestic construction education institutions to the construction industry. If institutional devices are prepared to prepare for the future by improving the welfare system such as unemployment benefits and retirement deductions in the construction industry, many trainees in their 20s and 30s will be attracted to the construction industry. If it helps expand hands-on education through on-site linkage and has the necessary technical skills for practice, it is believed that trainees and graduates in their 4s and 60s will be attracted to the construction industry.

  • PDF

Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase (시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안)

  • Lee, Jae-Hyun;Jeong, Jae-Wook;Jeong, Jae-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF

A Study on the Performance Evaluation of Form Using the Aluminum Alloy Frame Reinforced Panel (Aluminum 합금재 Frame을 이용한 벽체거푸집공법의 성능평가에 관한 연구)

  • 안재철;오상균;강병희
    • Journal of the Korea Institute of Building Construction
    • /
    • v.1 no.1
    • /
    • pp.135-142
    • /
    • 2001
  • This study is for the investigation of form using the aluminum-compound metal frame(Aluminum frame reinforced panel : AFR panel) which is improved in the capacity in the wall-concrete structure in steal of using the existing form which has problems such as, excessive exposure of cement, the loss of labor when it is constructed or disjointed, and it's economical efficiency compared with that of EURO Form. AFR panel passes the KS F 8006 test, and as a result of field test, it's displacement is satisfied with Specification. And using AFR panel is more economical than that of EURO Form because saving labor cost which plays a major part in cost saving in formwork is more effective in retrenching total cost than increment of material cost.

  • PDF

A System Development for Management of On-the-spot Using the Event Management Theory (EVENT 관리기법을 응용한 건설현장관리시스템에 관한 연구)

  • Yoon, In;Jeong, Chang-Won;Choi, Young-Sik;Yoon, Min
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.2 no.1
    • /
    • pp.113-119
    • /
    • 1999
  • In order to accomplish either information system with future estimate or scientic management, application package of integrated detail management is required for Construction Company. The application package of integrated detail management is based on management of estimation, management of account. management of tax bill, management of on the spot, management of equipment and management of labor. This research focuses on the basic survey for this system such as circumstance of information system for construction company, a barrier of progress, development dirction, development article.

  • PDF

SCHEDULING REPETITIVE PROJECTS WITH STOCHASTIC RESOURCE CONSTRAINTS

  • I-Tung Yang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.881-885
    • /
    • 2005
  • Scheduling repetitive projects under limitations on the amounts of available resources (labor and equipment) has been an active subject because of its practical relevance. Traditionally, the limitation is specified as a deterministic (fixed) number, such as 1000 labor-hours. The limitation, however, is often exposed to uncertainty and variability, especially when the project is lengthy. This paper presents a stochastic optimization model to treat the situations where the limitations of resources are expressed as probability functions in lieu of deterministic numbers. The proposed model transfers each deterministic resource constraint into a corresponding stochastic one and then solves the problem by the use of a chance-constrained programming technique. The solution is validated by comparison with simulation results to show that it can satisfy the resource constraints with a probability beyond the desired confidence level.

  • PDF

A Study on the Improvement of Construction Cost Standards for Pipe Laying and Joining Work (관 부설 및 접합공사 공사비산정기준 개선에 관한 연구)

  • Oh, Jae-Hoon;Ahn, Bang-Ryul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.675-684
    • /
    • 2020
  • To prevent safety accidents caused by aging pipe infrastructure and to maintain water quality, construction projects for water and sewage pipes are actively conducted across Korea. This study analyzed the criteria situations, site survey details, and regulation revisions related to the calculation of construction cost standards for pipe laying and joining work. The analysis showed that the major causes for revision are the unclear construction scope, limitations in implementing some pipe materials due to installation facility types, workforce focused on ordinary labor, limitations of manual laying work, and the lack of tool hire cost and machine expense-calculation criteria. Field studies were conducted to categorize the pipes according to their features, in addition to identifying the use of lifting heavy equipment and light equipment. In addition, excavation and testing work conducted in connection to pipe laying, as well as the use of skilled labor, were investigated. The current study clarified the work scope through new common items, provides an organization based on the pipe material, adjusted the workforce ratio to focus more on skilled labor, and developed grounds for calculating machine expenses. These revisions were estimated to save approximately 1.28% of the construction costs in each project according to an analysis of the construction cost impact study. truction costs in each project, according to an analysis of construction cost impact study.

Analysis of Progress Schedule and Delay Element of Frame Works in Apartments (아파트 구체공사의 공정관리 및 공기지연요소 분석에 관한 연구)

  • 최은준;최민권;조형근
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.157-160
    • /
    • 2003
  • In order to reduce the construction cost and period without degrading the quality, construction companies are making a lot of efforts to prefabricate and mechanize the construction process, and introducing and utilizing various techniques of construction time management in the process of construction. However, due to the various factors (such as weather conditions, labor factors, supply of equipment and materials, safety accident, etc) in the process of construction, construction projects are not frequently completed within the scheduled Period. This research is to examine the current status of construction time management and factors causing delay in construction with regard to the concrete work (such as form work, steel reinforcement, and concrete work) in building apartments.

  • PDF

Association between Construction Management Areas and Automation Technologies based on Correlation Analysis (상관관계 분석을 통한 건설관리 분야와 자동화기술간 연관성 분석)

  • Mun, Seong-Hwan;Cho, Kyu-Man;Kim, Tae-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.191-192
    • /
    • 2019
  • The construction industry is in the process of changing from the existing labor-intensive production system to a construction automation system using advanced information and communication technologies. Accordingly, in order to identify key research areas and utilization technologies in the field of construction automation, this study collected the latest 17 years (2000-2016) of papers published in International Symposium on Automation and Robotics in Construction (ISARC) and conducted a correlation analysis between the construction management areas and automation technologies based on the keyword frequency. As a result, the BIM, WSN, and Augmented reality were extracted as the technology keywords with high correlation with various areas of construction management.

  • PDF

CONSTRUCTION LOST-TIME INJURIES IN LAOS: AN EXPLORATORY STUDY

  • Luu Truong Van;Soo-Yong Kim;Somsana T.K.P
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.229-238
    • /
    • 2007
  • This paper presents a study on construction safety in the People Democratic Republic of Laos (PDRL). Fifty workers experienced certain injuries in their construction sites and 15 top managers were interviewed in twenty-six construction projects in Vientiane, the capital of PDRL. Research results show that stepping on and/or striking against objects (48%), struck by falling objects (24%), falling of persons (12%) are major types of construction injuries. The paper stresses that the ignorance of top managers about their crucial role in safety improvement, using safety incentive to raise safety performance, lack of thorough understanding about benefit from labor safety performance, and the willingness to cut off safety performance expenditures is considered as obstructions of safety improvement programs. The survey indicates that physical working conditions, relationship among workers, foremen behaviors and the monthly wage were influencing factors to worker's job satisfaction. The study also highlights afternoon as dominant time that led to a large number of injuries.

  • PDF