• Title/Summary/Keyword: Composite Construction Method

Search Result 644, Processing Time 0.025 seconds

A Study on the Reinforcement of Steel Composite Beam Using the External Post-Tensioning Method (외부 후 긴장 공법을 이용한 강합성보의 보강에 관한 연구)

  • Park, Yong-Gul;Park, Young-Hoon;Lee, Seung-Yong
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.5 s.48
    • /
    • pp.549-558
    • /
    • 2000
  • In strengthening structure, the external post-tensioning method which secure clearness in the structure analysis process is adopted to bridges as well as architecture structure. In this study, to investigate the behavior of composite beam in the process of post-tensioning, the amount of prestress force loss, the amount of prestressed compression stress at the lower flange and the behavior of lower flange connected with anchorage are analyzed by comparing the results of finite element analysis with the measured results of installed strain gauges. After finishing the post-tensioning, the strengthening effect of external post-tensioning method is analyzed by static loading test. It is also investigated that the strengthening effect of shear section in the harped external post-tensioning specimens.

  • PDF

Construction Stage Analysis of Hybrid Composite Cable-Stayed Girder Bridge Using Eccentrically Loaded Derrick Crane (편중 가능한 사장교 가설용 데릭 크레인을 이용한 합성형 복합 사장교 시공 단계 해석)

  • Park, Taekwun;Kim, Moon Kyum;Won, Jong Hwa
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3A
    • /
    • pp.277-286
    • /
    • 2010
  • Derrick or caterpillar crane is generally used for the long-span/cable-stayed bridge construction by pre-cast segment lifting from over-land or water transportation. The heavy weight of them, however, could make defects on unstable under-construction structure and, furthermore a method of conventional segment transportation is also able to occur additional time and cost. In this study, in order to improve conventional construction method, the newly developed derrick crane is mainly considered. It could be not only eccentrically loadable on constructing girder but having rotatable boom for segment transportation from back-side. A series of construction stage using developed derrick crane is defined and also its numerical analysis is conducted. To reflect load characteristics of developed derrick crane on construction stage analysis, on/out of service load is separately calculated by considering vertical/lateral rotation range of boom and it is loaded on 4 fixed positions of crane. The derrick crane on this study could be time and cost saving solution for cable-stayed bridge construction and also make contributions to construction load reduction in its process.

A basic study of reinforcement tools development for Productivity Improvement of Composite PC connection work (합성 PC 구조 접합부공사의 생산성 향상을 위한 철근배근 도구 개발 기초연구)

  • Kim, Geun-Ho;Lim, Chae-yeon;Na, Young-Joo;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.339-340
    • /
    • 2012
  • Green frame is combined by structural steel and reinforcements of Green column and beam and unified by cast-in-place concrete. However, when upper reinforcements penetrate structural steel hole, the execution is difficult due to interference of joint and a rib of deformed reinforcements. Therefore, the objective of this study is to propose the reinforcement tools to improve productivity of precast structure connection construction. The reinforcement tools proposed in this study can be helpful to improve constructability, safety, duration, and cost comparing with conventional reinforcement method since unskilled workers can deal with reinforcements easily.

  • PDF

An Experimental Study on the Non-Exposure Composite Waterproofing Method used Adhesion Liquid and Sheet Integrate Waterproofing Material (점착형 도막.시트 일체형 방수재를 이용한 비노출용 복합 방수공법에 관한 실험적 연구)

  • Kim, Jin-Sung;Seon, Yun-Suk;Park, Jin-Sang;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.125-128
    • /
    • 2007
  • The problem of water leakage due to damaging waterproof in concrete structure, causes the impediment in a long term and shortened the life span of durability. There are a lot of techniques for repair and reinforcement to improve using environment. However, the improper construction which is unconsidered various environmental conditions, could effect to increase the maintenance expenses. Therefore, this study will be compared and estimated the adhesion liquid and sheet integrate waterproofing material, as analyzing the existing problem. For those result, we would like to arrange the alterative plan for the long durability and user needs of concrete structure.

  • PDF

A Study on the Analysis of PSC Box Girder Bridge Considering Construction Stage in Box Section (시공단계를 고려한 콘크리트-콘크리트 합성형 PSC 박스거더 교량의 해석)

  • 김영진;김병석;강재윤
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10b
    • /
    • pp.694-700
    • /
    • 1998
  • PSC box bridge by MSS construction method may not be set at cross section at one step. Web and bottom flange(U member) would be set at first, top flange will be set later with a time lag. In this case, U member and top flange concrete have different strain history. As two different aged section behaves as the composite section, there would happen the redistribution of stress. This is come from time-dependent strain characteristics of concrete itself. In this study, two models are considered, one with considering the set time of cross section and the other without. By performing longitudinal analysis of two models on considering construction stage, the stress differences of two are compared. As the analysis results show a considerable differences in the stresses of cross section between two models, the set time of cross section is needed for rational design f PSC box girder bridge.

