• Title/Summary/Keyword: Construction Environment Analysis

Search Result 2,067, Processing Time 0.029 seconds

Correlation Analysis between Inventory data and danger grade of Cut slope in Chungcheongdo (충청도 내 일반국도 절토사면의 현황자료와 위험도간의 상관성분석)

  • Kim, Jin-Hwan;Rhee, Jong-Hyun;Kim, Seung-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.980-983
    • /
    • 2008
  • KICT has been carrying out inventory research on the cut slopes of national roads. Inventory research results are basic data used in cut slope management system. Inventory data are classified by general status, cut slope characteristics and inspector opinion. Cut slope inventory data are utilized to figure out dangerous slopes and decide survey ranking of detailed safety diagnostication. This paper will draw dangerous cut slope and more important inventory data in Chungcheongdo via correlation analysis.

  • PDF

Analysis of CFRD(Concrete Faced Rockfill Dam) Constructed by Stages (단계축조에 의해 시공된 CFRD의 거동해석)

  • Cho, Sung-Eun;Shin, Dong-Hoon;Jeon, Je-Sung;Kim, Ki-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.583-588
    • /
    • 2005
  • In this study, a concrete faced rockfill dam constructed by stages was numerically analyzed, and the numerical results were compared with in situ measurements. The simple incremental elastic and isotropic hyperbolic model was employed to characterize the nonlinear deformation behavior of rockfill material and computational procedure followed construction sequence. A series of large triaxial tests for rockfill material were carried out to obtain mechanical input parameters. According to the analysis results, relative great additional deformation was introduced at the surface of stage-I dam body due to the loading by stage-II construction. The results reveal that numerical analysis can effectively simulate the construction processes, and some meaningful insights about the behavior of CFRD during construction were gained.

  • PDF

THE CHECKLIST FOR ENVIRONMENTAL-FRIENDLY CONSTRUCTION PROJECT MANAGEMENT IN CONSTRUCTION PHASE

  • Oh, Kyung-Taek;Jung, In-Su;Lee, Chan-Sik
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1522-1527
    • /
    • 2009
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment conservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. The purpose of this study is to propose checklist for environment management can be used in construction phase. For this, we went ahead with the research by studying the existing research related to environment-friendly construction project management both at home and abroad, investigation and analysis of environment-related laws and ordinances, and drawing the checklists for natural environment and living environment at the construction phase. As a result, we were able to compile a checklist for nine items including geological features, animals and plants, use of soil, quality of air, water, and soil, construction wastes, noise, vibration, recreation, and sceneries. The checklist is structured in 4 grades and coded so as to allow it to be developed with the use of computer system in future. We hope that the checklist presented in this study will help lead the managers at the construction phase in construction development sustainable from the perspective of environmental conservation.

  • PDF

Competitive Advantage Strategy of Construction Duration by SWOT Analysis (SWOT 분석을 통한 건설기업의 공기경쟁력 강화 전략)

  • Kim, Sun-Kuk;Lee, Hyun-Soo;Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.109-117
    • /
    • 2006
  • Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.

Factor Deduction of the Checklist for Environmental Management in Construction Phase (시공단계 환경관리를 위한 체크리스트 항목 도출)

  • Kim, Chang-Won;Lee, Myungdo;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.139-141
    • /
    • 2013
  • Construction industry has been participated in the effort for the reduction of environmental pollution such as introduction of green building certification, enactment of environment related regulation. However these efforts are focused on the design and maintenance phases of entire life cycle, construction phase that can occur intensive environmental impact in a short period is insufficient. Therefore this study aim to derive environmental management factors in construction phase and assess them using reliability analysis and factor analysis. As a results, the 20 factors was classified into 4 superordinate such as 'plan and supervision', 'environmental factor management', 'licensing management', 'surrounding environment management'.Based on result of this study, further study should be developed the checklist for effective environmental management in construction phase.

