• Title/Summary/Keyword: Connection Plan

Search Result 479, Processing Time 0.029 seconds

A Study on fostering strategy for Port Equipment industry (스마트항만 구축을 위한 항만장비산업 육성 방안 연구)

  • 김보경;한승훈;안승현
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2023.05a
    • /
    • pp.108-109
    • /
    • 2023
  • The purpose of this study is to set a policy that can be specifically promoted according to the recently announced domestic equipment industry fostering strategy, and to suggest a plan that can be implemented. As a plan to foster the equipment industry, a new technology certification system and a new technology test and verification area operation and vitalization plan were set as alternatives. And a survey was conducted on companies conducting R&D to derive specific demand and introduction plans. As a result of the survey, it was found that there was a high demand for the use of new technology certification systems and testing and verification area. Also demonstration in connection with port equipment, testing and evaluation in connection with accredited verification agency, and preparation of dedicated agencies were derived to foster the equipment industry. Based on this, this study suggests a new technology certification system specialized for port equipment was established and a plan to institutionalize. In addition, in connection with the survey results and certification system, the basic functions and roles of the new technology testing and verification area was established. For future activation, incentives with effective certificates such as exemption of certification costs and issuance of performance confirmation certificates are needed, and efficient operation and management through dedicated organization and certification center were suggested.

  • PDF

The Evaluation of Connectivity between Natural Environment (Forests and Rivers) and Neighborhood Parks Inside Cities in Gyeonggi-do (도시 내 자연환경(산림, 하천)과 근린공원의 연결 현황 평가 및 연결방안)

  • Sung, Hyun-Chan;Kim, Su-Ryeon;Kang, Da-In;Hwang, So-Young
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.18 no.5
    • /
    • pp.49-59
    • /
    • 2015
  • In this research, the connectivity status between natural environment (forests and rivers) and urban parks in view of ecological networks in a city is evaluated and on the basis of these evaluation results, a future connectivity enhancing recommendations are suggested. As a result, the 96.8% of the connectivity role of the neighborhood parks were core or connected parks and as in terms of the ecological pattern on the outer park, 84.1% of the case neighborhood parks were connected to the ecological element at least one side. Therefore, it can be expected to play a role as corridor that enables the direct connection with the natural environment if the connection plan is well established. As a result of connectivity evaluation of the parks, inside of the parks had low ecological element overall and had low connectivity, outside of the parks had 1.5 times more of low connectivity parks than high connectivity parks, and had similar disconnections such as facilities(fence, soundproof walls, breast walls, etc.), developments(roads, apartment complexes, industrial complexes, etc.), or poor greens regardless of the neighborhood with the ecological elements. To increase the connectivity of ecological network, the cities already built shall secure primarily green territory where can connect with the isolated park due to the surrounding with the developing areas and when planning for new cities or residential complexes, it shall establish a connection plan with the nearby at the beginning.

A Study on the Strategy of Sustainable Hospital Architecture Masterplan (지속가능한 병원건축 마스터플랜 전략에 관한 연구)

  • Park, Cheolkyun;Yang, Naewon
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.26 no.4
    • /
    • pp.15-26
    • /
    • 2020
  • Purpose: The purpose of this study is to derive a plan to establish a more sophisticated master plan so that the direction of master plan study can be sustained in the mid to long term. Methods:: Compare and analyze the differences between the master plan and the design to identify causes and problems. First, after establishing the master plan, compare the expansion area, net area per bed, and service area with the design drawing of the first project to determine the degree of recovery to the level required by the recent medical environment. Second, the possibility of responding to future internal changes is reviewed by comparing and analyzing the arrangement and connection method of extension buildings. Third, comparing the difference between the project following the first project and the phased of masterplan. Results: The first one is that continuous participation of person or group with high understanding of the master plan. Second, establishing a master plan and proceeding with the project through the determination of the correct business budget. Third, a specific area of the mechanical and electrical room suitable for the size and purpose of the hospital should be presented, and research on the arrangement method should be conducted. Finally, the feasibility of the hospital's own plan for securing parking facilities should be accurately investigated. Implications: It is important for the hospital to recover from the past to the present and respond to the future that the direction of the master plan continues after the establishment.