  • PDF

A Study on the Characteristics of Parameters in Groundwater Table Fluctuation Model (지하수위 변동 해석모델의 매개변수 특성 연구)

  • Kim, Nam-Won;Kim, Youn-Jung;Chung, Il-Moon
    • Journal of Environmental Science International
    • /
    • v.23 no.4
    • /
    • pp.615-623
    • /
    • 2014
  • The groundwater level varies according to the characteristics and composite materials of aquifer. In this study, specific yield and reaction factor which are the major two hydrogeological parameters in the WTF(Water Table Fluctuation) method were estimated and analyzed spatial characteristics. 8 groundwater level stations which have enough measuring period and high correlation with rainfall in the Hancheon watershed were used. The results showed that specific yield was randomly distributed and reaction factor showed inverse trend with altitude. If the enough data were collected, reaction factor according to altitude in ungauged points could be estimated by using these parameter characteristics.

Analytical Studies on the Shear Behavior of the Shear Connector in Composite Beam with Light Weight Concrete (경량콘크리트를 사용한 합성보에서 전단연결재의 전단거동에 관한 해석적 연구)

  • Choi, Byong Jeong;Han, Hong Soo
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.2
    • /
    • pp.127-134
    • /
    • 2009
  • The purpose of this paper is to understand the shear characteristics of the shear connectors embedded into light weight concrete. This paper tried to confirm the validity of the finite element method(FEM) through the comparative study between the previous study results and FEM analysis, and evaluated the shear strength of shear connector and current design codes(AISC-LRFD and Eurocode 4) according to the variation of compressive strength of light weight concrete. This paper resulted that the shear strength of connector embedded into light weight concrete closely agreed to the one of shear connector by Eurocode 4 based on the results of the FEM analysis.

Behavior Characteristics of PCM Infilled Floor System at Elevated Temperature (고온에 노출된 PCM 충진형 바닥 시스템의 거동 특성)

  • Park, Min-Jae;Min, Jeong-Ki;Yoon, Sung-Won;Ju, Young K.
    • Journal of Korean Association for Spatial Structures
    • /
    • v.17 no.2
    • /
    • pp.33-41
    • /
    • 2017
  • Composite Floor system infilled with PCM(Phase Change Material) between upper and lower steel plates was developed to apply the steel frame. When steel frames were applied this system, it can absolutely reduce the duration of construction due to dry construction method. However to apply this system as a structural floor member without fire resistance covering, it must have 2 hours fire resistance performance. Because PCM consisted of three quarters of section with thermal insulation performance, fire resistance performance of this floor system was expected to easily have 2 hours fire resistance performance. This paper was to investigate behavior characteristics of PCM infilled floor system at elevated temperature using FEM analysis to develop the fire resistance performance of it.

Inelastic Design of Continuous-Span Composite Plate Girder Bridges by LRFD Method (비탄성 설계법에 의한 플레이트 거더 연속교의 LRFD 설계)

  • Cho, Eun Young;Shin, Dong Ku
    • Journal of Korean Society of Steel Construction
    • /
    • v.20 no.4
    • /
    • pp.469-481
    • /
    • 2008
  • The inelastic design of the three-span continuous composite plate girder with consideration of moment redistribution over the interior pier is performed using the LRFD method. The design of the girder section, based on the inelastic method, is compared with that by the conventional elastic design. The length of the center span for the three-span continuous bridge ranges from 40m to 70m and the relative ratio of the span length is assumed to be 4:5:4. Although the AASHTO- LRFD specifications are applied in the design of the composite girder, the recently proposed new design live load is used. After determining the maximum positive and negative sections by the elastic design for various limit states, the amount of moment redistributed to the maximum positive moment section is calculated. With the increased design moment due to moment redistribution from the interior pier, the maximum positive section designed by the elastic method is checked for the strength limit state and the service limit state. The maximum negative moment section is redesigned by reducing the size of the steel girder relative to the section designed by the elastic method and the new section is checked for the service limit state. Based on the design results for the five bridges considered in this study, it is estimated that about 23% of steel can be saved in the interior pier section if it is designed by the inelastic method compared with that designed by the elastic method.

Applicability of Composite Polyurea Method Considering the Required Performance in Underground Parking Lot Upper Slab (공동주택 지하주차장 상부슬래브의 요구성능을 고려한 복합형 폴리우레아 공법의 적용성 검토)

  • Lee, Jung-Hun;Choi, Eun-Kyu;Song, Je-Young;Kim, Soo-Yeon;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.3
    • /
    • pp.243-254
    • /
    • 2019
  • In this study, problems of the waterproofing methods in which water leakage occurs in the upper slab of the underground parking lot of apartment houses and the requirements considering the characteristics of the upper slab, and selected the appropriate performance(proposal) for the composite polyurea process are reviewed. As a result of the study, it is necessary to review performance such as responsiveness to upper slab of the multi-unit underground parking lot that is comprised of (1) crack and behavior responsiveness, (2) surface integrity, (3) vertical watertight stability, (4) pressure layer construction, (5) impact and pressure response and (6) vehicle moving load. As a result of evaluating 5 items corresponding to the requirements for the soft and hard complex polyurea, all of them were found to meet the conditions, and each materials were improved by compounding the materials that had problems when applying a single-ply method, thereby clarifying the advantages and disadvantages of the material property. However, in order to apply to the actual site, additional evaluation on site applicability such as mock-up evaluation should be conducted, and subsequent studies on the applicability of the market through review of economic feasibility and maintenance is required.