• Title/Summary/Keyword: Construction Condition

Search Result 3,668, Processing Time 0.028 seconds

Study for Flow Phenomenon in the Circulation Water Pump Chamber using the Flow-3D Model (Flow-3D 모형을 이용한 순환수취수펌프장 내 흐름현상 연구)

  • Ha, Sung-Won;Kim, Tae-Won;Choi, Joo-Hwan;Park, Young-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.580-589
    • /
    • 2019
  • Indonesia has a very short supply of electricity. As a solution to this problem, plans for construction of thermal power plants are increasing. Thermal power plant require the cooling water system to cool the overheated engine and equipment that accompany power generation, and the circulation water pump chamber among the cooling water system are generally designed according to the ANSI (1998) standard. In this study, the design criterion $20^{\circ}$ for the spreading angle of the ANSI (1998) of the layout of the circulating water pump chamber can not be satisfied on the K-coal thermal power plant site condition in Indonesia. Therefore, 3-D numerical model experiment was carried out to obtain a hydraulically stable flow and stable structure. The Flow-3D model was used as numerical model. In order to examine the applicability of the Flow-3D model, the flow study results around the rectangular structure of Rodi (1997) and the numerical analysis results were compared around the rectangular structures. The longitudinal velocity distribution derived from numerical analysis show good agreement. In order to satisfy the design velocity in the circulating water pump chamber, a rectangular baffle favoring velocity reduction was applied. When the approach velocity into the circulating water pump chamber was occurred 1.5 m/s ~ 2.5 m/s, the angle of the separation flow on the baffle was occurred about $15^{\circ}{\sim}20^{\circ}$. By placing the baffle below the separation flow angle downstream, the design velocity of less than 0.5 m/s was satisfied at inlet bay.

Seismic Risk Assessment on Buried Electric Power Tunnels with the Use of Liquefaction Hazard Map in Metropolitan Areas (액상화 재해지도를 이용한 수도권 전력구 매설지반의 지진시 위험도 평가)

  • Baek, Woohyun;Choi, Jaesoon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.1
    • /
    • pp.45-56
    • /
    • 2019
  • In this study, the seismic risk has been evaluated by setting the bedrock acceleration to 0.154g which, was taking into consideration that the earthquake return period for the buried electric power tunnels in the metropolitan area to be 1,000 years. In this case, the risk assessment during the earthquake was carried out in three stages. In the first stage, the site classification was performed based on the site investigation data of the target area. Then, the LPI(Liquefaction Potential Index) was applied using the site amplification factor. After, candidates were selected using a hazard map. In the second stage, risk assessment analysis of seismic response are evaluated thoroughly after the recalculation of the LPI based on the site characteristics from the boring logs around the electric power area that are highly probable to be liquefied in the first stage. The third Stage visited the electric power tunnels that are highly probable of liquefaction in the second stage to compensate for the limitations based on the borehole data. At this time, the risk of liquefaction was finally evaluated based off of the reinforcement method used at the time of construction, the application of seismic design, and the condition of the site.

The Cooling Water Bypass Ratio of Packing in Plume Abatement Cooling Tower of a Combined Cycle Power Plant During Winter Operation (복합화력발전소 동계운전시 백연방지 냉각탑 냉각수의 충전재 바이패스 비율 확인)

  • Chung, Hee-Bong;Yoo, Hoseon
    • Plant Journal
    • /
    • v.14 no.4
    • /
    • pp.33-38
    • /
    • 2018
  • In this study, it was confirmed whether the cooling water bypass ratio of packing for plume abatement matched designed value during winter operation of combined cycle power plant. Designed operating wet bulb temperature of the plume abatement cooling tower with 29 Gcal/h capacity had a range from $13^{\circ}C$ to $-20^{\circ}C$, while its designed bypass ratio was from 0 % to 78%, so that increasing rate of the designed bypass ratio was $2.36%/^{\circ}C$ when the external temperature decreased. When the wet bulb temperature at cooling tower inlet had a range from $7.8^{\circ}C$ to $-11.8^{\circ}C$ in a normal operation, it was measured that actual bypass ratio of packing for plume abatement had a range from 23.8 % to 74.3%. While increasing rate of the actual bypass ratio was $2.71%/^{\circ}C$ in a range from $7.8^{\circ}C$ to $-9.55^{\circ}C$, it was $1.61%/^{\circ}C$ under $-10^{\circ}C$ in cold weather condition according to atmospheric temperature drop, therefore it was confirmed that the increasing rate of the bypass ratio for packing was lowered than its design.

