• Title/Summary/Keyword: Building control

Search Result 3,210, Processing Time 0.032 seconds

Development and evaluation of a pediatric nursing competency-building program for nursing students in South Korea: a quasi-experimental study

  • Koo, Hyun Young;Lee, Bo Ryeong
    • Child Health Nursing Research
    • /
    • v.28 no.3
    • /
    • pp.167-175
    • /
    • 2022
  • Purpose: The present study aimed to develop and examine the effectiveness of a pediatric nursing competency-building program for nursing students. Methods: This was a quasi-experimental study with a nonequivalent control group pretest-posttest design conducted between October and December 2021. The participants included 40 nursing students (20 each in the experimental and control groups) at a university in a South Korean city. The pediatric nursing competency-building program integrated problem-based learning and simulation into clinical field practice. The experimental group participated in the program, while the control group did not. Data were analyzed using the 𝑥2 test, the independent t-test, and repeated-measures analysis of variance. Results: Pediatric nursing competency and clinical performance showed a greater increase in the experimental group than in the control group. However, the change in problem-solving ability in the experimental group was not significantly different from that in the control group. Conclusion: The pediatric nursing competency-building program effectively improved students' pediatric nursing competency and clinical performance.

Active mass damper system using time delay control algorithm for building structure with unknown dynamics

  • Jang, Dong-Doo;Jung, Hyung-Jo;Moon, Yeong-Jong
    • Smart Structures and Systems
    • /
    • v.13 no.2
    • /
    • pp.305-318
    • /
    • 2014
  • This paper numerically investigates the feasibility of an active mass damper (AMD) system using the time delay control (TDC) algorithm, which is one of the robust and adaptive control algorithms, for effectively suppressing the excessive vibration of a building structure under wind loading. Because of its several attractive features such as the simplicity and the excellent robustness to unknown system dynamics and disturbance, the TDC algorithm has the potential to be an effective control system for mitigating the vibration of civil engineering structures such as buildings and bridges. However, it has not been used for structural response reduction yet. In this study, therefore, the active control method combining an AMD system with the TDC algorithm is first proposed in order to reduce the wind-induced vibration of a building structure and its effectiveness is numerically examined. To this end, its stability analysis is first performed; and then, a series of numerical simulations are conducted. It is demonstrated that the proposed active structural control system can effectively reduce the acceleration response of the building structure.

Real-Time Building Load Prediction by the On-Line Weighted Recursive Least Square Method (실시간 가중 회기최소자승법을 사용한 익일 부하예측)

  • 한도영;이재무
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.6
    • /
    • pp.609-615
    • /
    • 2000
  • The energy conservation is one of the most important issues in recent years. Especially, the energy conservation through improved control strategies is one of the most highly possible area to be implemented in the near future. The energy conservation of the ice storage system can be accomplished through the improved control strategies. A real time building load prediction algorithm was developed. The expected highest and the lowest outdoor temperature of the next day were used to estimate the next day outdoor temperature profile. The measured dry bulb temperature and the measured building load were used to estimate system parameters by using the on-line weighted recursive least square method. The estimated hourly outdoor temperatures and the estimated hourly system parameters were used to predict the next day hourly building loads. In order to see the effectiveness of the building load prediction algorithm, two different types of building models were selected and analysed. The simulation results show less than 1% in error for the prediction of the next day building loads. Therefore, this algorithm may successfully be used for the development of improved control algorithms of the ice storage system.

  • PDF

Efficacy of Development Control as a Tool for Monitoring Building Developments in Kenya

  • Omollo, Wilfred Ochieng
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.1
    • /
    • pp.1-17
    • /
    • 2019
  • This study examined the efficacy of development control in the monitoring of building developments in Kenya, a case study of Kisii Town. It focused on the extent to which the 1968 Building Code was enforced by the County Government of Kisii in an attempt to promote quality assurance. The target population comprised 7,430 residential developments from where a sample size of 364 was proportionately and randomly drawn. Research findings indicated that 39% of developers were unaware that their developments should have been inspected during construction. Similarly, awareness of building inspection significantly predicted if developers issued Notices of Inspection to the planning authority to facilitate inspections. Consequently, developers who were unaware that their building constructions required inspection were 99.9% less likely to issue such notices. Moreover, developers who did not obtain development permission were correspondingly 99.9% less likely to issue Inspection Notices. As a result, those who did not issue Notices of Inspection were 99.8% less likely to have their buildings inspected during construction due to lack of records indicating when such constructions had commenced. The study concludes that although the County Government of Kisii is lawfully mandated to monitor building developments in Kisii Town, the function is not well executed. This gap affords developers with an opportunity of not conforming to the approved building plans.

