Proceedings of the Korean Institute of Building Construction Conference
/
2016.10a
/
pp.71-72
/
2016
Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.
Kim, Chang-Kyu;Song, In-Shick;Lee, Hyun-Soo;Lim, Sang-Chae
Proceedings of the Korean Institute of Building Construction Conference
/
2008.05a
/
pp.111-115
/
2008
The productivity is the one of the primary elements to evaluate the new systems performance for building construction along with the economic efficiency, the safety, and the quality improvement. At present the on-site construction automation systems(we will call it as Construction Factory or CF hereafter) is under the development by research group for construction automation of high-rise building. The system includes many sub-systems such as a robotic crane, a construction factory, bolting robots, a building material management system using RFID and so on. In this study we discuss and propose the method to evaluate for these hybrid on-site automation system fundamentally. In future we devise a framework of evaluation modules for the on-site building automation system on the basis of this discuss.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.307-309
/
2012
Construction Materials are the key elements determining the quality of buildings. The major purpose of this study is to provide basic data analysis for leveraging domestic construction material information systems. The study implements a comparative analysis by categorizing the construction material information systems into several detailed areas. The research results specify the limitations of current construction material information systems and derive required research areas for practical applications throughout a construction project life-cycle.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05b
/
pp.103-108
/
2010
The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.05a
/
pp.76-77
/
2019
Currently, there is a lack of studies on the directionality of architectural engineering education. This study has analyzed the opening and operation of courses relating to building construction in Korea universities. It was researched that the most common building construction courses opened in universities were 'building construction' and 'materials.' Courses are also being opened in universities by reflecting social demands. Upon analysis of the operation of the educational process of building construction, it was displayed that projects and examinations were conducted as the methods of assessment in courses at many universities. Additionally, there were universities that included quizzes and discussions in their methods of assessment. This study is expected to be used as data for studying an innovative means of educating architecture.
Proceedings of the Korean Institute of Building Construction Conference
/
2018.11a
/
pp.63-64
/
2018
The construction industry is one of the most prolific disaster-prone industries, particularly those that suffer from falling disasters compared to other industries. The safety accident at the construction site leads to social problems caused by massive loss of life and property, so it needs to be extra careful. The reason why falls are the most frequent accidents of the types of construction accidents is due to the analysis of the risk factors of safety accidents and the development of various construction methods. Therefore, in this study, the accident case for the fallen victims of construction site was analyzed and the risk factor was selected. Based on the safety expert survey, an importance analysis was performed. In conclusion, this study analyzes various risk factors that affect the occurrence of falls, identifies the importance of each factor, and presents basic data for safety accident prevention activities.
Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.200-201
/
2015
As manpower shortage of national construction site is continuing, a manpower of foreign laborers are steadily increasing. The construction industry impacts the purpose for productivity of laborers as labor-intensive industry against different industry. Therefore, there is a need of analysis of foreign laborer's productivity. This study analyzes to use foreign labor's psychological productivity factors as a basic standard by comparing to Korean's. Construction foreign laborers seem to put bigger priority on "accomplishment of task," and "job satisfaction," than Korean workers, according to the response results in Likert 5-point Scale Measurement with 11 kinds of psychological causes in theories regarding productivity factors. Thus, this study expects to use as baseline data for productivity management of construction foreign laborers.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.11a
/
pp.193-198
/
2009
It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.
Journal of Construction Engineering and Project Management
/
v.6
no.1
/
pp.20-25
/
2016
With the multitude of variables that may play a role in a company's Lean journey, it is becoming more understood that leadership plays a significant role in implementing lean principles on construction projects. The goal of this research is to investigate the relationship between leadership and Lean Construction implementation. The research uses a quantitative research in which a survey was conducted, followed by a statistical analysis to test the hypothesis. Through the statistical analysis of survey data, the research finds that there is positive relation between the level of transformational leadership and the effectiveness of lean implementation. When an organization is implementing organizational change like Lean, traits of leaders must not be underestimated. The study findings may contribute to the knowledge of lean construction leadership by bridging the gap between leadership and the effectiveness of lean implementation.
Each year the amount of construction wastes increases at a rapid pace. Particularly, wastes from apartment housing projects that make up 89.14% of the total construction projects have increased about 48% as compared with those of the year 2000. Construction wastes are therefore rising as an issue related to environmental problems and disposal costs. And there are ongoing studies of the disposal, control and recycling of construction wastes. Mitigation measures for the wastes, however, have been a rare subject of research that focuses on waste-generating factors by activity during apartment housing projects. Given that, the purpose of this study was to categorize construction wastes by work type and to identify the factors causing wastes in order to reduce them. This study investigated the amount of the wastes from apartment housing constructions by activity as related to disposal costs, and examined causes in the ordering, transport, material management and construction stage, respectively. The analysis results will likely bring about expectation effects that help reduce the generation of the wastes by establishing action plans.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.