• Title/Summary/Keyword: Construction Document

Search Result 339, Processing Time 0.026 seconds

The Development of Next Generation Smart PMIS System (차세대 스마트형 PMIS 시스템 개발)

  • Park, Kyung-Mo;Im, Chul-Woo;Kim, Chang-Duk;Jeong, Hyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.117-130
    • /
    • 2013
  • It is a difficult thing to administer a various task in the construction site because, the person placing an order are eagerly demanding for the reduction of project duration as the trend of construction are becoming larger and international. The advanced country have made an effort to development PMIS based on the Web, which to exchanges a various construction information such as Time Management/Construction Management/Resource Management/Document Management to solve these problems since 2000. However, the expectation to develop a smart PMIS that can deal with a more quick change of a various process are becoming lager as the lively supply of IT equipment such as smart phone and table PC. The research are aim to develop the next generation smart PMIS, which is link with the table PC and smart phone for a site manager to use the system based on the web in the movement. Also, it has an object in view to introduce the development process and the major function of the next generation PMIS.

Analysis of Construction Safety Planning Tasks for Performance Improvement Using Importance Performance Analysis (IPA) Method (안전관리자 계획단계 업무 도출을 통한 난이도 및 예방효과 분석)

  • Kang, Sang Hun;Huh, Young-Ki;Kim, Dae Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.545-554
    • /
    • 2020
  • As recent safety accidents at construction sites can lead to serious accidents that threaten the lives of workers, the role of safety managers in charge of safety management has emerged. However, the current construction safety management system requires the improvement and simplification of the work contents due to the excessive workload and inefficient safety tasks of each person. In this respect, the main purpose of this study is to reduce the occurrence of construction safety accidents by deriving correlations using 2×2 Matrix analysis techniques through expert opinion, simplifying unnecessary tasks and identifying areas requiring improvement. Therefore, if this research reduces inefficient safety manager work and reduces job stress caused by excessive simple document work, thereby efficiently reorganizing safety manager's work to prevent blind spots of hazards and risks, it will ultimately have a great effect on preventing safety accidents at construction sites.

The Project and Prospects of Old Documents Information Systems in Korea (한국 고문헌 정보시스템의 구축 및 전망)

  • Kang Soon-Ae
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.31 no.4
    • /
    • pp.83-112
    • /
    • 1997
  • The purpose of this paper Is to describe the matters to plan the best information systems in Korean old books. It analyzes: i) a range of definition of old books, ii) its characteristics and current state of processing the old documents, iii) the scope of automation and building up the library institution, iv) the construction of Korean old books Information systems, v) its case study, and vi) the evaluation and vision of system. The old document information system have been organized on the basis of library networks systems with the National Central Library as leader, its implemented system has the subsystem such as cataloging system, annotation system, full-text or image-based system, and retrieval system. In case study, it is suggested two examples which has been built in the National Central Library and Sung Kyun Kwan university. finally, it provides the evaluation criteria and vision for the library which designs the old document information systems.

  • PDF

A Study on the Architectural Document and Constructions of Gimlyong-sa(金龍寺) in 17~19th Century (17~19세기 김룡사의 불사(佛事) 관련 기록물 현황과 영건(營建)활동)

  • Do, Youn-Soo;Han, Dong-Soo
    • Journal of architectural history
    • /
    • v.22 no.5
    • /
    • pp.7-22
    • /
    • 2013
  • Gimlyong-sa temple has played an important role of Buddhist culture in Gyeongsangdo Provinces(嶺南地域) in the late Joseon Dynasty as the 31st head temple(本山) in the Japanese occupation. There are lots of architectural documentary records remained nevertheless, most of cultural heritages are destroyed by fire in 1997. There were 85 articles in five kinds of books which contained historical achievements of Gimlyong-sa temple and hermitages(Daeseongam(大成庵), Hwajangam(華藏庵), Yangjinam(養眞庵), Geum seondae(金仙臺), Dosoram(兜率庵), Myeongjeogam(明寂庵)). It is possible to understand the five situational peculiarities in the 17~19th century. At the first, they were compiled in 1914 to around 1930 by Kwon Sangro(權相老) to clarify the historical facts. Second, confirmed the formation process of the foundation narrative. Third, the meaning of Seolseondang(設禪堂), Manseru(萬歲樓) and Hyangnojeon(香爐殿) were recorded, it is possible to look at the concept of people at that time. Fourth, the great masters portraits were enshrined in hermitages, not in Gimlyong-sa temple. It means that a hermitage is not for only self-discipline or living but assembly of religious orders(門派). Fifth, Chimgye(枕溪), the great Buddhist clergy and carpenter of Gimlyong-sa, was nationwide active worker in 19th century because he was also in a charge of investment manager for construction.

