• Title/Summary/Keyword: Common cost

Search Result 1,057, Processing Time 0.032 seconds

A Study on the Validity of Government Cloud SaaS Service Migration using TCO Approach (TCO 접근방법을 통한 정부클라우드 SaaS 서비스 전환의 타당성에 관한 연구)

  • Yoon, Seong-Jeong;Kim, In-Hwan;Seo, Jung Wook;Kim, Min-Yong
    • Journal of Information Technology Services
    • /
    • v.11 no.4
    • /
    • pp.215-231
    • /
    • 2012
  • It is well known that SaaS(Software as a Service) changeover gives several advantages to organization. One of the advantages is the cost reduction effect of IT resources as well as IT human resources. Another one is the curtailment of software development workload in the field of informatization promotions. Nonetheless, it is hard to find comparison cases regarding the quantitative measurement of the introduction of SaaS before and after. Accordingly, when the Government IDC tries to adopt SaaS, it absolutely needs the empirical study whether SaaS is cost-effectiveness or not. In this study, we focus on variation in the Government administration common tasks, processes and labor costs. Using the Man-Month(MM) estimation methods, We verify that how much TCO(Total Cost of Ownership) is reduced per year.

Quality-Sustainable Way to Business Excellence

  • Kondo, Yoshio
    • International Journal of Quality Innovation
    • /
    • v.3 no.2
    • /
    • pp.1-12
    • /
    • 2002
  • Quality is distinguished from the other important management indicators, cost and profitability, by the features of its far longer history and of common concern to both manufacturer and customer. We may say from this that quality has a far more human aspect than either cost or profitability. We stress the importance of establishing “quality culture.” But we do not commonly use the terms of “cost culture” or “productivity culture.”In addition, we know from our experiences that improving quality by creative methods can lead to lower cost and higher productivity, although the converse is not necessarily true. In the Maslow's hierarchy of human needs, it is known that the character of human needs changes from extrinsic and material ones at lower levels to intrinsic and mental or spiritual ones at higher levels. We know from our experience that employee satisfaction is closely linked with quality, which is of more human nature and can further be deployed into the detailed elements of quality. The leaders and managers should positively display leadership and respond to the efforts of the subordinates. Without these managerial leadership and efforts, it is almost impossible to provide essential and true customer satisfaction. They are the indispensable elements for business excellence.

STUDY OF NEW CAST-IN-PLACE MORTAR WALL FOR HOUSE CONSTRUCTION COMPARED TO BRICK AND MORTAR-BLOCK SYSTEM (A SIMULATION IN DIFFERENT AREAS)

  • Arief Setiawan Budi Nugroho;Shin-ei Takano
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.196-202
    • /
    • 2009
  • Study from Yogyakarta earthquake reconstruction program, cast-in-place wall using fix-size formwork system (Old-CIP) has offered a good alternative for house construction. A simulation has also confirmed that this system using mortar as the main material can provide cheapest cost and lowest total man power compared to conventional wall construction technique: brick or mortar-block wall. This paper presents the new wall construction technique: full size cast-in-place wall (New-CIP). The detail of how this new technique implemented is described. In addition, considering that material and labor cost in one area is different to others, cost analysis for different resources prices and wages of three cities are taken into a simulation. The analysis is aimed to distinguish the implementation feasibility of New-CIP system compared to the four common wall systems. Finally, its implementation resistance is also discussed.

  • PDF

Improvement of inspection system for common crossings by track side monitoring and prognostics

  • Sysyn, Mykola;Nabochenko, Olga;Kovalchuk, Vitalii;Gruen, Dimitri;Pentsak, Andriy
    • Structural Monitoring and Maintenance
    • /
    • v.6 no.3
    • /
    • pp.219-235
    • /
    • 2019
  • Scheduled inspections of common crossings are one of the main cost drivers of railway maintenance. Prognostics and health management (PHM) approach and modern monitoring means offer many possibilities in the optimization of inspections and maintenance. The present paper deals with data driven prognosis of the common crossing remaining useful life (RUL) that is based on an inertial monitoring system. The problem of scheduled inspections system for common crossings is outlined and analysed. The proposed analysis of inertial signals with the maximal overlap discrete wavelet packet transform (MODWPT) and Shannon entropy (SE) estimates enable to extract the spectral features. The relevant features for the acceleration components are selected with application of Lasso (Least absolute shrinkage and selection operator) regularization. The features are fused with time domain information about the longitudinal position of wheels impact and train velocities by multivariate regression. The fused structural health (SH) indicator has a significant correlation to the lifetime of crossing. The RUL prognosis is performed on the linear degradation stochastic model with recursive Bayesian update. Prognosis testing metrics show the promising results for common crossing inspection scheduling improvement.

System Structure and Reliability Optimization of VVVF Urban Transit Brake System Through Cost Function Construction (비용함수를 이용한 VVVF 전동차 제동장치의 시스템 구조 및 신뢰도 최적화)

  • Kim, Se-Hoon;Kim, Hyun-Jung;Bae, Chul-Ho;Lee, Jung-Hwan;Lee, Ho-Yong;Suh, Myung-Won
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.15 no.3
    • /
    • pp.63-71
    • /
    • 2007
  • During the design phase of a product, reliability and design engineers are called upon to evaluate the reliability of the system, The question of how to meet target reliability for the system arises when estimated reliability or cost is inadequate. This then becomes a problem of reliability allocation and system structure design. This study proposes the optimization methodology to achieve target reliability with minimum cost through construction of the cost function of system. In cost function, total cost means the sum of initial cost, repair cost and maintenance cost. This study constructs optimization problem about system structure design and reliability allocation using cost function. This problem constructed is solved by Multi-island Genetic Algorithm(MIGA), and applies to urban transit brake system. Current brake system of the urban transit is series system. Series system is the simplest and perhaps one of the most common system, but it demands high reliability and maintenance cost because all components must be operating to ensure system operation. Thus this study makes a comparative study by applying k-out-of-n system to brake system. This methodology presented can be a great tool for aiding reliability and design engineers in their decision-makings.

