• Title/Summary/Keyword: Chart analysis

Search Result 919, Processing Time 0.037 seconds

Bootstrap $C_{pp}$ Multiple Process Performance Analysis Chart (붓스트랩 $C_{pp}$ 다공정 수행분석차트)

  • Jang, Dae-Heung
    • Journal of Korean Society for Quality Management
    • /
    • v.38 no.2
    • /
    • pp.171-179
    • /
    • 2010
  • Pearn et al.(2002) supposed the $C_{pp}$ multiple process performance analysis chart. This chart displays multiple processes with the process variation and process departure on one single chart. But, this chart can not display the distribution of the process variation and process departure and is inappropriate for processes with non-normal distributions. With bootstrapping method, we can display the distribution of the process variation and process departure on the $C_{pp}$ multiple process performance analysis chart.

Bootstrap $C_{pp}$ Multiple Process Performance Analysis Chart (붓스트랩 $C_{pp}$ 다공정 수행분석차트)

  • Jang, Dae-Heung;Kim, Dae-Hak
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2007.04a
    • /
    • pp.287-296
    • /
    • 2007
  • Pearn et al.(2002) supposed the $C_{pp}$ multiple process performance analysis chart. This chart display multiple processes with the process variation and process departure on one single chart. But, this chart can not display the distribution of the process variation and process departure. With bootstrapping method, we can display the distribution of the process variation and process departure on the $C_{pp}$ multiple process performance analysis chart.

  • PDF

Development of VSI Synthetic Control Chart (가변샘플링기법을 이용한 합성관리도의 개발)

  • Song, Suh-Ill;Park, Hyun-Kyu
    • Journal of Korean Society for Quality Management
    • /
    • v.33 no.1
    • /
    • pp.1-10
    • /
    • 2005
  • This paper develops a new VSI $\={X}-CRL$ synthetic control chart that considers convenience of use in the field, and perception of change of process applying VSI techniques to synthetic control chart, simultaneously. We found the optimal sampling interval and various control limit factor of the suggested chart using markov chain. Comparison and analysis is carried out between synthetic VSI $\={X}-CRL$ chart and other chart in the statistical aspect; $\={X}$ control chart, VSI $\={X}$ chart, another synthetic chart. In case that the process follows normal distribution, the proposed VSI $\={X}-CRL$ synthetic control chart in detecting process mean shift showed the best performance in aspect of statistical performance, regardless of control limit L of CRL/S control chart.

Strain Analysis of Crust at the Stabilization Stage Using and Applied Statistical Analysis

  • Kim, Hyeong-Sin;Yun, Hyun-Seok;Chae, Byung-Gon;Choi, Jung-Hae;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.9-20
    • /
    • 2015
  • A strainmeter goes through a period of instability immediately after installation. To determine the stability of strainmeters installed around the Andong fault zone, South Korea, an x-MR control chart analysis and a T2 control chart analysis were conducted. The x-MR control chart analysis used an empirically determined 3σ control limit line to identify abnormal data in recently installed strain gauges. In the T2 control chart analysis, the control limit line was set at a confidence of 95%. A comparison of the early stage of measurement with the terminal stage of measurement for three months after installation indicates that stabilization depends on the location and direction of each strain gauge in x-MR control chart analysis. In the T2 control chart analysis, the number of values exceeding the control limit line decreased as the terminal stage was approached. Based on these results, it is suggested that the 3σ control limit line of an x-MR control chart can be used as a standard for single gauge stability, and that the 95% confidence limit of a T2 control chart analysis could be used as the standard for the stability of multi-gauge strainmeters.

Forecasting Symbolic Candle Chart-Valued Time Series

  • Park, Heewon;Sakaori, Fumitake
    • Communications for Statistical Applications and Methods
    • /
    • v.21 no.6
    • /
    • pp.471-486
    • /
    • 2014
  • This study introduces a new type of symbolic data, a candle chart-valued time series. We aggregate four stock indices (i.e., open, close, highest and lowest) as a one data point to summarize a huge amount of data. In other words, we consider a candle chart, which is constructed by open, close, highest and lowest stock indices, as a type of symbolic data for a long period. The proposed candle chart-valued time series effectively summarize and visualize a huge data set of stock indices to easily understand a change in stock indices. We also propose novel approaches for the candle chart-valued time series modeling based on a combination of two midpoints and two half ranges between the highest and the lowest indices, and between the open and the close indices. Furthermore, we propose three types of sum of square for estimation of the candle chart valued-time series model. The proposed methods take into account of information from not only ordinary data, but also from interval of object, and thus can effectively perform for time series modeling (e.g., forecasting future stock index). To evaluate the proposed methods, we describe real data analysis consisting of the stock market indices of five major Asian countries'. We can see thorough the results that the proposed approaches outperform for forecasting future stock indices compared with classical data analysis.

