For RMR and Q rock mass classification at the design and construction stage, evaluation of groundwater condition is usually based upon the experience due to the restriction of available methods. Based on the results of Taejon LNG Pilot Cavern which acquire joint water pressure, inflow rate of ground water and hydraulic conductivity model, estimates from numerical analysis and analytical solutions were compared to verify each evaluation method. As the result, the Raymer(2001) approach was found to be efficient for estimating inflow rate and corresponding value.
The conical-ended borehole technique and hemispherical-ended borehole technique are proposed, for the accurate stress measurement within a rock mass. Theory of stress tensor determination and in situ measurement system are presented with successful case examples, and the characteristics of stress distribution within rock masses are examined by the multiple times measurement in a single borehole. Subsequently, the problem in relation to the numerical approach for cavern designing is discussed on the basis of the dependency of the stress discontinuity on the geological discontinuities and so on.
This study Is to summarize the contents for the investigation and design of the construction for oil storage. Since underground caverns are large scale, in their construction one should consider the mechanical stability of cave·rns and the economic view of construction. On the basis of them, cavern's section and layout were determined and water curtains were designed to maintain hydraulic equilibrium so that gases were sealed tightly. Also the supporting criteria for rock bolt and stotcrete were determined by means of the classification of rock masses and the results of finite element method. The criteria of grouting reinforcement were presented according to the results of injection test in the pilot holes of working face.
Groundwater movement is one of the most important elements in the construction and management of underground oil storage cavern. To control the groundwater flow, grouting is run in parallel with water curtains. But as traditional grouting is conducted within cavern before and after excavation, the effect of grouting is delayed and the injection sphere is limited in the rock mass. Therefore, it is desirable to introduce a more extensive and effective grouting. This article is to present the caly grouting, which was the first to be carried out in the construction of underground caverns for oil storage in Japan. After conducting the clay grouting, the effect was confirmed by ground water level and infiltration quantity to the caverns.
In this study, three-dimensional block generation program was developed using the discontinuities input data for three-dimensional mechanical and hydro-mechanical analysis. Shi's two dimensional theory and program was extended to those of three-dimension and the deformations of blocks were calculated. The two-dimensional hyro-mechanical theory of DDA was also extended to three-dimensional theory and coupling deformation of the underground cavern was analyzed considering discontinuities.
This study is to summarize the contents for the investigation and design of the construction for oil storage. Since underground caverns are large scale, in their construction one should consider the mechanical stability of caverns and the economic view of construction. On the basis of them, cavern's section and layout were determined and water curtains were designed to maintain hydraulic equilibrium so that gases were sealed tightly. Also the supporting criterial for rock bolt and stotcrete were determined by means of the classification of rock masses and the results of finite element method. The criteria of grouting reinforcement were presented according to the results of injection test in the pilot holes of working face.
Magazine of korean Tunnelling and Underground Space Association
/
v.4
no.3
/
pp.23-37
/
2002
프로덕트 관리를 통하여 발주자에게 제공해야 하는 산출물에 대한 구체적인 특성 및 제원이 규명되면, 프로젝트 관리를 통하여 발주자에게 제공해야 하는 산출물에 대한 구체적인 작업 및 자원이 규명된다. 또한 프로젝트 관리는 설정된 공기, 공사비, 품질 등의 프로젝트 목표를 만족시킴으로써 그 역할을 수행하게 된다. 최근 국내외 프로젝트의 입찰 과정을 볼 때 발주자의 요구사항이 점점 까다로워지고 제약 조건은 더욱 강화되고 있는 추세이다. 따라서 몇몇 사람의 특화된 감각이나 과거 수행된 계획의 답습만으로는 이러한 추세에서 제대로 대응하여 프로젝트 목표를 달성하는 것은 매우 힘든 실정이다. 본 기술보고에서는 프로세스를 통하여 프로젝트 계획을 개발함으로써 과학적이며 체계적인 프로젝트 관리가 이루어질 수 있음을 보여주고자 한다.
Proceedings of the Computational Structural Engineering Institute Conference
/
1996.04a
/
pp.173-181
/
1996
In this study, a stochastic finite element model is proposed with a view to consider the uncertainty of physical properties of rock mass in the analysis of structural behavior on underground caverns. Here, the Latin Hypercube Sampling technique, in which can makeup weak points of the Monte Carlo Simulation, is applied for the analysis of underground cavern. The validity of the newly developed computer program has been confirmed in terms of verification examples. And, the applicability of the program to the field has been tested in terms of the analysis of the underground oil storage cavern in korea.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.2
no.1
/
pp.34-45
/
1984
The condition of underground basic rock and the location of cavern site can be found by means of seismic surveying is one of the physical exploration methods by which the prelimirary investigation of underground storage constructions are made in order to maximize the use of a land. This study is valuable in the point of showing a method for the decision of the property of a underground facilities estabilishment, by analying the elastic wave velocity and the distribution of a lower velocity zone and by grasping the weak zone of the basic rock.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.