• Title/Summary/Keyword: Calculation of Damages

Search Result 97, Processing Time 0.042 seconds

A Study on the Improvement Method on Calculating the Damages Caused by the Bid Rigging in the Construction Work (건설공사 입찰담합으로 인한 손해액 산정 개선방안 연구)

  • Min, Byeong-Uk;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1053-1061
    • /
    • 2017
  • The study is concerned with providing the improvement method on making a reasonable and scientific decision on the damages accrued from the bid rigging in the construction work. According to the review on the precedent studies and decision cases on the damages caused by bid rigging, the representative problems include the insufficiency of the classification system on the damage calculation method and the omission of the necessary stage in the damage determination process. First, the improved classification system on calculating the damages caused by bid rigging is presented with the application to the bid rigging in the construction work by adding the ratio factor in addition to the damage calculation parameters such as price and cost. Second, the standard procedures organized with six stages is presented as the process required for determining the damages if the indemnification for bid rigging is claimed. The study becomes the foundation for resolving the problem with the undue burden on a party and for preventing the opportunity loss by resolving a dispute early through the improvement classification system and standard procedures presented in the study.

A Liquidated Damages Calculation Method Based on Owner's Substantial Loss (발주자 손실기반 지체상금 산정 개선방안)

  • Jang, Bong-Jo;Shim, Jae-Young;Koo, Jeong-San;Jung, Dae-Won;Koo, Kyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.150-158
    • /
    • 2007
  • The delay of construction is one of the most frequent and complicated elements of the claim. And the liquidated damages cause many disputes during the judgement. The liquidated damages should be a compensation for owner's substantial loss, but actually be applied as a damage for breach of contract. These damages are different from owner's loss and give constructors a excessive burden. So we need a more reasonable system than a lump application system. In this study, we make a Improvement System, that based on owner's substantial loss, and suggest the new liquidated damages calculation method.

A Study on Calculation Method of Compensation for Indirect Damage of Fishery by Undertaking Public Project (공익사업시행(公益事業施行)으로 인한 어업(漁業)의 간접피해(間接被害) 보상액(補償額) 산출방법(算出方法)에 관(關)한 연구(硏究))

  • Kim Ki-Dae;Kim Byung-Ho
    • The Journal of Fisheries Business Administration
    • /
    • v.37 no.1 s.70
    • /
    • pp.25-44
    • /
    • 2006
  • Under the provision of Article 63 of the Enforcement Regulation of the Act on Acquisition and Compensation of Land and Others for Public Project that is recently enacted and implemented (hereinafter referred to as the 'Lend Compensation Act') the compensation is required to make 'When the Actual Damage Amount' is confirmed for the damage in fishery affairs that is outside of the public project area. The compensation for fishery business on the indirect damage area has been excluded from the advance compensation subject to conflict with the existing laws on fishery business compensation with the controversy in method, procedure, time and others to confirm the actual damage amount, and it lacks the standard of calculation for detailed compensation on partial damages outside of business implementation area, which caused the ceaseless conflicts and straggles between the project implementation party and the victimized fishermen regarding the calculation method of damages, standard, compensation period and others. In particular, from the numerous problems in damage compensation in fishery on the indirect damage area, the most recent problem emerged is the issue on application method of damage period in calculating the damage compensation amount that the struggle has been deepened with the differences between the project implementation party and the victimized fishermen without the stipulation on the compensation, that caused the difficulties in carrying out the public project and other serious social problems. In this study, the reasonable application method for the damage period and the calculation plan of the damage amount for calculating the damages on fishery industry outside of the public project implementation zone that is not fully specified under the Land Compensation Act, and the indirect damage area is not influenced for the notification of project recognition, and the compensation to undertake with the damage in the fishery industry in project implementation area to have the nature of damage compensation, the right to engage in fishery industry has the perpetual nature of rights, the fishery damage compensation system of Japan also recognizes the perpetual right on fishery industry to calculate the compensation amount, and the compensation for damage amount has been exercised for the period of actual damage occurrence period regardless of remaining effective period for most of fishery permit and license for fishery compensation outside of the project implementation area following the recent various public projects as well as the development process of theory on fishery loss compensation that the calculation of damage amount on the fishery industry outside of the project implementation zone would be prudent to compensate by calculating the applicable damages during the period of actual damages, and by doing so, the 'just compensation' guaranteed under the Constitution may be materialized. Therefore, the calculation of the damages from the implementation of the public project shall consider the actual period of damages and the degree of damage from the public project to calculate by the income capitalization method, however, considering the equitable consideration with the compensation following the cancellation, it shall not exceed the compensation following the termination of the applicable fishery businesses. Furthermore, the calculation method of partial damage amount on the fishery business following the project implementation shall apply, depending on the period of damage occurrence, by (1) the case of calculating the future damage amount at the present time, and (2) calculating the damage from the past to the present time as well as the damage to be incurred later, by selecting the calculation method for damages following the damage occurrence type.