A Landscape Planning of Multi-purpose Dam in Hwabuk (화북 다목적댐 조경계획)

  • Ahn Gye-Dong;Kim Yong-Geun;Min Kwon-Sik;Kang Hyun-Kyung;Kwon Jeon-O;Shin Ji-Hoon
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.34 no.1 s.114
    • /
    • pp.107-119
    • /
    • 2006
  • The Korea Water Resources Corporation(KOWACO) proposed bidding for an alternative design for Hwabuk Multi-purpose Dam in March of 2004. The site is located in Hakseong-ri, Goro-myeon, Gunwi-gun, Gyeongsangbuk-do and has adrainage area of $87.52km^2$. The purpose of this project is to establish an environmentally friendly plan for minimizing the damage that was caused by the construction of the Hwabuk Multi-purpose Dam. The design principle of KOWACO was the restoration of the natural environment, a harmonious landscape, and the creation of a space of regional and local culture. The basic concept of this project involves an ecological-restoration axis and a functional-connection axis. The site is divided into four spaces: (1) the space of memory and symbol, (2) the space of nature and ecology, (3) the space of regional and local culture, and (4) the space of the regional economy. There are four sub-spaces in the space of memory and symbol: the track forest, the time forest, the memory room, and the sun plaza. There are three sub-spaces in the space of nature and ecology: the habitat of aquatic birds, the wind forest, and the eco-corridor. There are five themed parks in the space of regional and local culture: the culture and relic room, the wildflower garden, the ecological pond, the insect observation park, and the pyogo maze. There are three areas in the space of the regional economy: the forest pension, the waterside pension, and the community center, as Dungdungi village was reorganized to serve as a lodging complex. These themed parks, working together, can offer an effective space for nature, culture, rest, and experience.

Improvement plan for Function Definition using CAFAT in the Construction VE (건설 VE에서 CAFAT을 이용한 기능정의 개선방안)

  • Choi, Chang-Hoon;Kim, Soo-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.102-111
    • /
    • 2006
  • In the analysis of function, which is the core and early phase among the procedure of construction VE Job Plan, the accuracy of function definition directly connects to VE result. However, the method of defining function, which is currently used is not accurate and comprehended or is difficult to utilize it systematically. Also, there is not a clear definition about the function for selecting VE so that many difficulties occur in the organic connection between each of functions in the summarization of function after defining function. Therefore, this study cleared the definition of function and made up any counter measured problem occurred in FAST Diagram later on and suggested CAFAT(Combined Antithetic Function Analysis Technique) in order to induce better phase in functional analysis.

The Professors' Perception of Blended Learning through Network Analysis of Keyword: Focusing on Reflective Journal (키워드 네트워크 분석을 통한 블렌디드 러닝 수업에 대한 인식연구: 성찰일지를 중심으로)

  • Lee, Jian;Jang, Seonyoung
    • Journal of Information Technology Services
    • /
    • v.21 no.3
    • /
    • pp.89-103
    • /
    • 2022
  • The purpose of this study is to explore professors' perception of blended learning. For this purpose, the reflective journals written by 56 university professors was analyzed using the keyword network analysis method. The results of this study are as follows: First, as a result of keyword frequency analysis for the blended learning, the keywords showed the highest frequency in the order of (1) 'instructional design', 'student', 'instructional method', 'learning objective' in the area of learning, (2) 'importance', 'instruction', 'feeling', 'student' in the area of feeling, and (3) 'semester', 'plan', 'weekly', and 'instruction' in the area of action plan. Second, the results of analyzing the degree, closeness centrality, and betweenness centrality of network connection are as follows. (1) The keywords 'instruction', 'instructional method', 'instructional design', and 'learning objective' in the area of learning, (2) the keywords 'instruction', 'importance', and 'necessity' in the area of feeling, and (3) 'instruction', 'plan', and 'semester' in the area of action plan showed high values in degree, closeness centrality, and betweenness centrality. Based on the research results, implications for blended learning and professors' perception were discussed.

