A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구 (A Study on Estimating the Contingency Cost of Small Construct Project)

  • 송진우;표영민;박성호;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술.기술논문발표회
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

베이시안 접근법을 이용한 생산성 관리 방안 제시 (Productivity management methodology development using Bayesian Approach)

  • 고용호;이태희;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.21-22
    • /
    • 2013
  • Construction industry has become higher, larger and more complicated. Construction projects demand precise planning and management prior and during actual operation. However, it has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly that usually results in unreliable results. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to suggest quantitative results. It has been analyzed that many studies have focused on limited data only and neglected suggesting an appropriate methodology for changing data applications. Therefore, this study suggests a methodology that effectively manages construction productivity by applying bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

건설소음진동으로 인한 가축피해현황 및 문제요인고찰 (A Study on the Damage and Problem of Domestic Animals by Noise and Vibration at Construction Site)

  • 박찬헌
    • 기술사
    • /
    • 제33권3호
    • /
    • pp.30-34
    • /
    • 2000
  • In recent years, disputes are on the increase that noise and vibration by construction equipments and blasting do damage to livestock farming families around construction sites in the construction of a road or a railway. Therefore, the following ways of improvement were presented in solving the existing problems of livestock disputes. $.$ To minimize the damage of livestock farming families by effect assessment of noise and vibration in the region expected to be damaged before the start of construction $.$ To maintain a thorough management system that can reduce noise and vibration during construction work $.$ To apply an adequate measurement method of noise and vibration taking field conditions into consideration

  • PDF

Possibility of Using the Classical Mechanics for the Preliminary Design of Laminated Composite Structures for Civil Construction

  • Kim, Duk-Hyun-
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1991년도 가을 학술발표회 논문집
    • /
    • pp.115-120
    • /
    • 1991
  • At the preliminary design stage, the orientations of laminae in a laminate are not known. This fact discourages the most of engineers from the beginning. If the quasi-isotropic constants are used, it halps the design engineer greatly to start his work. If conventional mechanics and elasticity theories can be used, the effort for design and analysis is greatly reduced. This paper reports the possibility of using the classical mechanics at the preliminary design stage for the laminated composite primary structure for civil construction. The result is quite promissing.

  • PDF

한국산업규격에 의한 피뢰설비 설계 및 시공의 문제점과 대책 (The Problems and Measures in Design and Construction of LPS based on KS)

  • 이기홍;이택섭
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2005년도 춘계학술대회논문집
    • /
    • pp.346-348
    • /
    • 2005
  • This paper presented problems occurred in design and construction of LPS(Lightning Protection System) based on the new KS(Korea Standard), and proposed various solution for those. Imperfect KS, poor data on lightning characters in Korea lack of train for engineer, immature SPD engineering and absence of LPS design sample for various buildings are main problems. We suggested that comprehensive measures attending every persons and organizations relevant LPS are needed to solve the problems.

  • PDF

풍력에너지 개발을 위한 자원평가 및 엔지니어링 설계 (Resource Assessment and Engineering Design for Wind Energy Development)

  • 김성국
    • 기술사
    • /
    • 제42권1호
    • /
    • pp.49-53
    • /
    • 2009
  • Wind energy development and wind farm construction request multi-disciplinary study and coordination to pursuit economically and technically feasible project that may deliver a viable business model. This paper is to provide the study and coordination procedure with key management factors about the wind energy resource assessment and engineering design for EPC(Engineering, Procurement and Construction) contract for the successful business development.

  • PDF

$\cdot$복도시$\cdot$혁신도시$\cdot$기업도시 건설 국가균형발전의 3대 전략사업 전망은 어떤가? (Multifunctional Administrative city, Innovation city, Enterprise city How to prospect the three leading strategic construction of balanced national development?)

  • 정무용
    • 기술사
    • /
    • 제39권1호
    • /
    • pp.58-63
    • /
    • 2006
  • How the balanced national development policy will be propelled? We study for the vision of a construction of the three leading strategic business; Multifunctional Administrative city, Innovation city, Enterprise city. The balanced regional development of our counry promotes the development of the falling behind area and solves the inefficiency of over crowding from quantitative expansion of the Metropolitan area.

  • PDF

PETRONAS TWIN TOWER 2 프로젝트의 공정관리에 관한 고찰 (A Study on the Scheduling of PETRONAS TWIN TOWER 2 PROJECT)

  • 최순묵
    • 기술사
    • /
    • 제33권3호
    • /
    • pp.59-63
    • /
    • 2000
  • The purpose of this study is to understand the method of scheduling of Petronas twin tower project. Petronas twin tower is the highest building in the world today. Kuala Lumpur City Center Berhad which is owner of Petronas twin tower, managed this construction project by use of useful scheduling techniques, that is, milestone, NSC, NS, PDM, rolling wave, hammock. Now we consider this techniques and try to apply to our construction management.

  • PDF

경부운하의 노선분석과 건설기술 (The Analysis of Routes and Construction Technologies in the Korean Grand Waterway)

  • 정동석
    • 기술사
    • /
    • 제41권2호
    • /
    • pp.51-58
    • /
    • 2008
  • In this paper is described "the water resources policy, a new paradigm of water resources control. the characteristic of rainfall in Korea and the compatibility of a new water routes opening in natural river". Also the construction of the Korean grand waterway in the view of disaster prevention, flood control, irrigation and environment-friendly transportation is needed eventually. And I detail a routes of Korean grand waterway, using of a flood gate, supply of irrigation water. cruse duration, activating under developed region and economic efficiency.

  • PDF