  • PDF

The Trend of Precedents about Calculation of Damage Compensation for Last Decade (손해배상액 산정에 관한 최근 10년간 판례의 동향 (상)(上))

  • Park, Young-Ho
    • The Korean Society of Law and Medicine
    • /
    • v.10 no.2
    • /
    • pp.11-36
    • /
    • 2009
  • This thesis introduces the trends of korean courts' ruling on damages in medical malpractice cases for past 10 years. First of all, Korean courts' ruling have had a tendency to pay only non-economic damages for not taking the informed consent. If a doctor cannot get the informed consent from a patient, he compensate only non-economic damages for the infringement of self-determination rights of patient. It's enough for the plaintiff to prove the infringement of self-determination rights, if the plaintiff just want to get non-economic damages. The Korean Supreme court have ruled that if plaintiffs want to get economic damages for the infringement of self-determination rights or informed consent, plaintiffs must prove that the infringement of self-determination rights is the proximate cause of the economic damages of patient. There is another tendency for the Korean Supreme court to limit the damages in medical malpractice cases on the ground of patient's diseases' dangerousness or patient's idiosyncrasy. In the past courts often limit the damages only to 70~80% of total damages, but now a days courts mostly limit the damages to 20~30%. This thesis also introduce the Korean courts' trends about Valuing damages in personal injury actions awarded for gratuitously rendered nursing and medical care.

  • PDF

Study on the North Korean Law in Estimating the Damages caused by Personal Injury (북한법상 인신사고에 대한 손해액 산정기준)

  • Hyun, Dooyoun
    • The Korean Society of Law and Medicine
    • /
    • v.20 no.1
    • /
    • pp.47-82
    • /
    • 2019
  • Inter-Korean exchanges and cooperation, in the process, will inevitably lead to various legal disputes, one of which is the issue of compensation for personal injury. The purpose of this study is to present the standards of settlement of disputes between the residents of North and South Korea by examining the North Korean compensation law on the calculation of damages due to personal injury and comparing it with the South Korean compensation law. Understanding the North Korean compensation law is a critical and urgent task, as exchanges and cooperation between the two Koreas are expected to increase in the future. For the South Korean compensation law does not have specific provisions on the estimation of damages, the specific methods and standards for estimating damages are determined by court precedents. The South Korean courts categorize the damages caused by personal injury into active property damages, passive property damages and emotional distress damages and calculate the amount of each damages. On the other hand, the North Korean Compensation for Damage Act stipulates the categories of damage by dividing the cases of personal injury into 1) infringement of health(§41), 2) disability due to infringement of health(§42), and 3) death resulting from human infringement(§44). In addition, the North Korea Compensation for Damage Act specifies the calculation of compensation for damages(§43, §51). Furthermore, South Korea widely acknowledges emotional distress damages for personal injury, whereas North Korea does not recognize emotional distress damages in principle.

A Study on Hull Deflection and Shaft Alignment Interaction in VLCC

  • Lee Yong-Jin;Kim Ue-Kan
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.29 no.7
    • /
    • pp.785-794
    • /
    • 2005
  • Modern ship hulls of large oil carriers and container carrers have become more flexible with scantling optimization and increase in ship length. On the other hand. as the demand for power has increased with the ship size. shaft diameters have become larger and stiffer. Consequently. the alignment of the propulsion system has become more sensitive to hull girder deflections. resulting in difficulties in analyzing the alignment and conducting the alignment procedure. Accordingly. the frequency of shaft alignment related bearing damages has increased significantly in recent years. The alignment related damages are mostly attributed to inadequate analyses. changes in the design of the vessel. shipyards' practices in conducting the alignment. and a lack of well defined analytical criteria. The hull deflections should be considered at the design stage to minimize the bearing damage caused by hull deflection. Hull deflections can be estimated by analytical approach and reverse calculation using the measured data. The hull girder deflection analysis using the reverse calculation will be introduced in this paper.

A Comparative Legal Study on the Damages in the International Sale Laws (국제물품매매에서 손해배상청구권에 관한 비교법적 고찰)

  • OH, yon-Sok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.77
    • /
    • pp.23-42
    • /
    • 2018
  • This study compares the SGA and CISG to find out the difference of the criteria for calculating damages. and it intends to give some important points in trade practice. The damages is intended to compensate the victim for the breach of contract but there are differences between SGA and CISG as follow. First, the SGA and CISG have the same purpose of claiming damages. Both laws and regulations are subject to a full indemnification to compensate for the breach of the contract by the amount equivalent to the loss suffered by the victim. Second, in the general principle related to the calculation of damages, both law enforcement officials are required to be able to predict damages caused by breach of contract. In the case of SGA, however, a foreseeability test or remoteness of damages is required for the relationship between the contract violation and the loss. In other words, it can be said that the causal relation between the contract violation and the damage is strictly applied rather than the CISG. Finally, both laws and regulations of SGA and CISG have a big difference in criteria for calculating damages. In the CISG, after the contract is canceled, it is classified according to the existence of the alternative transaction and the damage amount is calculated based on the contract price. On the other hand, the SGA estimates the loss based on the market price at the delivery of the goods, reflecting the change in the market price instead of the contract price of the goods.

