• Title/Summary/Keyword: Building Waste Management System

Search Result 52, Processing Time 0.026 seconds

Industrialized Building Systems for the Kingdom of Saudi Arabia

  • Santoso, Try P.;Trigunarsyah, Bambang;Hassanain, Mohammad A.;Tuffaha, Firas
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.73-79
    • /
    • 2017
  • Rapidly expanding population in the Kingdom of Saudi Arabia has a massive impact to put pressure on the shortage of housing and existing infrastructure. With average population growth rate of 1,9% yearly, the population in Saudi Arabia is projected to increase from 31 million in 2015 to 37 million in 2025. According to the housing ministry, Saudi Arabia needs to provide 3.3 million units to meet the demand in 2025, which is about 300,000 unit a year. In the past 40 years, using the conventional construction method, the Saudi construction industry was only able to build about 150,000 units per year. To meet the demand gap for the housing shortage, a new approach and innovation in construction methods are needed. Industrialized construction as an approach in construction methods has been studied and implemented in some countries that experienced similar corncerns. Industrialized construction can be defined as the implementation of manufacturing methods to construction-related activities to improve quality, reduce cost and project duration. Compared to the conventional construction method, prefabrication as industrialized construction methods has reduced construction labor on-site by 9.5%, construction project duration by 20%, and construction waste by 56%. It improves the quality, durability and cost saving not only for construction project owners, but also construction contractors. This paper discusses the possibility of 'industrialization' of building system in the Kingdom of Saudi Arabia as a solution for the housing shortage. It is an initial part of a study aims to develop a framework to develop industrialized building system in the Kingdom of Saudi Arabia. The is paper based on extensive literature review and case studies.

  • PDF

A Study of the Efficient Planning of Governance for Building Biomass Circulation Estate (바이오매스 순환단지조성을 위한 거버넌스 구축방안 연구)

  • Kwon, Goo-Jung;Lee, Su-Young;Hwang, Jae-Hyun
    • Korean Journal of Organic Agriculture
    • /
    • v.22 no.4
    • /
    • pp.561-579
    • /
    • 2014
  • This research estimates the necessity of a better governance plan on the purpose of fulfillment energy recovery by building resource recycling system for biomass resources and waste resources that derive from agricultural and mountain village areas. The utilization of new renewable energy technology which uses waste and biomass sources diverse as variety of resources, collecting method, operator etc. and is structurally complicated the formation of policy is also very difficult. There is failure because of the problems which occurs from the policy led by government. Biomass Town Development Project should be made through the central government and the local government integrated support system and should be formed a consultative group in order to process the project mutually with these two department including the experts from the related areas. This consultative group, while government organizations carry out the hub function of strategic knowledge management, should carry out the control tower function to be able to be net working transfer the information with the cooperation of private and government so vitalize the communication area among the related actors. And to be able to increase the participation rate of the local people the consistent and various educations should be given so a smooth business promotion progress will be desired through the change of perception and coactive participation of people.

Statistics and Management Systems of Unwanted Domestic and Foreign Fire Alarms (국내·외 비화재보의 통계 및 관리체계에 관한 연구)

  • Hwang, Euy-Hong;Lee, Sung-Eun;Choi, Don-Mook
    • Fire Science and Engineering
    • /
    • v.34 no.2
    • /
    • pp.30-40
    • /
    • 2020
  • In the event of a fire and a disaster, prompt and accurate alarms inside and outside the building are directly related to the minimization of damage and the success of life evacuation. However, due to unwanted fire alarms in automated fire detection systems, the number of dispatches by misunderstanding in the 119 service is increasing. This causes the insensitivity to the safety of building managers and the waste of the fire-fighting power. Therefore, in this study, the statistical databases and literature on unwanted fire alarms in Korea and abroad (USA, UK) were identified and the management systems for unwanted fire alarms were compared and analyzed to identify problems of statistics in the management systems for unwanted fire alarms.