  • PDF

An Analytical Study on the Slope Safety Factor Considering Various Conditions (다양한 조건을 고려한 사면안전율에 관한 해석적 연구)

  • Park, Choon-Sik;Ahn, Sang-Jin
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.5
    • /
    • pp.31-41
    • /
    • 2019
  • This paper demonstrates safety factor for effective planning at initial stage by utilizing results on changes of safety factor according to various conditions of slop and examines impacts of factors that affect slope safety factors as well. Firstly, it describes shear strength which satisfies minimum allowable safety factor: 1.20 depending on height and slope. As the height increases by 5.0 m, the safety factors decrease by 0.04 while it tends to consistently reduce by approximately 20%, 30% and 40% after height goes to 10.0 m. As slope reduces by about 0.3, the safety factors increases by 0.4, which shows the rate of safety factors on slope grows by about 10%, 20% and 30% on lowering slope. When cohesion goes up by 10.0 kPa the safety factors increases by around 40% respectably while the angle of internal friction grows by $5^{\circ}$, it increases by about 8%. The rate of safety factors is identified as $Fs=3.86H^{-0.59}$, Fs = 0.43 s, Fs = 0.04 c, $Fs=0.02{\phi}$ depending on height, slope and shear strength. The safety factor with rainfall infiltration tends to increase by 18% compared to the condition of saturated surface on earth.

Estimation of installation spacing by analyzing the lateral behavior of the safety fence fixed to rail bottom (레일저부고정형 안전펜스의 횡 방향 거동 분석을 통한 설치간격 산정)

  • Park, Seonghyeon;Sung, Deokyong;Lee, Changho;Jung, Hyuksang;Youg, Seungkyong
    • Journal of The Korean Society For Urban Railway
    • /
    • v.6 no.4
    • /
    • pp.249-257
    • /
    • 2018
  • The number of deaths for railway traffic accidents is mainly caused by working close to the track, or when unauthorized passage pass through the track. The safety fences are being used to ensure safety for workers close to the track, and to improve the efficiency of the work, without interfering with the passage of trains. However, a safety fence for railway tracks needs to be examined to see if it will interfere with the passage of trains. The purpose of this study is to analyze the safe distance between train and safety fence developed in Korea. In addition, the lateral load condition of wind pressure by trains is estimated and numerical analysis is carried out according to the installation intervals of railway safety fences. It has been confirmed that the proper spacing between the train and the railway safety fence should be at least 200 mm from the vehicle limit, and that the proper spacing of railway safety fence must be calculated in consideration of the wind pressure by trains.

A vision-based system for long-distance remote monitoring of dynamic displacement: experimental verification on a supertall structure