The Configuration of Power Demand Control System (전력수요 제어 시스템 구성 방안)

  • 송언빈
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 1993.10a
    • /
    • pp.107-110
    • /
    • 1993
  • This paper presents the technical requirements and configuration of power demand control system in office building Generally, the peak power demand is occurred in cooling period. For power demand control in existing building, the most effective control points are the motors for air handling units.

  • PDF

Freeform 3D Coordinate Control Technology using CNC Twisted Tube Method -Focused on The ARC in DaeGu- (CNC Twisted Tube공법을 이용한 비정형 3차원 좌표제어 기술 -대구 대표물문화관(디아크)를 중심으로-)

  • Kim, Sung-Jin;Ryu, Geun-seok;Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.227-228
    • /
    • 2012
  • In contemporary architectural practice, flat sections and plan drawings are no longer a primary means of representation and communication with participants. A typical building design has an ornamental exterior wall system and a roof system that should have water-proof quality and drainage function. By comparison, distinction between exterior wall and roof are unclear in freeform buildings, and they are integrated into a concept of a building envelope. This study is to propose 3D coordinate control technology for freeform structure by CNC curved tube method in order to develop a BIM-based envelope design and construction method for freeform building. Because a much wider freeform building construction can be achieved with correct 3D data and easy-to-implement in construction field, the proposed 3D coordinate control technology is highly recommended for practical use instead of the conventional CAD system.

  • PDF

A Study on the Application Effect of DSSC BIPV Window System in Office Building Considering Cooling.Heating.Lighting Energy (냉.난방 및 조명에너지를 통합 고려한 DSSC BIPV창호의 사무소건물 적용 효과 연구)

  • Sim, Se-Ra;Yoon, Jong-Ho;Shin, U-Cheul
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.3
    • /
    • pp.67-72
    • /
    • 2011
  • The aim of this study is to evaluate how much would the building energy consumption be saved by applying DSSC BIPV window which is possible to control the transmittance and express the color in the office building. For this, physical characteristics such as transmittance and reflectance, U-factor of DSSC areanalyzed and an annual energy consumption that is connected to dimming control is calculated when DSSC BIPV window is applied by alternate clear window system. As a result, It is possible to reduce the anannual energy consumption as much as4.1% by just change the clear double window system to DSSC BIPV double window system because the major factor to reduce energy consumption in the office that has much cooling load than other building is SHGC. When the thermal insulation properties of DSSC BIPV window with low-e coating and making triple window are improved, energy saving ratio is about 9%. Plus, energy saving ratio of 25~28% in lighting energy consumption is possible when the dimming control system with DSSC BIPV window is adopt.

MOVEMENT CONTROL OF HIGH-RISE BUILDINGS DURING CONSTRUCTION

  • Taehun Ha;Sungho Lee;Bohwan Oh
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.46-51
    • /
    • 2011
  • High-rise buildings are widely being constructed in the Middle-East, South-East, and East Asia. These buildings are usually willing to stand for the landmark of the region and, therefore, exhibit some extraordinary features such as super-tall height, elevation set-backs, overhangs, or free-form exterior surface, all of which makes the construction difficult, complex, and even unsafe at some construction stages. In addition to the elaborately planned construction sequence, prediction and monitoring of building's movement during construction and after completion are required for precise and safe construction. This is often called the Building Movement Control during construction. This study describes Building Movement Control of the KLCC Tower, a 58-story office building currently being built right next to the famous PETRONAS Twin Towers. The main items of the Building Movement Control for the KLCC Tower are axial shortening and verticality. Preliminary prediction of these items are already carried out by the structural design team but more accurate prediction based on construction stage analysis and combined with time-dependent material testing, field monitoring, and site survey is done by the main contractor. As of September 2010, the Tower is under construction at level 30, where the plan abruptly changes from rectangle to triangle. Findings and troubleshooting until the current construction stage are explained in detail and implementations are suggested for future applications.

  • PDF

Development of Check-list for BIM Based Architectural Design Quality Check (BIM 기반 건축설계 품질검토를 위한 체크리스트 개발 연구)

  • Choi, Jungsik;Kim, Inhan
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.3
    • /
    • pp.177-188
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control check-list for improving the quality of architectural design in BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality control and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control check-list. Finally, the authors have developed automatic quality check system using requirements for efficient quality control based on open BIM.

DEVELOPMENT OF ARCHITECTURAL DESIGN QUALITY CONTROL REQUIREMENTS BASED ON OPEN BIM

  • Inhan Kim;Jungsik Choi;Junho Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.426-432
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control requirement for improving the quality of architectural design in open BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control requirements. Finally, the authors have developed rule based quality check system using requirements for efficient quality control based on open BIM.

  • PDF