A Study on the Human Resource Management of the Specialty Contractors Performing Multi Projects -Focused on Rebar and Concrete Work- (멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근.콘크리트공사 중심으로 -)

  • Seo, Jong-Min;Na, Young-Ju;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.67-73
    • /
    • 2008
  • Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

Recent Status on the Recycling of Construction Waste and Research Trends - The Current Situation of Recycling Technology for Waste Resources in Korea(4) - (건설폐기물(建設廢棄物)의 리싸이클링 현황(現況)과 연구동향(硏究動向) - 국내자원(國內資源)의 유효이용(有效利用)을 위한 처리(處理) 및 회수기술동향(回收技術動向)(4) -)

  • Oh, Jae-Hyun;Kim, Mi-Sung;Shin, Hee-Duck;Min, Ji-Won
    • Resources Recycling
    • /
    • v.17 no.2
    • /
    • pp.16-29
    • /
    • 2008
  • According to the statistical data of the Ministry of Environment, 47million tons of construction waste were generated, and 96.7% of them was recycled in 2005. However, the recycled products seem to be remained under low quality. Because mixed demolition and construction waste, so called DC Waste, including concrete, brick, plaster, lumber, plastics building materials, paper and some dirt and stone, is very variable and difficult to estimate its exact composition, it is regarded as having little or no value to the construction industry. 'The Research group on recycling of construction waste' was started by the Housing & Urban Research Institute(KNHC), which is sponsored as a large scale national project by the Ministry of Construction and Transportation. This research group intends to establish recycling system through planing, processing, developing practical technology, and eventually contribute to save natural resource and to vitalize the industry. In this paper an overview of DC waste management and recycling technology is given in some detail. Particularly, "recycling law of construction waste" and recent research trends on recycling of construction waste are discussed.

A Study on Development Framework of Lift-up and Procurement System for Effective Resource Management in the Building Construction (건설공사의 자재관리 효율화를 위한 조달 및 양중시스템 기반구축에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.133-139
    • /
    • 2004
  • The purpose of this study is to present an improved lift-up &procurement work flow for effective resource utilization in building construction. The current lift-up &procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up &procurement work flow. The main contents of the study are as follows; 1) Problems of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning was investigated. The study recommends continuous improvement of lift-up &procurement work flow and efficient management of information in building construction as a future research.

A Study on the Solid Waste Collection Districting and Vehicle Routing-Scheduling for Waste Collection Using GIS (GIS를 이용한 생활폐기물의 수거권역설정과 수거차량의 순회경로계획에 관한 연구)

  • 이희연;임은선
    • Spatial Information Research
    • /
    • v.9 no.1
    • /
    • pp.15-30
    • /
    • 2001
  • Solid waste collection service is viewed as one of the most important public services in urban area. The purpose of this study is to apply the GIS based regional partitioning and arc routing methods for solid waste collection districting and vehicle routing-scheduling in order to provide waste collection service more efficiently. In this study, solid waste deposit sites are derived from the centroid of each building and the amount of solid waste is deduced based on the number of households and establishments. The regional partitioning procedure is performed based on waste collection zones which are constructed from waste deposit sites. The result of this study shows that solid waste collection districts which are delineated by regional partitioning method are able to increase efficiencies and cut costs in performing solid waste collection services. Also the output of vehicle-scheduling from the analysis of arc routing may provide more efficiently and quickly manage the scheduling of the residential solid waste collection routes, reducing costs with minimal deadheading costs. Therefore, the application of GIS based on regional partitioning and arc routing methods would be very useful to construct a solid waste management system by supplying the important and flexible informations for solid waste collection districts and vehicle routing-scheduling for waste collection.

  • PDF

Development of Non-Contact Construction Management Supporting System For Cost Reduction and Duration Reduction By Real-Time Data Sharing (건설공사에서 실시간 현장 정보 공유에 의한 원가절감, 공기단축을 위한 비대면 건설사업관리 솔루션 개발)

  • Kang, Sang-Chan;Kim, Min-Jin;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.323-324
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction (건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구)

  • Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2003
  • The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

  • PDF

Establishment of Healthcare Delivery System through Improvement of Health Insurance System (건강보험수가제도 개선을 통한 의료전달체계 확립방안)

  • Oh, Youngho
    • Health Policy and Management
    • /
    • v.29 no.3
    • /
    • pp.248-261
    • /
    • 2019
  • Establishing a healthcare delivery system is key to building a cost-effective healthcare system that can prevent the waste of healthcare resources and increase efficiency. Recently, the rapid increase in the national medical expenditures due to the aging of the population and the increase in chronic diseases has raised the question about the sustainability of the healthcare system including the health insurance system. This is why we need to reform the medical delivery system, including the function setting of medical institutions. Accordingly, gradual and practical efforts based on the recognition of reality are needed for solving the problems and improving the medical delivery system. The first effort is to secure policy measures to establish functions and roles of medical institutions which are the basis of the healthcare delivery system, and a systematic medical use system for appropriate medical use. This approach can be achieved through a reasonable health insurance schemes. Without reasonable reform efforts, it will be difficult for Korea's health care system to develop into a system that can provide cost-effective and high-quality medical services that the people want.