• Title/Summary/Keyword: CM (Construction Management)

Search Result 443, Processing Time 0.025 seconds

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

The Role of CMP And CMP Association (긴급제언 - CM전문가와 CMP 협의회의 역할)

  • Um, Ik-Joon
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.3
    • /
    • pp.32-34
    • /
    • 2009
  • The number of Construction Management Professional(CMP) is 2700 among 4600 of the total CMPs in Korea. Their characters and abilities are quite different from others. Because they must have 10 year field experiences, complete 180 hours CM oriented lectures and pass the certification test including written and interview in depth. And then, their level of standard is maintained by the Continuous Professional Development(CPD) program, periodic forum, case study seminar and CMP vision execution strategy sponsored by the CMP Association.

  • PDF

Development of the Pilot Type Machine for Automation of PHC Pile Cutting Work (PHC 파일 두부정리 자동화를 위한 파일롯타입 장비의 개발)

  • Lee Jeong-Ho;Park Sang-Jun;Jeong Myung-Hoon;Kim Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.173-181
    • /
    • 2003
  • During the last few years, the use of Pre-tensioned spun high strength concrete piles(PHC pile) has been gradually increased in many construction sites. Cutting work of the concrete pile is an important task to crush a part of pile head which is compressed with more than 800$\cal{kg}f/cm^2$. It is usually performed by a crusher and three to four skilled workers. Recent analysis results of the pile cutting work reveal that it frequently makes a lot of cracks which significantly reduce the strength of the pile and is labor-intensive work. The primary objective of this study is to propose conceptual designs for developing an automated pile cutting machine. It is anticipated that the development of the automated pile cutting machine would be able to bring improvements in safety, productivity, quality as well as cost saving.

A Promotion Plan through Measuring the Utilization of Information Classification Systems in the Construction Industry (건설정보 분류체계 활용도 측정을 통한 분류체계 활성화 방안)

  • Park, Hwan-Pyo;Lee, Jae-Seob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.90-100
    • /
    • 2004
  • The importance of information management has been emphasized in Korean construction industry, Both public and private have invested to establish and operate construction CALS, construction management (CM), computer integrated construction(CIC), and earned value management system(EVMS). A standard construction information classification system is essential to operate the systems mentioned above. Therefore, Korean government released Integrated Construction Information Classification System(ICICS) in 2001. However, the ICICS is not widely used in construction due to: 1) difficulty of changing existing system, 2) insufficient publicity of the ICICS, and 3) no legal binding force. Especially, participants in construction do not recognize applicability of the ICICS. This research surveyed the degree of recognition and utilization of the ICICS. This survey includes both customized classification systems used by companies and the ICICS and investigates the degree of utilization and drawbacks. The results show some construction companies use their own classification systems and the others use the ICICS prepared by the government. Furthermore, the degree of recognition is in sufficient. The degree of use in design management, specifications, cost and schedule management is very limited. The publicity and education are critical to induce the utilization of the ICICS. The necessity of revision was recommended based on pilot project study that is performed to measure the degree of application of ICICS on the projects. Therefore, this research proposes the measurement model for information application and analyzes the degree of utilization of the ICICS in different phases of construction.

Life Cycle Costing for HVAC Systems through Case Studies of Domestic Construction Projects (사례분석을 통한 공조설비 LCC분석 개선방안)

  • Yang Hee-Chan;Lee Seung-Hoon;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.279-282
    • /
    • 2002
  • 최근 건설사업시장의 개방과 건설사업관리제도(이하CM)의 도입으로 국내 건설업계 및 생산시스템에도 많은 변화가 일어나고 있다. 이에 따라, 건축물의 초기시설비는 물론 유지관리 및 최종 폐기단계까지의 비용을 종합적으로 고려한 건물생애주기비용(이하 LCC)에 대한 중요성이 증대되었으며 특히 기계장치의 유지관리비 중 많은 부분을 차지하는 공기조화시설 부문에서 LCC가 주로 검토되고 있다. 그러나 국내에서는 공기조화 설비의 LCC에 대한 절차 및 기준 등이 미비하여 효과적인 LCC분석이 이루어지지 않고 있다. 본 연구는 최근 수행된 국내 공기조화 설비분야의 LCC분석 사례를 조사하여, 국내 공조설비의 LCC분석의 문제점을 분석하였다. 또한 사례 분석을 중심으로 공조설비의 LCC분석 절차를 제시하고 이 절차에 따라 7개의 사례를 비교분석하였다. 그 결과, LCC측면에서 최적 대안을 선정하는 경우 각 대안 별로 뚜렷한 차이를 보이고 있는 에너지비용과 초기투자비를 주된 비용요소로 고려하는 것이 가장 효과적인 것으로 나타났다.