A Study on the FIDIC's Conditions of Contract for EPC/Turnkey Projects (FIDIC의 EPC/Turnkey 프로젝트용 표준약관(標準約款)에 관한 연구(硏究))

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.18
    • /
    • pp.189-218
    • /
    • 2002
  • The EPC/Turnkey Contract goes to the extreme in allocating risks to the contractor and depending on the types of project, this may be regarded as unacceptable. It has also gone to the extreme in the extent to which the contractor is responsible for the specification and design of the Works. The employer is not responsible for correctness of any information provided by him nor for correctness of any specification or other matter included in the Employer's Requirements, except the definition of the intended purpose and criteria for testing and performance. With such conditions it is surprising that the employer is entitled to interfere in the contractors performance to an extent that is close to what is norm for a construction contract with employer design and with normal risk allocation. The combination of risk allocation and inappropriate administrative provisions makes the EPC/Turnkey Contract a document that will meet severe resistance from contractors. It is also likely that employers will see the risks and difficulties from their own perspective. It is a fiction that the EPC/Turnkey Contract will give the employer a contact with a certainty of final price and completion date. It is not a fiction that the EPC/Turnkey Contract carries many seeds for disputes between the parties. The Orange Book has become an accepted document even if it clearly contains some weaknesses. Some of these have been corrected in the Plant Contract. In my opinion FIDIC should let users become more familiar with the Plant Contract as a follow up to the Orange Book.

  • PDF

Enterprise Architecture Framework For the Government Document Distribution Center (정부전자문서유통센터를 위한 EA 프레임웍)

  • 유은숙;정기원
    • The Journal of Society for e-Business Studies
    • /
    • v.8 no.4
    • /
    • pp.223-238
    • /
    • 2003
  • This paper presents GDOCF(Government Document Enterprise Architecture Framework) based on the direction of EA(Enterprise Architecture) framework to build GDOCEA. The construction of EA for GDOC offered various types of information technology Platform which advanced the interoperability between Government Information Systems. In addition, it insured the interoperability between the e-Government Initiatives and helped a consistent management for information resource. As a result, MOGAHA could support a policy decision and capital investment plan for information. Also, all the information needed for the operation and management of GDOC has been being referenced, shared and utilized as EA repository. Eventually Pilot EA would be a corner stone to build EA master plan considering all the information systems in MOGAHA.

  • PDF

A Study on Focused Crawling of Web Document for Building of Ontology Instances (온톨로지 인스턴스 구축을 위한 주제 중심 웹문서 수집에 관한 연구)

  • Chang, Moon-Soo
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.18 no.1
    • /
    • pp.86-93
    • /
    • 2008
  • The construction of ontology defines as complicated semantic relations needs precise and expert skills. For the well defined ontology in real applications, plenty of information of instances for ontology classes is very critical. In this study, crawling algorithm which extracts the fittest topic from the Web overflowing over by a great number of documents has been focused and developed. Proposed crawling algorithm made a progress to gather documents at high speed by extracting topic-specific Link using URL patterns. And topic fitness of Link block text has been represented by fuzzy sets which will improve a precision of the focused crawler.

Web Site Construction Using Internet Information Extraction (인터넷 정보 추출을 이용한 웹문서 구조화)

A Study on the Design Change of High-Risk Temporary Structures (재해 위험도가 높은 가설구조물의 설계변경에 관한 연구)

  • Oh, T.K.;Kim, Y.G.;Lee, M.G.;Paik, S.W.;Woo, I.S.;Song, C.G.
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.1
    • /
    • pp.37-40
    • /
    • 2014
  • Article 29(3) of Occupational Safety And Health Act, which states a contractor can request a design change to an employer of businesses under the risk condition of construction of temporary structure, was established. Accordingly, in this study, recent fatal accidents caused by temporary structures were analyzed, and the level of inclusion of temporary structures in the design document were examined, and high risk temporary structures were classified. In addition, the requirements of design change of temporary structures were presented, and the qualifications of expert to certify the design change were proposed.

The Kunjung-mun Sangryangmun of Kyunbok-koong Palace (경복궁(景福宮) 근정문(勤政門) 상량문(上樑門))

  • Seo, byung-pae
    • Korean Journal of Heritage: History & Science
    • /
    • v.34
    • /
    • pp.196-209
    • /
    • 2001
  • Kunjung-mun Gate the only existing multi-level palace gate from the Chosun Dynasty, is the main fate of Kungjung-jun, the central building of Kyungbok-koong Palace. Sangryangmun(a written record of the construction of the ridge beam) of Kunjung-mun Gate was discovered in a hole under its main beam during the renovation project on September 19th, 2000. At the time of discovery, Sangryangmun was found in its original state as a rolled up scroll. On a clould-patterned, red silk cloth, 78 cm in width and 1200 cm in length, each of all 92 lines of the Kunjung-mun Sangryangmun is comprised of either 7 or 11 brush-written, ornamental "Seal" characters. With an exception of its discoloration, the material is considered well preserved. After its discovery, the National Institute of Cultural Properties stored the document in an airtight container for a permanent preservation. In accordance to the Royal Command at the time, the Kunjung-mun Sangryangmun was composed by Kim Byungi, then written by Lee Donsang on January 19th 1867. This document records the meaning and the process of the repair effort of Kunjung-mun Gate includes the wish for peace and longevity of the Chosun Kingdom and its people.