  • PDF

A Survey Analysis to Derive Priorities of Technology Developments for Automation of Construction Project (건설 프로젝트 자동화 기술개발 우선순위 도출을 위한 설문 분석)

  • Kwon, Woobin;Lee, Changsu;Ahn, Heejae;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.198-199
    • /
    • 2021
  • After the outbreak of COVID-19, the construction industry, which has more contact between workers than other industries, needs to improve its environment through the technology development for automation of construction projects. This study conducted 5-point scale surveys of 39 candidate technologies on 54 workers in construction- related industries to derive priorities for technology development to improve the construction environment. The result of this survey shows the top 10 candidate technology priorities, and this analysis can be used as basic data for setting the direction for future construction development.

  • PDF

A Case Analysis on the Brickworks and Plastering Works of the Earth Construction according to the Periodical Perspective (흙건축 공법의 시대적 관점에 따른 조적 및 미장시공 사례분석)

  • Lee, JongKook;Kim, Cheol;Kim, TaeKyung;Kim, DerkMoon
    • KIEAE Journal
    • /
    • v.8 no.2
    • /
    • pp.3-9
    • /
    • 2008
  • We intend to offer theoretical bases of earth construction technology through the analysis of cases of brickworks and plastering works in the city of Gumi, Kyeongsangbukdo. We search for those instances of earth buildings to confirm the trend that earth construction is recognized as environment-friendly, sustainable and newly spotlighted field to alternatives of building construction. We made a frame of analysis through theoretical consideration about earth construction and prior study. Then, we analyzed the selected buildings which is selected by priority in the city of Gumi as authorized preservation value, cultural assets and recently built modern constructions. We found out some problems in structural strength, durability and fire proofing and the invisible development of technologies of earth construction method in this case analysis.

Comparative Analysis of Wastewater Management Technologies for Construction Sites (건설사업장의 수질관리 기술 적용사례 비교분석)

  • Yi, JongChan;Koo, Jakon
    • KIEAE Journal
    • /
    • v.13 no.2
    • /
    • pp.157-162
    • /
    • 2013
  • To deal with the water pollution arising from the construction site, this study raises the issues of management and laws and it suggest the efficient way to reduce water pollution by through the case studies. In order to study, seven cases were selected from "Construction Environmental Management Best Practice Competition" co - sponsored by Construction Association of Korea and Construction Environment Association. As a study result, there are problems that depending on the characteristic of the construction site environment simple alone settling facilities can not handle muddy and dirty water generated by the construction site. However, when the construction site applied improved water pollution control facilities with reflecting the characteristic of muddy and dirty water. The problem can be solved moreover it can achieve exceeded emission standard. Therefore new regulations and management with water pollution control facilities considering characteristic of environment is needed to cope with water pollution arising from the construction site.

A Case Study on Cut Slope Failure due to the Geomorphological Factor (지형요인에 의한 절토사면 붕괴사례)

  • Kim, Seung-Hyun;Choi, Ji-Yong;Rhee, Jong-Hyun;Lee, Jung-Yup;Koo, Ho-Bon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.1161-1170
    • /
    • 2009
  • The Roads in Gangwon Province generally was made on purpose to use the military road. In case of these roads, tremendous dangerous cut slopes do exist and its road linear shape was badly designed. In order to make up for this situation, the government has continuously established the new road or performed the public works such as the straight line of the curved road. Soksil 2 cut slope was made through the road improvement work. This has small surface failures and collapses. In spite of dry season, this slope are leaking lots of groundwater at the unbelievable point. So as to get curious phenomenon right, we performed a detailed field investigation, the geomorphological analysis, the stability analysis considering field characteristic and ultimately proposed the countermeasure to make sure stability of Sokil 2 cut slope.

  • PDF

Evaluating Construction Market of ASEAN Nations

  • Kim, Hwarang;Lim, Jangsik;Ock, Jongho;Jang, Hyounseung
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.216-222
    • /
    • 2020
  • This research evaluated the construction market and project environment of nine nations within the ASEAN members. Quantitative data from global consulting firms and international organizations were identified and normalized for evaluation. The result of the analysis was that Indonesia was ranked highest for construction market growth while Singapore was ranked highest for stability of project environment. The research results can be utilized by construction companies that are planning on entering the construction market within the ASEAN members.

  • PDF