  • Ni, Yi-Qing;Wang, You-Wu;Liao, Wei-Yang;Chen, Wei-Huan
    • Smart Structures and Systems
    • /
    • v.24 no.6
    • /
    • pp.769-781
    • /
    • 2019
  • Dynamic displacement response of civil structures is an important index for in-construction and in-service structural condition assessment. However, accurately measuring the displacement of large-scale civil structures such as high-rise buildings still remains as a challenging task. In order to cope with this problem, a vision-based system with the use of industrial digital camera and image processing has been developed for long-distance, remote, and real-time monitoring of dynamic displacement of supertall structures. Instead of acquiring image signals, the proposed system traces only the coordinates of the target points, therefore enabling real-time monitoring and display of displacement responses in a relatively high sampling rate. This study addresses the in-situ experimental verification of the developed vision-based system on the Canton Tower of 600 m high. To facilitate the verification, a GPS system is used to calibrate/verify the structural displacement responses measured by the vision-based system. Meanwhile, an accelerometer deployed in the vicinity of the target point also provides frequency-domain information for comparison. Special attention has been given on understanding the influence of the surrounding light on the monitoring results. For this purpose, the experimental tests are conducted in daytime and nighttime through placing the vision-based system outside the tower (in a brilliant environment) and inside the tower (in a dark environment), respectively. The results indicate that the displacement response time histories monitored by the vision-based system not only match well with those acquired by the GPS receiver, but also have higher fidelity and are less noise-corrupted. In addition, the low-order modal frequencies of the building identified with use of the data obtained from the vision-based system are all in good agreement with those obtained from the accelerometer, the GPS receiver and an elaborate finite element model. Especially, the vision-based system placed at the bottom of the enclosed elevator shaft offers better monitoring data compared with the system placed outside the tower. Based on a wavelet filtering technique, the displacement response time histories obtained by the vision-based system are easily decomposed into two parts: a quasi-static ingredient primarily resulting from temperature variation and a dynamic component mainly caused by fluctuating wind load.

Properties of Glass Melting Using Recycled Refused Coal Ore (선탄 경석 재활용 원료를 이용한 유리 용융 특성)

  • Lee, Ji-Sun;Kim, Sun-Woog;Ra, Yong-Ho;Lee, Youngjin;Lim, Tae-Young;Hwang, Jonghee;Jeon, Dae-Woo;Kim, Jin-Ho
    • Korean Journal of Materials Research
    • /
    • v.29 no.11
    • /
    • pp.727-733
    • /
    • 2019
  • In this study, the glass melting properties are evaluated to examine the possibility of using refused coal ore as replacement for ceramic materials. To fabricate the glass, refused coal ore with calcium carbonate and sodium carbonate in it (which are added as supplementary materials) is put into an alumina crucible, melted at $1,200{\sim}1,500^{\circ}C$ for 1 hr, and then annealed at $600^{\circ}C$ for 2 hrs. We fabricate a black colored glass. The properties of the glass are measured by XRD (X-ray diffractometry) and TG-DTA (thermogravimetry-differential thermal analysis). Glass samples manufactured at more than $1,300^{\circ}C$ with more than 60 % of refused coal ore are found by XRD to be non-crystalline in nature. In the case of the glass sample with 40 % of refused coal ore, from the sample melted at $1,200^{\circ}C$, a sodium aluminum phosphate peak, a disodium calcium silicate peak, and an unknown peak are observed. On the other hand, in the sample melted at $1,300^{\circ}C$, only the sodium aluminum phosphate peak and unknown peak are observed. And, peak changes that affect crystallization of the glass according to melting temperature are found. Therefore, it is concluded that glass with refused coal ore has good melting conditions at more than $1,200^{\circ}C$ and so can be applied to the construction field for materials such as glass tile, foamed glass panels, etc.

Numerical Simulation on Control of Tsunami by Resonator (I) (for Imwon and Mukho ports) (공진장치에 의한 지진해일파의 제어에 관한 수치시뮬레이션(I) (임원항과 묵호항에 대해))