Project Risk Management & Observational Method for soft ground improvement (연약지반을 대상으로 한 프로젝트 리스크와 현장계측의 과제와 대책)

  • Imanishi, Hajime
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.509-514
    • /
    • 2006
  • Considering the risk management, there are many examples and various studies for the corporation risk. However, I have never seen the project risk management that applied a construction site for practical approach. Therefore, I have developed a chart (I-Chart) for the project risk management, and also built a model (I-Chart scenario analysis) that I could use. I applied this model to container yard reclaimed land in harbor construction with approaching of geotechnical engineering.

  • PDF

The Study for Comparative Analysis of Software Failure Time Using EWMA Control Chart (지수 가중 이동 평균 관리도를 이용한 소프트웨어 고장 시간 비교분석에 관한 연구)

  • Kim, Hee-Cheul;Shin, Hyun-Cheul
    • Convergence Security Journal
    • /
    • v.8 no.3
    • /
    • pp.33-39
    • /
    • 2008
  • Software failure time presented in the literature exhibit either constant, monotonic increasing or monotonic decreasing. For data analysis of software reliability model, data scale tools of trend analysis are developed. The methods of trend analysis are arithmetic mean test and Laplace trend test. Trend analysis only offer information of outline content. In this paper, we discuss exponentially weighted moving average chart, in measuring failure time. In control, exponentially weighted moving average chart's uses are efficiency case of analysis with knowing information, Using real software failure time, we are proposed to use exponentially weighted moving average chart and comparative analysis of software failure time.

  • PDF

Proposal of a Mechanically Rigorous Slope Stability Chart (역학적으로 엄밀한 사면안정도표의 제안)

  • 김종민
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.1
    • /
    • pp.121-129
    • /
    • 2004
  • In this study, a slope stability chart for assessing stability of homogeneous simple soil slopes is proposed. Most existing slope stability charts are based on limit equilibrium method, which is not rigorous in mechanical standpoint. Meanwhile, limit analysis based on the principle of virtual work and the bound theorems of plasticity is suitable for evaluating the stability of geotechnical structures such as slope due to its simplicity in computation and mechanical rigor. Numerical limit analysis taking advantage of finite elements and linear programming can consider various slope conditions and, in addition, find the optimum stability solution with effeciency. In this study, a numerical limit analysis program in terms of effective stress is developed and a mechanically rigorous slope stability chart is proposed by performing stability analyses for various slope conditions. Pore pressure ratio, commonly used in stability charts, is applied to consider the effects of pore pressure for effective stress analysis. As a result of comparison between proposed stability chart and Spencer's stability chart, it was found that Spencer's chart solutions are biased to lower bound which means conservative in design.

Evaluation on Performance of Accuracy for Analysis and Classification of Data Related to Industrial Accidents (산업재해 데이터의 분석 및 분류를 위한 정확도 성능 평가)

  • Leem Young-Moon;Ryu Chang-Hyun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.04a
    • /
    • pp.51-56
    • /
    • 2006
  • Recently data mining techniques have been used for analysis and classification of data related to industrial accidents. The main objective of this study is to compare performance of algorithms for data analysis of industrial accidents and this paper provides a comparative analysis of 5 kinds of algorithms including CHAID, CART, C4.5, LR (Logistic Regression) and NN (Neural Network) with ROC chart, lift chart and response threshold. In this study, data on 67,278 accidents were analyzed to create risk groups for a number of complications, including the risk of disease and accident. The sample for this work chosen from data related to manufacturing industries during three years $(2002\sim2004)$ in korea. According to the result analysis, NN has excellent performance for data analysis and classification of industrial accidents.

  • PDF

Study on 2 dimensional Control Chart and Search interrelation Independent variable and dependent variable by using control chart considered simultaneously (2차원 관리도와 관리도를 이용한 독립변수와 종속변수의 관계연구)

  • Ree, Sang-Bok;Kim, Myung-Hoon
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.11a
    • /
    • pp.195-198
    • /
    • 2006
  • In this paper, we propose a 2dimension Control Chart. Suggested which Control chart augments Schwart Control chart which is 1-dimensional and Independent variable and dependent variable interrelationship by using control chart. Schwart control chart cannot use input variable and output variable together. In this paper, we try to analysis input variable and output variable dependent and effect. So called 2-dimensional control char.

  • PDF