  • PDF

The Trend of Precedents about Calculation of Damage Compensation for Last Decade (손해배상액 산정에 관한 최근 10년간 판례의 동향 하(下))

  • Park, Young-Ho
    • The Korean Society of Law and Medicine
    • /
    • v.11 no.1
    • /
    • pp.397-445
    • /
    • 2010
  • This thesis introduces the trends of korean courts' ruling on damages in medical malpractice cases for past 10 years. First of all, Korean courts' ruling have had a tendency to pay only non-economic damages for not taking the informed consent. If a doctor cannot get the informed consent from a patient, he compensate only non-economic damages for the infringement of self-determination rights of patient. It's enough for the plaintiff to prove the infringement of self-determination rights, if the plaintiff just want to get non-economic damages. The Korean Supreme court have ruled that if plaintiffs want to get economic damages for the infringement of self-determination rights or informed consent, plaintiffs must prove that the infringement of self-determination rights is the proximate cause of the economic damages of patient. There is another tendency for the Korean Supreme court to limit the damages in medical malpractice cases on the ground of patient's diseases' dangerousness or patient's idiosyncrasy. In the past courts often limit the damages only to 70~80% of total damages, but now a days courts mostly limit the damages to 20~30%. This thesis also introduce the Korean courts' trends about Valuing damages in personal injury actions awarded for gratuitously rendered nursing and medical care.

  • PDF

A Study on the Precautions in light of practical affairs related to a claim for damages under the International Sale of Goods - Focusing on the CISG(1980) and PICC(2004) - (국제물품매매에서 손해배상과 관련한 실무상 유의점에 관한 연구 - CISG(1980)와 PICC(2004)를 중심으로 -)

  • Hwang, Ji-Hyeon;Choi, Young-Joo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.55
    • /
    • pp.155-181
    • /
    • 2012
  • This study considered as precautions in light of practical affairs related to a claim for damages focusing on CISG (1980) and PICC (2004). Given summarizing contents of this study, those are as follows. First, when exercising a claim for damages, proving the damages may be difficult and hard. Thus, there is necessity for stating the liquidated damages clause in contract given conclusion of contract. Second, as for the application of interest rate given a claim for interest, CISG is not covered interest rate. PICC is covered interest rate. However, there is possibility that PICC will not be applied as general principles. Thus, to remove this insecurity and uncertainty, there is necessity for stating this in contract by deciding on the detailed standard stipulation after fully discussing about interest payment with the counterpart given sale contract. Third, when a seller delivered non-conformity of the goods for contract, a buyer is desirable to exercise by discreetly judging the exercise method or limitation element on a problem of selecting and exercising remedy favorable to oneself out of a claim for damages and a right to reduce the price. Finally, There was suggestion that the contract parties are desirable to utilize by modifying and supplementing properly this in line with own business-based necessity and situation based on the ICC Model International Sale Contract, and to state CISG and PICC the governing law clause, in preparing contract. This study is expected to possibly become guideline in which the damaged party exercises a claim for damages or aims to cope with the counterpart's exercising a claim for damages.

  • PDF

A Study on Method for Damage Calculation Caused by Bid Rigging in Alternative Tenders for Construction Projects -Utilizing the Difference of the Design Score & Bidding Rate as Factor - (건설공사 대안입찰 담합으로 인한 손해액 산정모델 연구 - 설계점수 및 투찰률 차이 인자 활용 -)

  • Min, Byeong-Uk;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.5
    • /
    • pp.741-749
    • /
    • 2018
  • The purpose of this study is to propose a rational and scientific damage calculation model in relation to damages caused by bid rigging in construction projects. Previous studies and precedents in relation to calculating damages from bid rigging suggest that the main issue was the lack of consideration in standards for deciding successful bids, selection of inadequate standard comparative markets, insufficiency in analyzing the appropriateness of competitive bid price influence factors, and absence of calculation model verification. In order to improve on these issues, a damage calculation method on alternative tenders for construction projects was proposed. For this calculation model, first, a standard market adequate to the successful bid selection standards was determined, second, an appropriate factor was selected by analyzing the correlation between competitive bid price influence factors, and third, a regression analysis was conducted on the selected factor. Lastly, this was demonstrated through verification of appropriateness, significance & normality of the proposed model and application of actual bid rigging cases. Through the proposed calculation model, this study seeks to serve as a base to prevent opportunity damages for parties involved in related court cases by early resolution of disputes and relief from issues of unfair damage burdens on a particular party.