A Study on the Analysis of PSC Box Girder Bridge Considering Construction Stage in Box Section

시공단계를 고려한 콘크리트-콘크리트 합성형 PSC 박스거더 교량의 해석

  • 김영진 (한국건설기술연구원, 구조연구실) ;
  • 김병석 (정회원, 한국건설기술연구원, 구조연구실) ;
  • 강재윤 (한국건설기술연구원, 구조연구실)
  • Published : 1998.10.01

Abstract

PSC box bridge by MSS construction method may not be set at cross section at one step. Web and bottom flange(U member) would be set at first, top flange will be set later with a time lag. In this case, U member and top flange concrete have different strain history. As two different aged section behaves as the composite section, there would happen the redistribution of stress. This is come from time-dependent strain characteristics of concrete itself. In this study, two models are considered, one with considering the set time of cross section and the other without. By performing longitudinal analysis of two models on considering construction stage, the stress differences of two are compared. As the analysis results show a considerable differences in the stresses of cross section between two models, the set time of cross section is needed for rational design f PSC box girder bridge.

Keywords