  • PDF

DEVELOPMENT AND APPLICATION OF SUBSTRUCTURE NON SUPPORTING FORMWORK FOR TOP-DOWN CONSTRUCTION

  • Mee-Ra Jeong;Hong-Chul Rhim;Doo-Hyun Kang;Kwang-Jun Yoo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.788-793
    • /
    • 2009
  • Constructing substructures by using Top-Down or Downward method needs an efficient formwork system because of difficulties in supporting concrete slabs from the bottom while excavation is in process. Existing underground formwork systems can be classified by three types: graded ground supported type (Slab On Grade, Beam On Grade), suspension type (Non Supporting Top Down Method), and bracket supported type (Bracket Supported R/C Downward). Each method has its own advantages and limits. Application of a specific formwork system for a given construction site is determined by various conditions and affect construction time and cost. This paper presents a newly developed underground non-supporting formwork system, which combines the advantages of a suspension type and a bracket supported type while it overcomes limits of two types. The developed system has a moving formwork which is supported by suspension cables hanging from the bracket placed at the top of pre-installed substructure columns. Then, the moving formwork is repeatedly lowered down for the next floor below to support concrete slab during curing. The details of this bracket and cable supported system have been investigated for the improvement of easiness in construction.

  • PDF

The Effect of PMIS Quality on Project Management Success (PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석)

  • Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2010
  • As one of the key IT applications, the project management information system (PMIS) has played a significant role in construction management processes. This is because PMIS is an information system that gathers, integrates, and disseminates the output of project management processes among project participants, and is used to support all aspects of a project, from initiation through closing. This paper aims to identify the CSFs(Critical Success Factor) of Project Management and quality associated with Project Management Information System (PMIS) in construction projects, to analyze the Effect of PMIS quality on Project Management Success. The CSFs of Project Management and the quality components for PMIS are identified through a review of the literature, and consolidated through interviews with professionals in the construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor), and 253 completed questionnaires were retrieved. To increase the applicability of the results, the respondents consisted of workers spread across various parts of the construction site. Using SPSS 12.0, the data was used to analyze the relationship between PMIS Quality and Project Management Success through multiple regression analysis. These findings help to clarify what the highly prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

Improved Model for Index of Construction Engineer's Competency Evaluation System in Domestic Construction Management (국내 건설사업관리 기술인력 역량평가 개선모델(I2CEC))

  • Kang, Seongmi;Cha, Minsu;Lee, Woojae;Ji, Woojong;Cho, Hunhee;Yoo, Wisung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.47-58
    • /
    • 2020
  • The ICEC (Index of Construction Engineer's Competency) quantifies the competence of construction engineers using such parameters as experience, education, and qualifications and assigns four technical grades (expert, advanced, intermediate, and beginners) to construction engineers according to their scores for the efficient management and loading of technical personnel. However, as of 2020, the seventh year since its implementation, ICEC has shown many problems in its application, unlike its intended purpose. So institutional supplementation is required to provide improvement measures that can cope with the changing labor market environment and complement the current ICEC. Therefore, this study examined the current status of the career management system after the introduction of the ICEC, suggested a career index proportional to the competence of construction engineers from the beginner to the expert level, and developed an effective capability evaluation model I2CEC. The improved model presented in this study provides a means to comprehensively judge the performance, experience, and the professional work abilities of construction management engineers. Furthermore, the results of this study are expected to contribute to the development of efficient manpower and career management systems for enhancing the competitiveness of the domestic construction industry.

Modified heat of hydration and strength models for concrete containing fly ash and slag

  • Ge, Zhi;Wang, Kejin
    • Computers and Concrete
    • /
    • v.6 no.1
    • /
    • pp.19-40
    • /
    • 2009
  • This paper describes the development of modified heat of hydration and maturity-strength models for concrete containing fly ash and slag. The modified models are developed based on laboratory and literature test results, which include different types of cement, fly ash, and slag. The new models consider cement type, water-to-cementitious material ratio (w/cm), mineral admixture, air content, and curing conditions. The results show that the modified models well predict heat evolution and compressive strength development of concrete made with different cementitious materials. Using the newly developed models, the sensitivity analysis was also performed to study the effect of each parameter on the hydration and strength development. The results illustrate that comparing with other parameters studied, w/cm, air content, fly ash, and slag replacement level have more significantly influence on concrete strength at both early and later age.

A Study on General Contractors' Control Measures for Construction Cost Overrun (종합건설사 현장의 원가초과 억제 방안 분석에 관한 연구)

  • Park, Jee Young;Kim, Hyeon Jin;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.27-36
    • /
    • 2024
  • The effective control of cost overrun is a crucial issue for construction companies to secure profitability. Especially in situations where cost pressures are significant due to factors such as rising raw material prices and increased financial costs due to high-interest rate policies, cost overruns resulting from project failures have a highly detrimental impact on the profitability of construction firms. The objective of this study is to analyze the current status of cost overrun control measures adopted by construction companies using the IPA technique and provide key characteristics and implications. The IPA analysis results showed that practitioners in general contractors exhibit a high level of interest and effort regarding cost overrun while the performance level is relatively low. Nevertheless, the measures considered important to control cost overruns generally show a high tendency for execution as well. Cost overrun control measures that show high importance but low execution are primarily related to collaboration and communication sectors. To effectively control cost overruns, enhancing collaboration and communication with construction supervisors/CM, headquarters, and regulatory authorities emerged as the most urgent need. Through this study, the current status and areas for improvement regarding cost overrun control measures in general contractors can be identified. This can be valuable for deriving directions and enhancements for future cost overrun control strategy development.