Prescription Pattern for a Simulated Patient With the Common Cold at Pharmacies in a Region in Korea Without Separation of Dispensary From Medical Practice (영동지방 의약분업 예외지역 약국들에서의 감기 증상 모의 환자에 대한 약물 처방 현황)

  • Lee, Hyeong-Cheol;Park, Woo-Joo;Oh, Mi-Kyeong
    • The Korean Journal of Health Service Management
    • /
    • v.13 no.3
    • /
    • pp.115-125
    • /
    • 2019
  • Objectives: Korea has been practicing the separation of dispensary from medical practice since 2000 as a national policy to prevent misuse or overuse of medicines. This study aimed to investigate prescription patterns from except pharmacies in order to determine the appropriateness of drug usage among those patients. Methods: Thirty-two pharmacies in the Yeongdong area of Gangwon Province were examined in this study. The same simulated patient complaining of cold symptoms for 3 days visited each pharmacy to obtain a prescription for medication. Results: At pharmacies prescribing medicine, steroids (53.1%) and antibiotics (50.0%) were used to treat the common cold. Duplicate prescriptions of drugs, such as antihistamines (47.0%) and decongestants (31.3%) were common. The average number of drug prescriptions was 6.59, and 53.2% of pharmacies had prescribed more than seven drugs. The average total cost of the prescriptions was 6,093 won, and the daily cost was 2,544 won. Conclusions: Steroids and antibiotics were frequently abused among patients whose medications had been prescribed by pharmacies. Also, there were a considerable number of drugs and duplicate prescriptions. The prices of the drugs were somewhat high.

Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects (설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향)

  • Kang, Tai-Kyung;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

Network Costing Model Alternatives for Reasonable Interconnection Charging Between Networks (합리적 접속료산정을 위한 통신망비용모형 수립방안)

  • 권수천
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.4 no.5
    • /
    • pp.907-917
    • /
    • 2000
  • In this paper the network costing model alternatives for reasonable interconnection charging are suggested. The current interconnection charge regimes is based on fully distributed costing method. Basically this method doesn't consider the common carrier's efficient network cost because it reflects the actual cost of network In this paper, 1 suggest the basic structure of the network costing model fur applications of incremental costing method that considers the efficient cost based on economics-prospective. And I classify network cost with capital cost and operating cost and analysis their reasonable costing methods.

  • PDF

IoT-based low-cost prototype for online monitoring of maximum output power of domestic photovoltaic systems

  • Rouibah, Nassir;Barazane, Linda;Benghanem, Mohamed;Mellit, Adel
    • ETRI Journal
    • /
    • v.43 no.3
    • /
    • pp.459-470
    • /
    • 2021
  • This paper presents a low-cost prototype for monitoring online the maximum power produced by a domestic photovoltaic (PV) system using Internet of Things (IoT) technology. The most common tracking algorithms (P&O, InCond, HC, VSS InCond, and FL) were first simulated using MATLAB/Simulink and then implemented in a low-cost microcontroller (Arduino). The current, voltage, load current, load voltage, power at the maximum power point, duty cycle, module temperature, and in-plane solar irradiance are monitored. Using IoT technology, users can check in real time the change in power produced by their installation anywhere and anytime without additional effort or cost. The designed prototype is suitable for domestic PV applications, particularly at remote sites. It can also help users check online whether any abnormality has happened in their system based simply on the variation in the produced maximum power. Experimental results show that the system performs well. Moreover, the prototype is easy to implement, low in cost, saves time, and minimizes human effort. The developed monitoring system could be extended by integrating fault detection and diagnosis algorithms.

Initiating Liver Transplantation at a Public Hospital in Korea

  • Lee, Doo-ho;Lee, Hae Won;Ahn, Young Joon;Kim, Hyeyoung;Yi, Nam-Joon;Lee, Kwang-Woong;Suh, Kyung-Suk
    • Korean Journal of Transplantation
    • /
    • v.31 no.4
    • /
    • pp.193-199
    • /
    • 2017
  • Background: Although there more than 1,000 liver transplantations (LTs) are performed in Korea annually, their immense cost remains a great hurdle. Hence, in an attempt to reduce the medical costs of LT, a program was initiated at a public hospital affiliated with the Seoul National University Hospital. Methods: A total of 11 LTs have been successfully executed since the first LT performed at Seoul Metropolitan Government Seoul National University Boramae Medical Center in July 2011 through December 2014. Results: Nine patients (81.8%) were male and two (18.2%) were female. The mean age of patients was 53.4±11.4 years. Hepatitis B virus-related liver disease (n=6, 54.5%) was the most common causative disease, followed by alcoholic liver disease (ALD) (n=4, 36.4%). The actuarial 3-year survival rate was 90.9%. The median total medical cost of LTs was US $41,583 (calculated from operation to discharge), but only $11,860 was actually charged for patients with health insurance coverage. One female patient who had undergone deceased donor LT for alcoholic liver cirrhosis died during follow-up. This patient was non-compliant with the medical instructions after discharge, and finally expired due to septic shock at 10 months post-LT. Conclusions: In the public hospital, LT was successfully performed at a much lower cost. However, LT guidelines and peritransplant management protocols for patients with ALD must be established before escalating LT at public hospitals since ALD with poor compliance is one of the most common causes of complications at public hospitals.