Work Condition Analysis Process for Improving Reliability of Work Plan (작업계획의 신뢰도 향상을 위한 작업여건분석 체계)

  • Song, Ji-Won;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.36-44
    • /
    • 2009
  • The sum of each work duration are entire period in construction project. Each work occurs to be late, the total period of construction project will delays. Therefore, the total period of construction project will not be delayed if probability of work progress makes higher. Finding each work constraints performs constraints analysis in process of construction for checking probability of work progress. Grasp work constraints through the constraints analysis and removes. This research will show preventing delay of construction project, through work condition analysis process.

A Study on Structural Performance by Condition Grade of Temporary Equipment (가설기자재 상태등급별 구조성능에 관한 연구)

  • Moon, Seong-Oh;Mo, Seung-Un;Youn, Ye-Bin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.16-17
    • /
    • 2020
  • The Temporary construction refers to the construction or dismantling of temporary structures installed for the construction of the main structure at the construction site, and the members constituting this temporary facility are called temporary equipment. Temporary equipment used in construction sites is mostly used products that are reused rather than new products, and it is necessary to consider performance degradation due to repeated use. This study is a preliminary study to develop the performance evaluation criteria applied to temporary equipment that is distributed and reused for secondhand. This study is to analyze the performance status of temporary equipment of used goods owned by rental companies by condition grade through performance tests.

  • PDF

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(II) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(II))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.248-259
    • /
    • 2010
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces one example of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. The characteristics of ground deformation and strut axial force change, the measured data obtained during construction process, were analysed, the effects of relatively deeper excavation than the specification on one excavation side and rapid drawdown of ground water level on the other excavation side were deeply investigated from the viewpoint of mutual influences between ground deformations of both excavation sides and strut axial force changes. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Anticorrosive Monitoring and Complex Diagnostics of Corrosion-Technical Condition of Main Oil Pipelines in Russia

  • Kosterina, M.;Artemeva, S.;Komarov, M.;Vjunitsky, I.;Pritula, V.
    • Corrosion Science and Technology
    • /
    • v.7 no.4
    • /
    • pp.208-211
    • /
    • 2008
  • Safety operation of main pipelines is primarily provided by anticorrosive monitoring. Anticorrosive monitoring of oil pipeline transportation objects is based on results of complex corrosion inspections, analysis of basic data including design data, definition of a corrosion residual rate and diagnostic of general equipment's technical condition. All the abovementioned arrangements are regulated by normative documents. For diagnostics of corrosion-technical condition of oil pipeline transportation objects one presently uses different methods such as in-line inspection using devices with ultrasonic, magnetic or another detector, acoustic-emission diagnostics, electrometric survey, general external corrosion diagnostics and cameral processing of obtained data. Results of a complex of diagnostics give a possibility: $\cdot$ to arrange a pipeline's sectors according to a degree of corrosion danger; $\cdot$ to check up true condition of pipeline's metal; $\cdot$ to estimate technical condition and working ability of a system of anticorrosive protection. However such a control of corrosion technical condition of a main pipeline creates the appearance of estimation of a true degree of protection of an object if values of protective potential with resistive component are taken into consideration only. So in addition to corrosive technical diagnostics one must define a true residual corrosion rate taking into account protective action of electrochemical protection and true protection of a pipeline one must at times. Realized anticorrosive monitoring enables to take a reasonable decision about further operation of objects according to objects' residual life, variation of operation parameters, repair and dismantlement of objects.

An Experimental Study about Fire Resistance effect on Boundary Condition of CFT Column under Loading in Fire (CFT기둥 재하가열 실험에서의 경계조건에 따른 내화성능 영향에 관한 실험적 연구)

  • Kim, Hyung-Jun;Kim, Heung-Youl;Park, Kyung-Hun;Cho, Kyung-Suk;Kwon, In-Kyu
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2010.04a
    • /
    • pp.389-394
    • /
    • 2010
  • A concrete filled square steel tube (CFT) is composed of the external steel material, which its strength is reduced in fire due to sudden temperature increase, and the internal concrete with high thermal capacity that can ensure the fire resistance performance of the structure. Therefore, research about the influence factors of the structural performance of CFT column is required in order to apply CFT column to a fire resisting structure, and additional research about influence for each condition is also necessary. Among the influence factors, the boundary condition between column and beam is important structurally, and it is one of the major factors that determine overall fire resisting performance. This study performed a fire experiment under loading in order to analyse the influences of CFT column to the boundary condition. As the results of the experiment, fire resistance time of 106 minutes was ensured for the clamped-end condition but 89 minutes for the hinge-end condition in case of the 360 cross section. And, fire resistance time of 113 minutes was ensured for the clamped-end condition but 78 minutes for the hinge-end condition in case of the 280 cross section. The difference in the fire resistance performance according to changes in the boundary conditions showed a tendency that larger change effect on the fire resistance performance was derived from smaller cross section area.