  • Lee, Kwang-Ho;Jeon, Jong-Hyeok;Kim, Do-Sam;Lee, Yun-Du
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.32 no.6
    • /
    • pp.481-495
    • /
    • 2020
  • After the resonator on the basis of the wave-filter theory was designed to control the waves with a specific frequency range surging into the harbor, the several case with the use of resonator have been reported in some part of sea, including the port of Long Beach, USA, and yacht harbor at Rome, Italy in order to control the long-period wave motion from the vessels. Recently, the utility and applicability of the resonator has been sufficiently verified in respect of the control of tsunami approximated as the solitary wave and/or the super long-period waves. However, the case with the application of tsunami in the real sea have not been reported yet. In this research, the respective case with the use of existing resonator at the port of Mukho and Imwon located in the eastern coast of South Korea were studied by using the numerical analysis through the COMCOT model adapting the reduction rate of 1983 Central East Sea tsunami and 1993 Hokkaido Southwest off tsunami. Consequently, the effectiveness of resonator against tsunami in the real sea was confirmed through the reduction rate of maximum 40~50% at the port of Mukho, and maximum 21% at the port of Imwom, respectively. In addition, it was concluded that it is necessary to study about the various case with application of different shape, arrangement, and size of resonator in order to design the optimal resonator considering the site condition.

The Engineering Characteristics of the Sludge Mixed Soil (슬러지 혼합토의 공학적 특성)

  • Kim, JungUn;Kim, MyeongKyun;Bae, WooSeok
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.5
    • /
    • pp.43-50
    • /
    • 2011
  • As a result of population growth and economic growth, household and industrial wastes continue to rapidly increase every year. Especially, sewage sludge produced at final stage is increasing with the constant construction and putting in good order of the sewage plant. In addition to the government's prohibition for filling up the sludge, it became more and more difficult to discharge wastes to the sea as London Dumping Convention '96 came into effect. And sewage sludge and the livestock wastes are expected to be thoroughly prohibited from discharging to the sea from 2012. So we need desperately economical and useful alternatives to compact and reuse these wastes. The purpose of this study is to evaluate the utilization of solidified sludge-soil mixture as an enhancement and covering material. To determine the proper mixed ratio of solidified sludge, this study conducted basic physical properties tests, compaction tests, uniaxial compression tests, and permeability test. It was found that the higher the ratio of solidified sludge, the lower the coefficient of permeability. Upon the results of particle size distribution, the mixed ratio of solidified sludge that meet the enhancement material condition was 59% or lower for SP granite soil and 48% or lower for SM granite soil respectively.

Dredging Material High Efficiency Transport Technology Test by Using the Electro Magnetic Field and Development of the Technical Design Manual (전자기장을 이용한 준설토 고효율 이송기술 실증 및 기술 지침 개발)

  • Kim, Dong-Chule;Kim, Yu-Seung;Yea, Chan-Su;Kim, Sun-Bin;Park, Seung-Min
    • Journal of Coastal Disaster Prevention
    • /
    • v.5 no.4
    • /
    • pp.173-182
    • /
    • 2018
  • As the research about increasing the efficiency of dredging soil transport, the technology, which reduce the friction between pipe wall and fluid in the pipe and disturbed generating pipe blockage, has been developed. So for the purpose of applying this technology to real construction site, main test has been tried at the real scale test in field. As a test result, this paper will show 30% flow efficiency increasing by permitted electro magnetic force to the pipe. And test result was evaluated as a ultra sonic velocity profiler. To propose the design technique and the execution manual of the high efficiency dredging material transport technic, this research have confirmed flow status changing depending on a soil material kind under electro-magnetic field and analyze the effect of electro-magnetic field which affects to each dredged soil material transportation. For achieving this research, EMF(Electro-Magnetic Field) generator is installed on the dredger(20,000HP) and through monitored flow status, dredging soil flow rate and sampled material specification is confirmed. Also dredger operating condition is measured and dredger power for soil transportation, hydraulic gradient and flow rate are compared, as transportation efficiency is calculated by this parameter, it is possible to check transportation efficiency improvement depending on each dredged soil material under electro-magnetic field. To verify the technique of dredged soil transfer using electromagnetic field, which is the core technique of the high efficiency dredged soil transfer, and the technique of expert system for pipeline transfer and the flow state. This could lead to a verification of transfer efficiency according to the characteristics of the dredged soil (sand, clay, silt) and the transfer distance (5km, 10km, 15km), which is planned to be used for a technology development of pump power reduction and long-distance transfer applying the high efficiency dredged soil transfer technology.