• 제목/요약/키워드: Building completion

검색결과 246건 처리시간 0.025초

건설공사 수행에 따른 최종공사비 예측방법에 관한 연구 (A Study On the Predicting Method of the EAC according to the Performance Index of Construction Projects)

  • 이상범
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.105-112
    • /
    • 2002
  • The EVMS(Earned Value Management System) comes from C/SCSC which was first released by the United States Department of Defense in December 1967, and preyed very powerful and efficient project management tool from a lot of practices. Although it is an excellent tool, we can not be succeed appling foreign system due to the differences of construction culture and law between the Korean and US construction industries. EAC(Estimate at Completion) is one of the most important functions in the EVMS. The purpose of this study is to propose the improved EAC method according to the performance indices better than old that and to prove from examples. In advance, the improved EAC method is to estimate more exactly costs and to promote efficiency in construction projects.

거푸집공사 시공성 향상을 위한 거푸집 배치 효율화 지원 모델 - 구조부재 조정을 중심으로 - (A Support Model of Optimum Layout Planning of Forms for Improving Constructability of Formwork)

  • 이동민;임현수;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.212-213
    • /
    • 2013
  • The constructability of Formwork has a importantly influence on the duration and cost in a construction project. However, the existing studies on the formwork are mainly focused on a method of construction. Although a layout planning of forms, especially, is an important factors affecting the constructability and cost, it is done by engineers empirically and intuitionally after completion of structure design. Therefore this study suggest a decision support model for optimal formwork layout model based on the rearrangement of structural members by using Genetic Algorithm to improve constructability of formwork.

  • PDF

고층 사무소 건축의 외부형태에 나타난 조형적 장식 표현에 관한 연구 -1980년 이후 국내 사례를 중심으로- (A Study on the Expression of visual Decoration in External Appearances of High-rise office Architecture)

  • 정광용
    • 한국산업융합학회 논문집
    • /
    • 제5권4호
    • /
    • pp.353-359
    • /
    • 2002
  • The focus of this study is that spacial, material, functional, cubical reasons are visually expressed on high-rise office Architecture in Korea according to the period of their completion. Office buildings are analyzed in three of exterior composition : Lower, Middle, Top part of the Building, Comparing the whole composition of the Building, forty-five types of compositions are extracted ; expression of formal, material, structural, functional Decoration which show the tendencies of Korean office buildings.

  • PDF

리모델링 주택담보대출 규제의 효과적 운영방안 (Methods for Government Housing Regulation of Residential Mortgage Loan related to Remodeling)

  • 이지형;이민주;조규수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.182-183
    • /
    • 2019
  • The amount of multi-aged housing more than 15 years since the completion has increased, and the real estate market caused by apartment remodeling has also increased. The domestic mortgage loan regulation on relocation expense caused by remodeling apply to same limit as that for mortgage loan newly-built apartment. The excessive government housing regulation could be an obstacle for the occupants residential stability of remodeling apartment. To suggest methods for government housing regulation of residential mortgage loan related to remodeling, examples for mortgage loan regulation and mortgage products were studied and compared. It is pointed out that regulation on occupants relocation expense caused by remodeling has to be relaxed and mortgage product development are needed to boost remodeling project.

  • PDF

QFD를 이용한 빅 데이터 기반 성과 모니터링 시스템의 설계방향 도출 (Design Direction of a Big Data based Performance Monitoring System using Quality Function Deployment)

  • 김창원;김태훈;서정훈;임현수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.255-256
    • /
    • 2021
  • The performance measurement of construction projects has traditionally been evaluated as a prerequisite for successful project completion. Considering this importance, the UK and the US are operating quantitative performance measurement systems for construction projects. However, in the case of Korea, there is a limit to the use of existing methods due to the limitation of data collection. Recently, in consideration of the domestic situation, research is being conducted to measure the quantitative performance of a project by using big data including progress and project attribute information. Therefore, this study aims to present the design direction of a performance monitoring system using Quality Function Deployment.

  • PDF

지속가능한 건설사업관리를 위한 발전방안 (Suggestions for Sustainable Construction Project Management)

  • 이승훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF

건설현장 여성 기술인력의 업무능력 분석 (Analysis of the working ability of female engineers in Construction Field)

  • 이대형;이준용;신원상;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.91-92
    • /
    • 2022
  • The construction industry is highly dependent on human resources and changes the degree of completion of construction work depending on the level of performance of engineers. As women's social advancement has recently expanded, the construction industry is also experiencing a large influx. Therefore, it can be seen that not only male engineers' ability to carry out work but also female engineers' ability to carry out work is important. Therefore, this study investigated the actual work conditions and work performance capabilities of female engineers and presented them as basic data for the construction of work capability improvement measures.

  • PDF

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

건설공사 사후평가결과보고서 표준화 방안 (Standardization for Post-Construction Evaluation Report)

  • 김경훈;이찬규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2023
  • According to relevant laws, in the case of a construction project with a total construction cost of 30 billion won or more, a post-construction evaluation must be performed after completion. In addition, a post-construction evaluation report must be prepared and entered into the Continuous Acquisition & Life-cycle Support(CALS). As a result of reviewing the currently accumulated post-construction evaluation reports, since the report is not standardized, it is difficult for public project owners to write the report. It also hinders the post-construction evaluation and management center from verifying contents, analyzing data, and deriving meaningful results. In order to improve the convenience of the public owners who must conduct post-construction evaluations and the work efficiency of the center, evaluation factors were standardized and a standard post-construction evaluation report format for road construction was developed in Excel. Through this, the data in the reports will be effectively accumulated, managed, and analyzed, so that meaningful results will be produced and be helpful in future construction work.

  • PDF

Project Financing의 책임준공에 대한 법률 분석 및 해외 사례 분석 (Legal Analysis and Overseas Case Analysis of Project Financing's Responsibility )

  • 최지은;김원창;이태규
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.171-172
    • /
    • 2023
  • As a result of analyzing related laws and cases regarding the problems of PF requiring construction companies to guarantee liability for the entire scope of construction, including firefighting facility construction, the law requires repayment ability, and the capital ratio of PF in Korea is 10%. , Since the equity capital ratio of PF in the United States is 30%, it is judged that it is necessary to reduce the dependence of construction companies.

  • PDF