  • PDF

Analysis of Field Condition for Proper Waterproofing Materials applied to Green Roof System for Depot (도시철도 차량기지의 기반녹화에 적합한 방수시스템 선정을 위한 환경 조건 분석)

  • Min, Kwang-Man;Kwon, Shi-Won;Choi, Sung-Min;Kwak, Kyu-Sung;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.127-131
    • /
    • 2006
  • Depot have a lagged behind structure in the side of building up the view. With this reason, people have been recognized depot as hatred facility causes to have car noise, air pollution. In the other hand, depot become a underground and complex facility as a higher-value added building, and moreover, it need to understand the environment that depot structure have a specific field condition to apply green roof system. 1) Analysis proper waterproofing material and root barrier apply to depot need root penetrating test method 2) Suggest root barrier and waterproofing material relate to maintain and construction for green roof system 3) Construction condition for depot have crack movement of structure by vehicle vibration and root penetrating force by plant growth

  • PDF

A Literature Review of Unmanned Aircraft System (UAS) Integrated Constructed Facility Condition Inspections (무인항공체계 기반 시설물 상태점검 최근 연구동향 분석)

  • Kwon, Jin-Hyeok;Yun, Jiyeong;Youn, JongYoung;Lee, Donghoon;Kim, Sungjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.172-173
    • /
    • 2021
  • In recent, unmanned Aircraft Systems (UAS) have been widely used for various purposes, such as safety inspection, facility condition inspection, progress monitoring, in the architecture engineering, and construction (AEC) industry. This technology can provide visual assets regarding the conditions of construction jobsites as well as constructed facilities during flying over the point of interests. With the significant interests in this advancement, the recent studies have presented how the UAS can be applied fro different types of facilities (e.g., buildings, power genereation systems, roads, or bridges) to inspect the current conditions of them for safe operations as well as public's safety. This study reviewed the receent studies to document their scientific findings and practical contributions, as well as provided the overview of further implications for future studies.

  • PDF

The Study On The Actual Condition Of Rebar Work In Korean Building Construction (국내 건설 현장의 철근공사 실태조사에 관한 연구)

  • 이응균;박우열;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

A Study on the Effect of the Construction Conditions on a Thermal Crack of Mat Foundation (매트기초의 온도균열에 미치는 시공조건의 영향에 관한 연구)

  • Lee, Do-Bum;Kim, Hyo-Rak;Choi, Il-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.11a
    • /
    • pp.1-4
    • /
    • 2003
  • Recently, a structure has been larger and higher under the improvement of construction technique. So, a concrete constructions that a mat foundation thickness of structure is over 80cm have been many. Also, because of the reason high strength concrete, the matter of thermal crack have become an important task to be solved absolutely. In a cause a thermal crack occurrence, there used, mixture of concrete, construction and so forth. In this study, we executed temperature and stress analysis of mat foundation to know the effect the construction condition a thermal crack of mat foundation. And we evaluated quantitatively about the occurrence possibility of thermal crack using the hydration heat analysis program. By using of this analysis technique, will can control skilfully the quality of a mat foundation in advance.

  • PDF

Critical financial variation of ratios between healthy and workout construction firms

  • Im, Haekyung;Choi, Jaehyun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.354-356
    • /
    • 2015
  • As domestic recession has had an adverse impact on many Korean companies in Korea, financial soundness has become a critical issues. It is essential to identify financial risk factors to prevent workout as well as to improve the financial condition of domestic construction companies. Therefore, this study derived important management indicators and the financial ratios that belong to each indicator through a comparative analysis between healthy companies and workout companies with financial statement. As a consequence, key financial ratios are derived into 3 of 25 ratios; Equity Ratio in stability indicator, Total Asset Turnover Ratio in activity indicator, and Labor Equipment Ratio in productivity indicator. So, Korean construction firms are required close monitoring these critical financial ratios indicating variation between construction companies which have opposing statuses in finance in order to keep sound financial condition and increase productivity.