Development and Application of Lattice Shear Reinforcement for Flat Plate Slab-column Connection (래티스를 이용한 철근콘크리트 무량판 구조의 슬래브-기둥 접합부 전단보강 공법 개발)

  • Kang, Su-Min;Park, Sung-Woo;Bang, Joong-Seok;Lee, Do-Bum;Kwon, Chul-Hwan;Park, Hong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.5
    • /
    • pp.482-490
    • /
    • 2013
  • Although the flat plate system is an efficient structural type due to the simplicity of its construction, the low story height, and the various plan design, the slab-column connections are vulnerable to punching shear failure from gravity load and eccentric shear failure from lateral load. To prevent the structure collapse, various construction methods of slab-column connection reinforcement are developed but none of these satisfies all of structural performance, economics, and constructability. This paper presents the reinforcement of slab-column connection with lattice bars. The structural performance is confirmed with the interior slab-column connection tests subjected to cyclic loading, and the economic feasibility is demonstrated from the structural design under the same condition with lattice bars, stud rails, and stirrups.

A Study on Improvement of Connection Method of Underground Parking Lot SP Equipment Water Supply Pipe for Effective Fire Activities (효과적인 소방활동을 위한 지하주차장 스프링클러설비 송수배관 연결방식의 개선에 관한 연구)

  • Son, Gae-Seong;Choi, Ji-Hun;Choi, Don-Mook
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.4
    • /
    • pp.161-169
    • /
    • 2015
  • A fire sprinkler system is very important to extinguish fire in the building. The sprinkler system initiates sprinkler discharge if the detection system identifies a developing fire and opens the pre-action valve. However, pre-action fire sprinkler systems mainly installed in the underground parking lot at the apartment complex do not properly operate at fire if the connection type of fire sprinkler systems does not properly installed and operated. This study identified the relationship between fire dispersion & damage and the connection type of water supply in the sprinkler system from many fire cases at the apartment complex in South Korea. In addition, this study also identified the water supply differences and characteristics between South Korea and foreign countries. The main purpose of this study is also to improve the water connection types in the sprinkler system that can reduce the potential failures of pre-action valve operation through electrical signal system. The study also suggests the improvement plan for water connection types in pre-action fire sprinkler system that can minimize potential failure of pre-action fire sprinkler system. The suggestions for revising the fire safe standard in South Korea includes letting the water supply pipe of sprinkler system water inlet connect to the second side of pre-action valve and the water flow device that can minimize potential failure of sprinkler system.

Developement for Pretreatment System of Distributed Power Generation by using Livestock BIO-ENERGY (축산폐기물 바이오 에너지 분산발전용 전처리시스템 개발)

  • Hur, Kwang-Beom;Park, Jung-Keuk;Lee, Jung-Bin;Rhim, Sang-Gyu;Kim, Jae-Hoon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.585-588
    • /
    • 2007
  • As the distributed generation becomes more reliable and economically feasible, it is expected that a higher application of the distributed generation units would be interconnected to the existing grids. This new generation technology is linked to a large number of factors like economics and performance, safety and reliability, market regulations, environmental issues, or grid connection constrains. KEPCO (Korea Electric Power Corporation) is performing the project to develope the Distributed Micro Gas Turbine (MGT) technolgies by using Swine BIO-ENERGY. This paper describes the plans and strategies for the renewable energy of MGT on actual grid-connection under Korean situations. KEPCO also, has a research plan on bio-gas pretreatment system applicable to our domestic swine renewable resources and is performing concept design of pilot plant to test grid operation. In addition, this testing will be conducted in order to respond to a wide variety of needs for application and economic evaluation in the field of On-site generation.

  • PDF

Seismic Behavior by Beams-Wall Connections depending upon Joint Details of Embedded Steel-Plate Composite Coupling Beams (Steel-Plate 매입형 합성 연결보의 접합부 상세에 따른 내진거동)

  • Joo, Jae-Hyung;Chea, Seong-Yun;Kim, Seon-Gyu;Kim, Woo-Jae;Jun, Ho-Min;Park, Hyo-Seon
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.130-133
    • /
    • 2006
  • Owing to Higher story tendency and ceiling hight restriction of recent times, even though the depth of Coupling Beam decreases the demand efficiency is coming to be high rather so it is the difficult to satisfy a demand efficiency with the actual existing RC/Steel condition. It has been researched a lot of methods as an alternative plan about these but designer cannot apply them for the reason ; the structure standard and theory background are not taking a triangular position. As accomplishing the test research about the beams-wall connections department of steel-plate composite coupling beams from the research in the study it examines closely the beams-wall connections conduct quality and tries to provide the fundamental data for reasonable and optimum connection department designs. It knows that connection fixation degree and composite conduct degree of member part together become the important variable showing an energy dissipation ability in Test result.

  • PDF